Andrew McNab - Manchester HEP - 10 May 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –What are other sites doing? –What are.
Status Report University of Bristol 3 rd GridPP Collaboration Meeting 14/15 February, 2002Marc Kelly University of Bristol 1 Marc Kelly University of Bristol.
Andrew McNab - Manchester HEP - 17 September 2002 Putting Existing Farms on the Testbed Manchester DZero/Atlas and BaBar farms are available via the Testbed.
12th September 2002Tim Adye1 RAL Tier A Tim Adye Rutherford Appleton Laboratory BaBar Collaboration Meeting Imperial College, London 12 th September 2002.
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH Home server AFS using openafs 3 DB servers. Web server AFS Mail Server.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Presenter Name Facility Name EDG Testbed Status Moving to Testbed Two.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Workload management Owen Maroney, Imperial College London (with a little help from David Colling)
Birmingham site report Lawrie Lowe: System Manager Yves Coppens: SouthGrid support HEP System Managers’ Meeting, RAL, May 2007.
Tier1A Status Andrew Sansum GRIDPP 8 23 September 2003.
Martin Bly RAL Tier1/A RAL Tier1/A Site Report HEPiX-HEPNT Vancouver, October 2003.
INFN - Ferrara BaBarGrid Meeting SPGrid Efforts in Italy BaBar Collaboration Meeting - SLAC December 11, 2002 Enrica Antonioli - Paolo Veronesi.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Andrew McNab - Manchester HEP - 6 November Old version of website was maintained from Unix command line => needed (gsi)ssh access.
Site Report HEPHY-UIBK Austrian federated Tier 2 meeting
1 Use of the European Data Grid software in the framework of the BaBar distributed computing model T. Adye (1), R. Barlow (2), B. Bense (3), D. Boutigny.
Andrew McNab - Manchester HEP - 22 April 2002 UK Rollout and Support Plan Aim of this talk is to the answer question “As a site admin, what are the steps.
Cambridge Site Report Cambridge Site Report HEP SYSMAN, RAL th June 2010 Santanu Das Cavendish Laboratory, Cambridge Santanu.
London Tier 2 Status Report GridPP 12, Brunel, 1 st February 2005 Owen Maroney.
RHUL1 Site Report Royal Holloway Sukhbir Johal Simon George Barry Green.
The EDG Testbed Deployment Details The European DataGrid Project
ScotGrid: a Prototype Tier-2 Centre – Steve Thorn, Edinburgh University SCOTGRID: A PROTOTYPE TIER-2 CENTRE Steve Thorn Authors: A. Earl, P. Clark, S.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
27/04/05Sabah Salih Particle Physics Group The School of Physics and Astronomy The University of Manchester
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
C. Loomis – Testbed Status – 28/01/2002 – n° 1 Future WP6 Tasks Charles Loomis January 28, 2002
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
23 Oct 2002HEPiX FNALJohn Gordon CLRC-RAL Site Report John Gordon CLRC eScience Centre.
UCY HPCL Introduction to the CrossGrid Testbed George Tsouloupas UCY HPCL.
March 2003 CERN 1 EDG and AliEn in Prague Dagmar Adamova INP Rez near Prague.
ScotGRID:The Scottish LHC Computing Centre Summary of the ScotGRID Project Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase2 of the.
28 April 2003Imperial College1 Imperial College Site Report HEP Sysman meeting 28 April 2003.
Steve Traylen Particle Physics Department EDG and LCG Status 9 th December 2003
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH OS X Home server AFS using openafs 3 DB servers Kerberos 4 we will move.
Author - Title- Date - n° 1 Partner Logo WP5 Summary Paris John Gordon WP5 6th March 2002.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
Southgrid Technical Meeting Pete Gronbech: 26 th August 2005 Oxford.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
London Tier 2 Status Report GridPP 11, Liverpool, 15 September 2004 Ben Waugh on behalf of Owen Maroney.
Dave Newbold, University of Bristol8/3/2001 UK Testbed 0 Sites Sites that have committed to TB0: RAL (R) Birmingham (Q) Bristol (Q) Edinburgh (Q) Imperial.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
Production Manager’s Report PMB Jeremy Coles 13 rd September 2004.
University of Bristol 5th GridPP Collaboration Meeting 16/17 September, 2002Owen Maroney University of Bristol 1 Testbed Site –EDG 1.2 –LCFG GridPP Replica.
Tier1A Status Andrew Sansum 30 January Overview Systems Staff Projects.
Presenter Name Facility Name UK Testbed Status and EDG Testbed Two. Steve Traylen GridPP 7, Oxford.
HEP Computing Status Sheffield University Matt Robinson Paul Hodgson Andrew Beresford.
Jens G Jensen RAL, EDG WP5 Storage Element Overview DataGrid Project Conference Heidelberg, 26 Sep-01 Oct 2003.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Site Architecture Resource Center Deployment Considerations MIMOS EGEE Tutorial.
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
DataTAG Work Package 4 Meeting Bologna Simone Ludwig Brunel University 23rd and 24th of May 2002.
Rutherford Appleton Lab, UK VOBox Considerations from GridPP. GridPP DTeam Meeting. Wed Sep 13 th 2005.
December 26, 2015 RHIC/USATLAS Grid Computing Facility Overview Dantong Yu Brookhaven National Lab.
Partner Logo A Tier1 Centre at RAL and more John Gordon eScience Centre CLRC-RAL HEPiX/HEPNT - Catania 19th April 2002.
Andrew McNabGrid in 2002, Manchester HEP, 7 Jan 2003Slide 1 Grid Work in 2002 Andrew McNab High Energy Physics University of Manchester.
BaBar Cluster Had been unstable mainly because of failing disks Very few (
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
The EDG Testbed The European DataGrid Project Team
Stephen Burke – Sysman meeting - 22/4/2002 Partner Logo The Testbed – A User View Stephen Burke, PPARC/RAL.
J Jensen/J Gordon RAL Storage Storage at RAL Service Challenge Meeting 27 Jan 2005.
The RAL PPD Tier 2/3 Current Status and Future Plans or “Are we ready for next year?” Chris Brew PPD Christmas Lectures th December 2007.
10/18/01Linux Reconstruction Farms at Fermilab 1 Steven C. Timm--Fermilab.
II EGEE conference Den Haag November, ROC-CIC status in Italy
Software Management Workshop Steve Traylen. Software Management(WG5) The aim of the working group is to look at deficiencies in deployed and upcoming.
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
The EDG Testbed Deployment Details
UK GridPP Tier-1/A Centre at CLRC
Presentation transcript:

2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6

2-Sep-02Steve Traylen, RAL WP6 Test Bed Report2 Current EDG v1.2 Test Bed 15 Dual 1 GHz PIII. 500 MB RAM 40 GB Disks. Gigabit Ethernet – Now network installed. Production test bed = 1 CE, 1 SE + 8 WNs. AFS support recently added. The UI is part of CSF NIS. 600 HEP accounts. 1 Network Monitor, 1 LCFG Server. A ½ TB storage element is available. An information catalogue for RGMA is installed for testing. Nodes are linked into RAL’s local monitoring service.

2-Sep-02Steve Traylen, RAL WP6 Test Bed Report3 Developer’s Nodes Five nodes used by WP3 and WP5. LCFG installed. Root access via SSH keys. Port Scanning Introduced. Improvements –Use AFS home directories. –Use sudo for logging. –Install virtual user mode linux machines via LCFG once RH7 is available.

2-Sep-02Steve Traylen, RAL WP6 Test Bed Report4 Tier1a and EDG Middleware Tier1a, March 2002 –560 cpus, 50 TB disk. 80 TB tape. An EDG CE is LCFG installed for job submission into existing accounts. Static grid mapfile. Existing worker nodes appended with EDG software to the existing CSF service.

2-Sep-02Steve Traylen, RAL WP6 Test Bed Report5 Tier1a and EDG Middleware EDG Job submission into personal accounts is largely untested. Possibly create job submission accounts. Use virtual LANs to allow machines to migrate from CSF to EDG testbed.

2-Sep-02Steve Traylen, RAL WP6 Test Bed Report6 Testbed Configuration Supported VOs: alice, atlas, eo, cms, iteam, wpsix, biome, gridpp and babar. GDMP Configuration. –Now better though only supports one large pool of SEs. Different SEs for different VOs not supported. –Pattern matching on groups and users moves away from gridification. –Move towards mkgridmap for each VO? Process a directory of mkgridmap.conf files?

2-Sep-02Steve Traylen, RAL WP6 Test Bed Report7 UK Deployment Plan of EDG LCFG installation is always recommended. Create an install procedure that does not require previous grid experience with clear and complete instructions. Install procedure has been tested and revised by UK WP6 sites. Support provided by tb-support mailing list on best effort basis and the uk grid support centre on a ticket based system. Formal document written by Andy McNab.

2-Sep-02Steve Traylen, RAL WP6 Test Bed Report8 LCFG Install Procedure Published at A modified Redhat network installation. A script that does almost everything. –Hardens Redhat 6.2 –Sets up Apache, NTP, NFS. –Downloads all the RPMs –Checks out edg-release. –Installs RPMs on the server. –Deletes some files that are never used. Instructions for site-cfg.h and post LCFG instructions. Addition of LCFG-rpm in edg-release would improve the process. Looking for other testers.

2-Sep-02Steve Traylen, RAL WP6 Test Bed Report9 UK Sites Manchester (Andy McNab (wp6)) –Babar, GridPP VO servers, CE, SE and WNs Bristol (Owen Moroney (wp6/8)) –Babar, GridPP RC servers, CE, SE and WNs. Liverpool (Mike George (wp6/4)) –CE, SE and WNs UCL (Paul Mealour (wp7)) and Cambridge (Santanu Das) –CE, SE and WNs Imperial College (Dave Colling (wp1)) –Resource Broker, CE, SE and WNs.

2-Sep-02Steve Traylen, RAL WP6 Test Bed Report10 Common Installation Problems PBS. Quite obscure to set up the first time. WNs on a private network? Firewalls, inbound and outbound port ranges required by some sites. Final registration. Who do I tell that I exist?

2-Sep-02Steve Traylen, RAL WP6 Test Bed Report11 User’s Comments Most of them were good. –JDL is good, file existence checking is good. –VOs are good. Once a member a lot of resources become instantly available. –More resources keep appearing. But –RB still has instabilities but is a lot better.