CLIC Post-Collision Line and Dump Edda Gschwendtner, CERN for the Post-Collision Working Group Rob Appleby (CERN & Cockcroft Institute), Armen Apyan (CERN),

Slides:



Advertisements
Similar presentations
Ideas and Speculations for the Headon Extraction Line L. Keller Oct. 19, Give up the 3.5 m Separation between the Charged Dump and the Incoming.
Advertisements

EXTRACTION BEAM LOSS AT 1 TEV CM WITH TDR PARAMETERS Y. Nosochkov, G. White August 25, 2014.
Collimator Damage Adriana Bungau The University of Manchester Cockcroft Institute “All Hands Meeting”, January 2006.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, Neutrino Factory and Muon Collider Collaboration meeting Sergei.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Zero Degree Extraction using an Electrostatic Separator Take another look at using an electrostatic separator and a weak dipole to allow a zero degree.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
27 June 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit ILC BDS 27 June 06.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
NLC - The Next Linear Collider Project Backgrounds Update Tom Markiewicz SLAC LCWS Cornell 15 July 2003.
Impact of synchrotron radiation in LEPTON COLLIDER arcs
2009 Linear Collider Workshop of the Americas Amann - 10/01/09 Global Design Effort 1 Status Update 18MW ILC Beam Dump Design John Amann Mechanical Engineer.
LCWS 2010 Amann - 3/26/10 Global Design Effort 1 Status Update 18MW ILC Beam Dump Design John Amann Mechanical Engineer SLAC National Accelerator Laboratory.
The Detector and Interaction Region for a Photon Collider at TESLA
NLC - The Next Linear Collider Project NLC Backgrounds What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
Photon Collider at CLIC Valery Telnov Budker INP, Novosibirsk LCWS 2001, Granada, Spain, September 25-30,2011.
Overview of Extraction Line Designs and Issues
Beijing, Feb 3 rd, 2007 LEPOL 1 Low Energy Positron Polarimetry for the ILC Sabine Riemann (DESY) On behalf of the LEPOL Collaboration.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
NEW COMMENTS TO ILC BEAM ENERGY MEASUREMENTS BASED ON SYNCHROTRON RADIATION FROM MAGNETIC SPECTROMETER E.Syresin, B. Zalikhanov-DLNP, JINR R. Makarov-MSU.
CLIC main detector solenoid and anti-solenoid impact B. Dalena, A. Bartalesi, R. Appleby, H. Gerwig, D. Swoboda, M. Modena, D. Schulte, R. Tomás.
AWAKE Electron Spectrometer Simon Jolly, Lawrence Deacon, Matthew Wing 28 th January 2015.
CLIC Post-Collision Line and Dump
Backgrounds in the NLC BDS ISG9 December 10 – Takashi Maruyama SLAC.
Analysis of Beamstrahlung Pairs ECFA Workshop Vienna, November 14-17, 2005 Christian Grah.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Synchrotron radiation at eRHIC Yichao Jing, Oleg Chubar, Vladimir N. Litvinenko.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
LCWS2004 Paris 1 Beam background study for GLC Tsukasa Aso, Toyama College of Maritime Technology and GLC Vertex Group H.Aihara, K.Tanabe, Tokyo Univ.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Beam dump and positron production studies for CEPC and past CLIC studies Armen Apyan Northwestern University Evanston, IL, US 26/05/2014FCC-ee Accelerator.
19 July 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit (via Eric Torrence) VLCW06 19 July 06.
Beam-Beam Background and the Forward Region at a CLIC Detector André Sailer (CERN PH-LCD) LC Physics School, Ambleside 22st August, 2009.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
R. ArnoldCLIC08, CERN, 16 Oct Heat and Radiation in the Water and Shielding in the18 MW Water Dump for ILC Preliminary Results from FLUKA and FLUENT.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
16 February 2009CLIC Physics & Detectors Konrad Elsener 1... some issues regarding the forward region... (“picking up” from Lucie Linssen, 29 Sept 2008)
Mokka simulation studies on the Very Forward Detector components at CLIC and ILC Eliza TEODORESCU (IFIN-HH) FCAL Collaboration Meeting Tel Aviv, October.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Accelerator WG 5 summary Interaction region, ATF2 and MDI Deepa Angal-Kalinin, Lau Gatignon, Andrei Seryi, Rogelio Tomas IWLC
Electromagnetic Background From Spent Beam Line Michael David Salt (Cockcroft Institute – Optics, Backgrounds) Robert Appleby (CERN.
N_TOF EAR-1 Simulations The “γ-flash” A. Tsinganis (CERN/NTUA), C. Guerrero (CERN), V. Vlachoudis (CERN) n_TOF Annual Collaboration Meeting Lisbon, December.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
FCC-ee Interaction Region design
Layout of Detectors for CLIC
Large Booster and Collider Ring
CHEN, Fusan KANG, Wen November 5, 2017
CLIC Post-Collision Line and Dump
Other beam-induced background at the IP
The small crossing angle layout - where are we and what do we do now?
Compact and Low Consumption Magnet Design The DESY Experience
Beam Dump outline work plan (UK perspective)
The 2mrad horizontal crossing angle IR layout for the ILC
Tony Hill Lawrence Livermore National Laboratory
Hongbo Zhu (IHEP, Beijing) On behalf of the CEPC Study Group
Upgrade phase 1: Energy deposition in the triplet
Interaction Region Design Options e+e- Factories Workshop
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

CLIC Post-Collision Line and Dump Edda Gschwendtner, CERN for the Post-Collision Working Group Rob Appleby (CERN & Cockcroft Institute), Armen Apyan (CERN), Barbara Dalena (CERN), Konrad Elsener (CERN), Arnaud Ferrari (Uppsala University), Thibaut Lefevre (CERN), Cesare Maglioni (CERN), Alessio Mereghetti (CERN), Michele Modena (CERN), Mike Salt (Cockcroft Institute), Jan Uythoven (CERN), Ray Veness (CERN), Alexey Vorozhtsov (CERN)

IWLC, 20 October 2010 Edda Gschwendtner, CERN 22 Outline Introduction Background Calculations to the IP Absorbers and Intermediate Dump Magnet System Main Beam Dump Luminosity Monitoring Summary

IWLC, 20 October 2010 Edda Gschwendtner, CERN 33 Design Considerations Transport particles of all energies and intensities from IP to dump Diagnostics (luminosity monitoring) Control beam losses in the magnets Minimize background in the experiments Stay clear of the incoming beam Consequences  Large acceptance  Collimation system  Main dump protection system  Beam diagnostic system

IWLC, 20 October 2010 Edda Gschwendtner, CERN 44 e + e - collision creates disrupted beam –Huge energy spread, large x,y div in outgoing beam  total power of ~10MW High power divergent beamstrahlung photons –2.2 photons/incoming e+e-  2.5 E12 photons/bunch train  total power of ~4MW Coherent e+e- pairs –5E8 e+e- pairs/bunchX  170kW opposite charge Incoherent e+e- pairs –4.4E5 e+e- pairs/bunchX  78 W Some Numbers 50 Hz repetition rate156ns bunch train length 3.7E9 e/bunch 312 bunches/pulse 14MW beam power

IWLC, 20 October 2010 Edda Gschwendtner, CERN 55 Baseline Design 1.Separation of disrupted beam, beamstrahlung photons and particles with opposite sign from coherent pairs and particles from e+e- pairs with the wrong-sign charge particles  Intermediate dumps and collimator systems 2.Back-bending region to direct the beam onto the final dump  Allowing non-colliding beam to grow to acceptable size intermediate dump side view 27.5m 67m 1.5m C-shape magnets window-frame magnets carbon based masks ILC style water dump 4m 315m 6m

IWLC, 20 October 2010 Edda Gschwendtner, CERN 66 Background Calculations to IP

IWLC, 20 October 2010 Edda Gschwendtner, CERN 77 Background Calculations from Main Dump to IP intermediate dump masks window-frame magnets C-shaped magnets Entire Post-collision line geometry implemented Using Geant4 on the GRID  Ongoing: M. Salt, Cockcroft Institute –Neutron and photon background from main beam dump  Preliminary results show that background particles at ‘outer edge’ of the LCD is low and detectors should absorb large fraction of particles.  Even if additional absorbers are needed, space is available in the detector forward region.

IWLC, 20 October 2010 Edda Gschwendtner, CERN 88 From first absorber: 0.73 ± 0.05 photons/cm 2 /bunchX From intermediate dump: 7.7 ± 2.6 photons/cm 2 /bunchX (without absorbers: 530 ± 20 photons/cm 2 /bunchX) IP  Intermediate dump contributes significantly to IP background  But 98% attenuation thanks to magnetic chicane Background from Intermediate Dump to IP M. Salt, Cockcroft Institute 10m

IWLC, 20 October 2010 Edda Gschwendtner, CERN 99 Magnet Protection Absorbers and Intermediate Dump

IWLC, 20 October 2010 Edda Gschwendtner, CERN kW 4kW 6.9kW 131kW 1kW 3.1kW 0.7 kW 1.9kW Opposite charge particles Same charge particles 170kW Absorber Baseline Design 0kW Magnet protection: Carbon absorbers: Vertical apertures between 13cm and 100cm Aperture dimensions tuned such that losses in magnets < 100W/m Intermediate dump (CNGS style): carbon based absorber, water cooled aluminum plates, iron jacket 3.15m x 1.7m x 6m  aperture: X=18cm, Y=86cm  Non-trivial, but solutions for absorbers exist (see dumps in neutrino experiments: 4MW)

IWLC, 20 October 2010 Edda Gschwendtner, CERN 11 Magnets

IWLC, 20 October 2010 Edda Gschwendtner, CERN 12 Dipole names Magnetic length Full magnet aperture horiz. / vert. [m] Full magnet dimensions horiz. / vert. [m] Power consumption Mag1a1b2m0.22 / / kW Mag24m0.30 / / kW Mag34m0.37 / / kW Mag44m0.44 / / kW MagC-type4m0.45 / / kW Designed considerations: average current density in copper conductor < 5 A/mm 2. magnetic flux density in magnet core is < 1.5 T. temperature rise of cooling water < 20° K.  All magnets strength of 0.8 T  In total 18 magnets of 5 different types  Total consumption is 3.3MW Post-Collision Line Magnets M. Modena, A. Vorozhtsov, TE-MSC

IWLC, 20 October 2010 Edda Gschwendtner, CERN 13 Magnets 5.1cm 11.1cm 20.1cm 34.3cm 54.1cm Mag1a Mag1b Mag4 Mag3 Mag2 C- type 40.8 cm incoming beam Mag1a C-type 27.5m 30.5m 38m 46m 54m 75m spent beam 67m Inter- mediate dump 49 cm  Non-trivial, but solutions exist

IWLC, 20 October 2010 Edda Gschwendtner, CERN 14 Main Beam Dump 14

IWLC, 20 October 2010 Edda Gschwendtner, CERN 15 Length 10.0 m Diameter 1.5 m 30.0 cm diameter window (Ti ) 1.0 mm thick 15.0 mm thick Ti vessel Dump axis 15 Baseline Main Dump Design 1966: SLAC water based beam dump: 2.2MW 2008: ILC 18 MW water dump –Cylindrical vessel –Volume: 18m 3, Length: 10m –Diameter of 1.8m –Water pressure at 10bar (boils at 180C) –Ti-window, 1mm thick, 30cm diameter CLICILC Beam energy1500 GeV250 GeV # particles per bunch3.7 x x # bunches per train Duration of bunch train156 ns 950  s Uncollided beam size at dump  x,  y 1.56 mm, 2.73 mm2.42 mm, 0.27 mm # bunch trains per second505 Beam power14 MW18 MW

IWLC, 20 October 2010 Edda Gschwendtner, CERN 16 Main Beam Dump Uncollided beam:  x = 1.56mm,  y =2.73mm  5.6mm 2 Collided beam: Collided 1.5TeV Beam at 150m from IP Disrupted beam beamstrahlung Right-sign coherent pairs 30mm rms Photons Disrupted Beam Coh. Pairs A. Apyan, EN-MEF A. Ferrari et al

IWLC, 20 October 2010 Edda Gschwendtner, CERN 17 Particle Distribution at Entrance Window 17 disrupted e+/e-Coherent pairsPhotons WindowDump A. Mereghetti, EN-STI mm 750mm -750mm 0mm -750mm

IWLC, 20 October 2010 Edda Gschwendtner, CERN 18 Energy Deposition in Main Dump [J cm -3 per bunch train] max ≈ 270 J/cm 3 uncollided beam collided beam (x10) uncollided beam collided beam max ≈ 10 J/cm 3 A. Mereghetti, EN-STI

IWLC, 20 October 2010 Edda Gschwendtner, CERN 19 Main Dump Issues Maximum energy deposition per bunch train: 270 J/cm 3  ILC: 240 J/cm 3 for a 6 cm beam sweep Remove heat deposited in the dump –Minimum water flow of litre/s with v=1.5m/s Almost instantaneous heat deposition generate a dynamic pressure wave inside the bath! –Cause overstress on dump wall and window (to be added to 10bar hydrostatic pressure).  guarantee dump structural integrity: dimensioning water tank, window, etc.. Radiolytical/radiological effects –Hydrogen/oxygen recombiners, handling of 7 Be, 3 H  Calculations ongoing

IWLC, 20 October 2010 Edda Gschwendtner, CERN 20  Total deposited Power: ~6.2W R=15cm Energy Deposition in Beam Window uncollided beam collided beam Ti-window, 1mm thick, 30cm diameter max ≈ 5.7 J/cm 3 uncollided beam collided beam max ≈ 0.13 J/cm 3 A. Mereghetti, EN-STI C. Maglioni, EN-STI

IWLC, 20 October 2010 Edda Gschwendtner, CERN 21 Main Dump Window Considerations Maximum energy deposition per bunch train: 5.7 J/cm 3  ILC: max total power of ~25 W with 21 J/cm 3 Beam dump window needs stiffener, double/triple parallel window system, symmetric cooling, etc… to withstand –Hydrostatic pressure of 10bar –Dynamic pressure wave –Window deformation and stresses due to heat depositions  Calculations ongoing for Temperature behavior, and vessel performance

IWLC, 20 October 2010 Edda Gschwendtner, CERN 22 Luminosity Monitoring

IWLC, 20 October 2010 Edda Gschwendtner, CERN 23 V.Ziemann – Eurotev Luminosity Monitoring Converter in main dump  muons  install detector behind dump –With a Cherenkov detector: 2 E5 Cherenkov photons/bunch e+e- pair production  +  - pair production Beamstrahlung through converter  Produce charged particles  Optical Transition Radiation in thin screen  Observation with CCD or photomultiplier OTR screen (30mm diameter) Converter (1mm thick C) Small magnetic field (10 -3 Tm)

IWLC, 20 October 2010 Edda Gschwendtner, CERN 24 First Results Muon distribution with E> 212MeV behind the beam dump and shielding A. Apyan, EN-MEF Muons/cm 2 /bunch

IWLC, 20 October 2010 Edda Gschwendtner, CERN 25 First Results Muon distribution with E> 50 GeV behind the beam dump and shielding A. Apyan, EN-MEF Muons/cm 2 /bunch Calculations ongoing:  Include Cherenkov counters in simulations  produce non-perfect collisions and track particles through post collision line to see variations in luminosity detectors

Conceptual design of the CLIC post-collision line exists: –Magnets –Intermediate dumps –Background calculations to the IP –Luminosity monitoring: First promising results –Beam dump: first results, calculations ongoing  Improve design on beam dump IWLC, 20 October 2010 Edda Gschwendtner, CERN 26 Summary

IWLC, 20 October 2010 Edda Gschwendtner, CERN 27 Additional Slides 27

IWLC, 20 October 2010 Edda Gschwendtner, CERN TeV 28 Beam at 150m from IP at 1.5TeV Disrupted beam beamstrahlung Right-sign coherent pairs 3cm rms y (cm) x’ max = ±1.6mrad y’ max = ±1mrad 80cm 250 GeV x’ max = ±0.6mrad y’ max = ±0.3mrad Photons: 19cm horizontal shift, but reduced in size 19cm shift  Proof of principle Impact of 500GeV c.m. scenario on post-IP design is minimal 500 GeV c.m. /18.6mrad Option versus 3000 GeV c.m. / 20mrad Option

IWLC, 20 October 2010 Edda Gschwendtner, CERN 29 Summary of Energy Deposition in Main Dump max [J cm-3 per bunch train]tot [W] un-collidedcollidedun-collidedcollided H2O M13.1 M Ti window Ti vessel (side) k17.0 k Ti vessel (upstr. face) Ti vessel (dwnstr. Face) k905.0