NCHRP 20-65 Task 53 Stuart Anderson, Texas A&M Univ. Clifford Schexnayder, Arizona State Univ. Keith Molenaar, Univ. of Colorado Independent Cost Estimates.

Slides:



Advertisements
Similar presentations
UN-HABITAT Inter-Agency Task Force on Disaster Reduction 8 th Meeting, Geneva, Nov Working Group # 3 Tools and Best Practices for Risk and Vulnerability.
Advertisements

Cost Estimation in a Construction Company Under the guidance of Prof. K. Narayanan Department of Humanities and Social Science Indian Institute of Technology,
How to Build a Better Bus Garage: Mn/DOTs Facility Guidebook 18 th National Conference on Rural Public and Intercity Bus Transportation Gerry Weiss, State.
Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Click here to advance to the next slide.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Project Cost Estimating A Synthesis of Highway Practices Presented by: Christine M. Fiori, Ph.D., P.E. Arizona State University.
Transportation Estimators Association Conference Saratoga Springs, New York October 4, 2008 Procedures Guide for Right of Way Cost Estimation and Cost.
FHWA Life Cycle Costs Analysis and Pavement Type Selection Guidance Maryland Concrete 2014 Conference March 18, 2014.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Introduction to Project Management Avneet Mathur
1 Test Planning CSSE 376, Software Quality Assurance Rose-Hulman Institute of Technology March 9, 2007.
Usability Inspection n Usability inspection is a generic name for a set of methods based on having evaluators inspect or examine usability-related issues.
(c) 2007 Mauro Pezzè & Michal Young Ch 1, slide 1 Software Test and Analysis in a Nutshell.
PPA 502 – Program Evaluation Lecture 5b – Collecting Data from Agency Records.
NCHRP 8-60 Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Project phases and the life cycle
Prof. J.J Lew, P.E. Principal Investigator – Purdue Univ. James H. Anspach, P.G. Technical Advisor – So-Deep, Inc. C. Paul Scott, P.E. FHWA Advisor Kevin.
Conceptual Cost Estimating
INTRODUCING THE COST APPROACH Chapter 11. Base cost Builder’s profit Building shell Building size and shape Comparative square-foot method Construction.
Project Management: Madness or Mayhem
Federal Agency Update - A Public Real Estate Symposium Las Vegas, Nevada January 26, 2010 Procedures Guide for Right of Way Cost Estimation and Cost Management.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Software Estimation and Function Point Analysis Presented by Craig Myers MBA 731 November 12, 2007.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
Federal Transit Administration Transit Bus Safety and Security Program Primer for State Departments of Transportation.
Software Life Cycle Models. Waterfall Model  The Waterfall Model is the earliest method of structured system development.  The original waterfall model.
NCHRP Project 8-49 Procedures for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction Draft Guidebook.
Maintenance & Rehabilitation Strategies Lecture 5.
Outreach to State Departments of Transportation 2010 MTAP/SCOPT Annual Winter Meeting Savannah, GA December 8, 2010.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Preparing the Bid Package (A Developers Perspective)
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
PAGE 1 Sustainable Buildings 2030 © 2008 THE WEIDT GROUP Building Energy Benchmarks THE WEIDT GROUP.
In the name of Allah the Most Gracious the Most Merciful.
Chapter 8 Usability Specification Techniques Hix & Hartson.
Evaluating Ongoing Programs: A Chronological Perspective to Include Performance Measurement Summarized from Berk & Rossi’s Thinking About Program Evaluation,
Putting Together a Safety Program Kevin J. Haas, P.E.—Traffic Investigations Engineer Oregon Department of Transportation Traffic—Roadway Section (Salem,
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Definitions of GIS Works with geographic information Performs data input, management, manipulation/analysis, and output functions Composed of hardware,
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
CS223: Software Engineering Lecture 32: Software Maintenance.
1 A latent information function to extend domain attributes to improve the accuracy of small-data-set forecasting Reporter : Zhao-Wei Luo Che-Jung Chang,Der-Chiang.
Conventional Facilities Jan Molander Design Manager Conventional Facilities December 10, 2013.
Atlantic Coast Operations Business Intelligence Mobility Project.
United Nations Statistics Division Overview of handbook on cyclical composite indicators Expert Group Meeting on Short-Term Economic Statistics in Western.
MASON PUBLIC SCHOOLS Bond Committee Meeting #1 August 9, 2016.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
TK2023 Object-Oriented Software Engineering
Project Cost Management
Chapter 3: Cost Estimation Techniques
Service Life of Hot Mix Asphalt using PERMIT
Introduction to Project Management
Data-Driven Safety Analysis
Introduction to Project Management Avneet Mathur
Introduction to Cloud Computing
Budgeting: Estimating Costs and Risks
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Prepared by: Gregory D. Erhardt University of Kentucky Flavia Tsang
Regional Architecture Development for Intelligent Transportation
Software life cycle models
What is Project Cost Management?
SITE ANALYSIS AND SETUP.
Advanced Product Quality Planning 2nd Edition
Advanced Product Quality Planning 2nd Edition
FIVE PROJECT PHASES.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

NCHRP Task 53 Stuart Anderson, Texas A&M Univ. Clifford Schexnayder, Arizona State Univ. Keith Molenaar, Univ. of Colorado Independent Cost Estimates for Design and Construction of Rural & Small Urban Transit Facilities

THESE FACILITIES ARE  Usually small  Numerous, and  Geographically dispersed  Diverse types

DIFFICULT TO ESTIMATE BECAUSE:  Variations in facility function & size  Features differ  Projects often involve renovation  Lack of historical cost data  Unique risk factors impact cost  Estimating processes not structured

PRODUCTS An Excel spreadsheet Conceptual Estimating Tool NCHRP Research Results Digest 397: Independent Cost Estimates for Design and Construction of Transit Facilities in Rural and Small Urban Areas (Project /Task 53). Available late December

In many cases small urban/rural transit managers only one person trying to handle everything. The estimating tool gives this person the ability to easily develop a gross estimate number independent of a consultant.

OUR WORK  Reviewed the literature  Interviewed: DOT staff, Consultants, and Transit managers  Collected design & construction cost data  Identified risk factors  Identified risk frequency levels

EARLY IN THE PROJECT LIFE CYCLE  Project definition still uncertain.  Use a parametric estimating model. Association for the Advancement of Cost Engineering International (AACEI) has a parametric model that supports estimation of buildings.

SOURCES of ESTIMATING DATA RS Means Building Construction Cost Data For feasibility, preliminary, and intermediate cost, use the square-foot cost section of the manual. RS Means Square Foot Costs for final estimates. However, the square-foot cost data fails to reflect small size and remote location transit facility characteristics. Judgment is necessary when using square foot data. Fails to capture the types of facilities

Usable Floor Area Percent of Area Heated Exterior Finish Escalation Factor Rural Area US Average Innercity urban Percent of Area Cooled Estimating Tool

TYPICAL PROJECT SIZE

AVERAGE COST FOR FACILITIES West Coast facilities could be four times more expensive.

RISK MANAGEMENT  Soil conditions (contaminated/unexpected).  Underground features (debris or utilities).  Neighborhood complaints: noise and dust cause construction delays.  Increased scope/ incremental changes in scope.  Higher transportation expenses: projects in remote areas.  Lack of competition (i.e., the number of bidders).

CONTINGENCY Contingency set according to project type, size, location, and characteristics. 10 to 15 percent of construction cost is an often suggested appropriate contingency.

COST ESTIMATING TOOL For administration, operations, maintenance, and vehicle storage type facilities. Developed in MS Excel with five tabs:  Introduction,  User’s Guide,  Project Information,  Estimate Report, and  Estimate Details. The tool supports cost estimating for years 2015 thru 2025.

TOOL BASED ON REGRESSION ANALYSIS Design and construction costs based on similar projects. Functions for costs were obtained through regression analysis. The functions used in the tool to predict future costs during the schematic development phase.

Estimate Report from the Tool

LIMITATIONS The tool only supports conceptual estimating. The database and tool were constructed based on actual historical cost data available for rural and small urban transit facilities.

CONCLUSIONS 1.Target more practitioners involved in rural and small urban transit facility projects for historical data. 2.Instead of actual data use a Delphi process. 3.Most rural and small urban transit projects are combinations of administration, operation, maintenance, and vehicle storage. Thus, it may be better to secure data for such facilities. 4.The data for park and ride, shelter bus stops, un- shelter bus stops, and sign-only bus stops is limited.

THANK YOU A special thanks to Patti Monahan, Executive Director National Rural Transit Assistance Program (National RTAP) For helping us contact Transit agencies across the country. QUESTION S Stuart Anderson, Clifford Schexnayder,