RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena.

Slides:



Advertisements
Similar presentations
BE/CO Changes in LS1 to the Software Development Infrastructure and Widely Used Libraries Chris Roderick, Greg Kruk, Katarina Sigerud, Luigi Gallerani,
Advertisements

Handshake over DIP 10/08/20091R. Alemany - BE/OP/LHC.
February 2009 Summary of Chamonix 09 Steve Myers.
BE-CO work for the TS Nov 8 Nov 11P.Charrue - BE/CO - LBOC1.
Injection test? Mike Lamont For initial discussion.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
How to improve operational efficiency ? [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] Beam Commissioning Workshop, Evian Jan 2010.
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
controls Middleware – OVERVIEW & architecture 26th June 2013
Wojciech Sliwinski for BE-CO group Special thanks to: E.Hatziangeli, K.Sigerud, P.Charrue, V.Baggiolini, M.Sobczak, M.Arruat, F.Ehm LHC Beam Commissioning.
E. Hatziangeli – LHC Beam Commissioning meeting - 17th March 2009.
LTC Extended days, 03 March’08 J.M. Jimenez, AT Vacuum Group LHC Vacuum commissioning J.M. Jimenez On behalf of AT-VAC.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
Controls Issues Injection beam2 test meeting 28 th Aug 2008 Eugenia Hatziangeli Input from J. Lewis, M. Sobzak, JJ Gras, C. Roderick, M.Pace, N. Stapley,
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
Access system M. Gruwé (AB/OP) Thanks to TS/ASE group Extended LTC meeting March 3 rd 2008.
Mariusz Sapinski BI/BL Acknowledgements: 1 Planning of quench tests - LMC158 Draft planning of beam induced quench tests at the end of 2013 run LHC Machine.
LHC Sector Test 1 Roger Bailey, Helmut Burkhardt, Paul Collier, Brennan Goddard, Stephen Jackson, Lars Jensen, Rhodri Jones, Verena Kain, Alex.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
Schedule IT General Schedule 9 th, September 09 Today.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Dry runs and cold checkout Markus Albert, Reyes Alemany, Rossano Giachino, Delphine Jacquet, Verena Kain, Belen Salvachua Ferrando, Matteo Solfaroli Camillocci.
Running scenario 2009/10 Run through components – and then synthesis.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
OVERVIEW OF THE NEW FEATURES PVSS SCADA SYSTEMS USED DURING HCC MP3 - Frédéric BERNARD.
MA PM performance, Adriaan Rijllart Post Mortem data handling and performance Adriaan Rijllart, Beno î t Pannetier, Boris Khomenko, Greg Kruk,
Issues concerning Device Access (JAPC / CMW / FESA) With input from: A.Butterworth, E.Carlier, A. Guerrero, JJ. Gras, St. Page, S. Deghaye, R. Gorbonosov,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
V. Kain – eLTC – 7March08 1 V.Kain, S. Gysin, G. Kruk, M. Lamont, J. Netzel, A. Rey, W. Sliwinski, M. Sobczak, J. Wenninger LSA & Safety - RBAC, MCS Roled.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
LHC Section Meeting 1.eLogbook 2.LHC Controls Security Panel.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Suzanne Gysin 1, Andrey D. Petrov 1, Pierre Charrue 2, Wojciech Gajewski 2, Kris Kostro 2, Maciej Peryt 2 1 Fermi National Accelerator Laboratory, 2 European.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
The Dashboard The Working Conditions The Common Chapters State What’s Next.
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
PC Current Interlocking for the SPS Fast Extractions. 1 J. Wenninger July 2009.
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
LSA Core overview 6 / 11 / 2007 Wojciech Śliwiński (AB-CO-AP) on behalf of LSA team.
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Introduction to RBAC Wojciech Sliwinski BE/CO for the CMW/RBAC team
Updated with comments 22 may 2017 Updated again 29 June 2017
Computing infrastructure for accelerator controls and security-related aspects BE/CO Day – 22.June.2010 The first part of this talk gives an overview of.
J. Uythoven for the MPE-MI & MS Teams
Disabling Rules.
Monday 11/07: Recovery Plenty of accesses.
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Week 36 plan Todo’s: And also: 12+b injection.
LHC Morning Meeting - G. Arduini
Presentation transcript:

RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena K., Mike L. 09/06/2009 R. Alemany LHC Beam Commissioning Meeting 1

LHC Operational Mode What is the LHC Operational Mode?  16 bit word in which only 9 bits are used: BIT 0BIT 1BIT 2BIT 3BIT 4BIT 5BIT 6BIT 7BIT 8 SECTOR12SECTOR 23SECTOR 34SECTOR 45SECTOR 56SECTOR 67SECTOR 78SECTOR 81BEAM OPERATION OPERATIONAL (1)/NON-OPERATIONAL (0) USED BY SECTORIZED EQUIPMENT, e.g. PCNON- SECTORIZE D EQUIP e.g. BI + PC 09/06/20092 R. Alemany LHC Beam Commissioning Meeting IF BEAM MODE BIT = OPERATIONAL, SECTOR BITS ARE OVERRIDDEN Which ACCELERATOR MODES are considered OPERATIONAL and which are considered NON-OPERATIONAL: The OPERATIONAL MODE doesn’t change often, it is associated to the ACCELERATOR MODE

Accelerator mode name DescriptionBEAM OP MODE SHUTDOWN Usual winter status. Cold magnets floating. NON-OPERATIONAL COOLDOWN* Coming back from shutdown. The principal activity during this mode is cryogenics related, i.e. simultaneous cool down of several sectors. NON-OPERATIONAL MACHINE CHECKOUT* Cold machine checkout periods following the yearly shutdown. The machine checkout is the final test to take place before the injection of first beam. NON-OPERATIONAL WARM-UP* One or more sectors warming up for repair. NON-OPERATIONAL SECTOR DEPENDENTNON-OPERATIONAL BEAM SETUP Machine commissioning with one or both beams. OPERATIONAL/NON- OPERATIONAL MACHINE TEST* Operations’ tests without beam during normal running periods. OPERATIONAL PROTON PHYSICS Beam based operation aimed at proton physics. OPERATIONAL ION PHYSICS Beam based operation aimed at ion physics. OPERATIONAL TOTEM PHYSICS Beam based operation aimed at TOTEM. OPERATIONAL MACHINE DEVELOPMENT Beam based machine development. OPERATIONAL ACCESS* Access or preparation for said during beam operation. OPERATIONAL RECOVERY* Quench or cryogenics plant disturbance recovery during operation. OPERATIONAL Equipment is accessible by: 1. Outside the LHC CCC  Piquet ROLES 2. Inside the LHC CCC  Expert & LHC Operator ROLES 3 Equipment is accessible by: 1. Anywhere  Expert ROLES 2. Inside the LHC CCC  LHC Operator ROLE

What is a LHC Piquet Role? 4 EIC on shift

LHC Piquet Roles 09/06/20095 R. Alemany LHC Beam Commissioning Meeting Issue 1: if the intervention is finished before the expiration time, the TOKEN associated to the ROLE is still active  be careful. Issue 2: if one removes the user from the DB when the intervention is finished, the TOKEN associated to the ROLE is still active.  Currently the only way to be protected from this is to close the application that has been used to performed the intervention  More reliable solutions are being studied. NAME CONVENTION: XX-LHC-Piquet (e.g. BT-LHC-Piquet, PO-LHC-Piquet) No users in these roles except when needed

Relationship between LHC Operational Mode and Roles: IDCLASSNAMEPROPERTYDEVICENAMEDEVICEGRO UP ROLEAPPLIC ATION LOCATIONOPMODEACCESS ROLE 29126BLMLHCSettingHC.BLM.SR7.LBLM-LHC- DEV-GRP BI-BLM-Expert-LHC CCCOPERATIONALset 29127BLMLHCSettingHC.BLM.SR7.LBLM-LHC- DEV-GRP BI-BLM-Expert--NON- OPERATIONAL set 29128BLMLHCSettingHC.BLM.SR7.LBLM-LHC- DEV-GRP BI-LHC-Piquet--OPERATIONALset 29129BLMLHCSettingHC.BLM.SR7.LBLM-LHC- DEV-GRP LHC Operator-LHC CCC-set 09/06/20096 R. Alemany LHC Beam Commissioning Meeting (Device access map example) If nothing indicated = ANYWHERE/ANYMODE

Accelerator mode name DescriptionOP MODE SHUTDOWN Usual winter status. Cold magnets floating. NON-OPERATIONAL COOLDOWN* Coming back from shutdown. The principal activity during this mode is cryogenics related, i.e. simultaneous cool down of several sectors. NON-OPERATIONAL MACHINE CHECKOUT* Cold machine checkout periods following the yearly shutdown. The machine checkout is the final test to take place before the injection of first beam. NON-OPERATIONAL WARM-UP* One or more sectors warming up for repair. NON-OPERATIONAL SECTOR DEPENDENT NON-OPERATIONAL BEAM SETUP Machine commissioning with one or both beams. OPERATIONAL/NON- OPERATIONAL MACHINE TEST* Operations’ tests without beam during normal running periods. OPERATIONAL PROTON PHYSICS Beam based operation aimed at proton physics. OPERATIONAL ION PHYSICS Beam based operation aimed at ion physics. OPERATIONAL TOTEM PHYSICS Beam based operation aimed at TOTEM. OPERATIONAL MACHINE DEVELOPMENT Beam based machine development. OPERATIONAL ACCESS* Access or preparation for said during beam operation. OPERATIONAL RECOVERY* Quench or cryogenics plant disturbance recovery during operation. OPERATIONAL Here we should be flexible, machine is still under debugging When LHC Piquet Roles will be active? 7

During Beam Commissioning: 09/06/20098 R. Alemany LHC Beam Commissioning Meeting Beam Commissioning WITH Safe Beam: BIT 0BIT 1BIT 2BIT 3BIT 4BIT 5BIT 6BIT 7BIT 8 SECTOR12SECTOR 23SECTOR 34SECTOR 45SECTOR 56SECTOR 67SECTOR 78SECTOR 81BEAM OPERATION OPERATION AL NON- OPERATION AL Beam Commissioning WITH UNSafe Beam: BIT 0BIT 1BIT 2BIT 3BIT 4BIT 5BIT 6BIT 7BIT 8 SECTOR12SECTOR 23SECTOR 34SECTOR 45SECTOR 56SECTOR 67SECTOR 78SECTOR 81BEAM OPERATION OPERATION AL

Switching to RBAC STRICT What RBAC STRICT means? 1.You need a TOKEN which is provided by the client application 2.The token contains a ROLE with RULES: 1.To GET or MONITOR if there are no RULES defined then the command goes through, if there are RULES defined then they are taken into account. 2.To SET THERE MUST BE RULES DEFINED, otherwise access is denied. Then the rules are taken into account to grant access to the equipment. 09/06/2009 R. Alemany LHC Beam Commissioning Meeting 9

Switching to RBAC STRICT Preparation: FGC devices have been in STRICT since the end of Sep ‘08 Preparation: dry runs March ‘09 STRICT mode for PO, BI, BT and RF Preparation: June ’09 – Pierre meets the equipment experts to clean up the ROLES and RULES – Reyes makes sure all the CCC applications implement the RBAC integrator – Expert applications (Java, C++, LabVIEW, PVSS, ) going through CMW have to implement RBAC (via the integrator or custom way) 16 th June: dry run with HWC, QPS and CRYO to understand how the STRICT mode will affect them 09/06/2009 R. Alemany LHC Beam Commissioning Meeting 10

Switching to RBAC STRICT Dry Run: th July ’09  the WHOLE LHC to STRICT. If successful  from the 15 th of July on we’ll work with RBAC STRICT 09/06/2009 R. Alemany LHC Beam Commissioning Meeting 11

LHC OPERATIONAL MODE LSA DB TIMING TELEGRAM OR LHC Sequencer How CMW gets the LHC OPERATIONAL MODE? 09/06/2009 R. Alemany LHC Beam Commissioning Meeting 12 CMW RBAC FESA FE CMW RBAC FESA FE CMW RBAC FESA FE CMW RBAC FESA FE CMW Server B0B1B2B3B4B5B6B7B