CHAPTER VIII CPM-PERT Instructor : Lect.Volkan ÇETİNKAYA.

Slides:



Advertisements
Similar presentations
System Development Project A project is a series of activities directed towards accomplishment of a desired objective. A project is a temporary endeavour.
Advertisements

464 Lecture 09 CPM Revision. Scheduling Techniques r The scheduling techniques are î To plan, schedule, budget and control the many activities associated.
Chapter 17 Project Management McGraw-Hill/Irwin
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
CHAPTER 17 Project Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
PERT / CPM PERTProgram Evaluation & Review Technique CPMCritical Path Method.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Lecture 9: Scheduling (Chapter 27) Mehran Rezaei.
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
Project Management: A Managerial Approach
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
Operations and Supply Chain Management, 8th Edition
Project Management Techniques.
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Lecture 4 Project Management Chapter 17.
Roberta Russell & Bernard W. Taylor, III
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Project Management: A Managerial Approach
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
PERT and CPM.
PROJECT MANAGEMENT Approaches
PROJECT MANAGEMENT Approaches By- Rahul Jain. Plan your work first…..then work your plan.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Project Scheduling Software
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Network planning models These project scheduling techniques model the project's activities and their relationships as a network. In the network, time flows.
IE 366 Chapter 6, Section 10 Project Planning and Scheduling.
17 Project Management Homework; 1b, 4b, 5b, Sup1, Sup2.
CRITICAL PATH METHOD - PRECEDENCE DIAGRAMS - SANDEEP DIGAVALLI.
Chapter 16 – Project Management
Project Management Project Controlling
PROJECT MANAGEMENT.
Chapter 17 Project Management McGraw-Hill/Irwin
Project Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Planning & Scheduling
PROJECT MANAGEMENT WITH CPM/PERT.
Project Planning and Budgeting
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Chapter 16 – Project Management
Project Management (lecture)
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Project Management (lecture)
Presentation transcript:

CHAPTER VIII CPM-PERT Instructor : Lect.Volkan ÇETİNKAYA

“A project is a series of activities directed to accomplishment of a desired objective.” Plan your work first…...then work your plan!

 PERT: (Project Evaluation and Review Technique  CPM: (Critical Path Method)

 Building, Airport, Roadway and similar construction projects.  Loading of new computer systems.  Design of new products.  Ship Constructing

 When will the project finish?  Which critical activities are there?And not?  What’s the probability of finishing the project in a definite term?  Where is the project?Going on accurately?  Is the project under or below the budget?  Are there adequate resources for the completion of project?  If it is planned to complete the project before planned time, How can it be done by least cost?

 CPM: For certain activities, it may be possible to decrease their completion times by spending more money.How does this affect the overall completion time of the project.  PERT: It has probability, It is for a particular activity the most likely completion time is 4 weeks but it could be anywhere between 3 weeks and 8 weeks.

 CPM: In CPM activities are shown as a network of precedence relationships using activity-on-node network construction.  Single estimate of activity time  Deterministic activity times  Used in Production management-for the jobs of repetitive in nature where the activity time estimates can be predicted with considerable certainty due to existance of past experience

 CPM’de faaliyetlerin süreleri kesin olarak bilinmektedir.  PERT’te faaliyetlerin süre ve maliyetleri kesin olarak bilinmemekte, bu veriler rassal değişkenler olarak atanmaktadır. Dolayısıyla elde edilen kritik yol bir “olasılık kritik yolu”dur.

 PERT: In PERT activities are shown as a network of precedence relationships using activity-on-arrow network construction.  Multiple estimate of activity time  Probabalistic activity times  Used in Project Management-for non-repetitive jobs(research and development works) where the time and cost estimates tend to be quite uncertain.

Advantages - Gantt charts are quite commonly used. They provide an easy graphical representation of when activities (might) take place. Limitations - Do not clearly indicate details regarding the progress of activities - Do not give a clear indication of interrelation ship between the separate activities

 Arrows: An arrow leads from tail to head directionally.It indicates ACTIVITY, a time consuming effort that is required to perform a part of the work.  Nodes: A node is represented by a circle. It indicates EVENT, a point in time where one or more activities start and/or finish.

 Describe the project and important activities.  Describe the relationships among facilities.  Draw the project network.  Determine time and cost of all activities.  Compute the longest way(critical path) of the network.  Use the network to plan, to schedule follow and control the project.

 A new founded company wants to design a product. Below the activities, priority relationships and activity durations were given. Draw the project network. ActivityPredecessorDuration A: Construction of production lines-8 B:Purchasing-11 C: Production of semi finished product-1A10 D: Production of semi finished product-2B7 E: testing of semi finished product-2D13 F: AssemblyC,E15

 □ j = Earliest occurence time of event ‘j’  ∆ j = Latest occurence time of event ‘j’  D ij = Duration of activity

 Forward Pass: (Earliest Occurence Times) The computations start at node 1 and advance recursively to end node n.  Backward Pass : (Latest Occurence Times) Following the completion of the forward pass, the backward pass computations starts at node n and end at node 1.

 An activity(i,j) will be critical if it satisfies these 3 conditions.  □ i = ∆ i  □j = ∆ j  ∆j - ∆i = □j - □ i = Dij

 Time Schedule for Example 3

 Draw the project network  Compute the critical path according to the data below ActivityPredecessorDuration A: Construction of production lines-8 B:Purchasing-11 C: Production of semi finished product-1A10 D: Production of semi finished product-2B7 E: testing of semi finished product-2D13 F: AssemblyC,E15

 PERT: Project Evaluation and Review Technique. Like CPM, but ist is a probabilistic model.  In PERT, activities fall in to 3 categories:  O : Optimistic  P : Pessimistic  M : Medium

 Let’s look at a project with 8 events and 11 activities.  QUESTIONS:  Draw the network of the project.  Compute expected time and variance of each activity.  Find critical path.  Compute the standart deviation of dispersion proving expected time of project.  What is the probability of completion of the project in 19 days or less than 19 days?

 Draw the network of the ship construction project.  Compute expected time and variance of each activity.  Find critical path.  Compute the standart deviation of dispersion proving expected time of project.  What is the probability of project completion in 36 weeks? ActivityNameTRProcessedorOMP APermissionsİzinler-234 BBudget PreperationBütçe Hazırlık-222 CDraft A,B237 DConstructingKaba İnşaatC579 EOuter InstallationDış TesisatD3411 FElectrical WorksElektrik İşleriD3510 GInner Installationİç TesisatE5610 HOuter PaintingDış BoyaG234 IInner Paintingİç BoyaF,H456 JOtherDiğer İşlerH234 KSubmittalTeslimI,J234