– 1Texas Nodal Texas Nodal ICCP Business Case By Jeyant Tamby, ERCOT.

Slides:



Advertisements
Similar presentations
ATML Readiness For Use Phase II. Phase II Readiness For Use The ATML: Phase II will build on the Core phases, adding additional ATML components and features.
Advertisements

Metasearch Unbound: Corporate Library Perspectives Utilizing Unbundled Software Probing Pros & Cons Canvassing Capabilities Reserving Resources Customizing.
ERCOT Nodal Protocols Telemetry Requirements Proposal
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.
Loads Acting as a Resource Relationships with QSEs and LSEs
EDI Future Environment Initiative Project Kickoff 12/15/2004 Corporate Information Technology.
A Partial Interim Report To WMS Guidance on Implementing Protocol Implementation Plan (PIP) 102 Reactive Power Task Force.
Bert Lathrop Director, IT Infrastructure 10/6/2011 WAN Management Fee - Billing Changes.
AUT S.B.S. - Presentation name - Date - Language - Electronic File Name 1 SCHNEIDER ELECTRIC Solutions.
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
1 Browser Compatibility Assessment TAC Presentation May 28, 2015 David Forfia Director, Enterprise Architecture.
April 3, 2001 Washington, DC 2001 EMS Users Group.
Market Based Solutions for Demand Response Providers Today and the Future Alice Jackson Occidental Energy Ventures Corp.
לירן קציר Connectivity in Computers IEC TC 57 - Power system management and associated information exchange Established in 1964 – with focus.
Administrative Technology Services: Enterprise Applications
© Property of ERCOT /8/20061 TPTF ERCOT 30/60/90 day Plan Raj Chudgar, Nodal Program Manager February 20, 2006.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
ERCOT Wide Area Network Overview & EDS Communication Standard John Fisher ERCOT Network Manager.
Lead from the front Texas Nodal 1 EDS 3 Release 5: SCED Phase 1 Testing Aug 14, 2007.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
SO – CART Project Status Protocol Revision Subcommittee Update 2/23/06.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
System of Systems Architecture Project 1 System-of-Systems (SoSA) TPTF Review Line of Sight Jeyant Tamby November 6, 2006.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
MP Failover DNS Option 1 for API Failover The same DNS structure that allows ERCOT to fail over services between sites can also be used to allow MPs to.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
1 Texas Nodal Presentation Board of Director’s Meeting September 20, 2005.
ERCOT Nodal Readiness Plan Trip Doggett TAC Special Meeting September 7, 2005.
Network Model Management System (NMMS)
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher February 22, 2005.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Discuss Options to Improve Market Visibility to RTBES Presented by: Matt Mereness Friday, October 27, 2006.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
ERS Update – DSWG Presentation September 21, 2012.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010.
1 Browser Compatibility Assessment June 2 nd, 2015.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Scheduling and Operating Transmission Devices in the Nodal Environment.
SGR issues associated with ICCP. 2 ICCP handbook update Split Generation Resources Split Generation Resources are modeled separately by each.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Lead from the front Texas Nodal 1 Current Telemetry Dashboards NDSWG March 24, 2009.
Third Party DR Self-Deployment Loads in SCEDv2 Subgroup Sept. 18, 2015.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
Lead from the front Texas Nodal 1 Nodal Transitional Qualification Approach to Qualifications for the Nodal Market August 16, 2007.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
June 5, 2008 TAC Texas Nodal Market Implementation Program Update Jerry Sullivan.
December 8, 2006 PUCT DR Workshop Status of LaaR Participation in RPRS.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
PRS Workshop- NPRR755/NOGRR154 WAN communications of Critical Market Data and Agency-Only QSE Feb 29, 2016.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
Current FRRS Language & Explanation of Posted Data
Reactive Power Task Force
Presentation transcript:

– 1Texas Nodal Texas Nodal ICCP Business Case By Jeyant Tamby, ERCOT

– 2Texas Nodal Nodal Protocol Requirements The Nodal Protocols require ERCOT to supply certain data via “SCADA or ICCP”. Some Examples: –6.3.2(2) – “Communicate all Base Points, Dispatch Instructions and LMPs for energy and Ancillary Services using ICCP, SCADA, or Verbal Dispatch Instructions” – (4) – “Control signals are provided to the QSE using the ICCP data link or SCADA” – (11) – “ERCOT shall issue Responsive Reserve deployment Dispatch Instructions over SCADA or ICCP for Generation Resources and XML for Load Resources.”

– 3Texas Nodal Current Communication Path

– 4Texas Nodal RTU/DNP – Architectural Issues Communication with the RTUs is accomplished using the DNP 3.0 protocol. Nodal Model will increase DNP data exchange volume by more than 130% The specific issues concerning the current architecture are: –Communication capacity and performance limitations –Lack of a consistent definition of data quality codes across all market participant systems –Maintenance complexity –Lack of support for a security environment

– 5Texas Nodal ERCOT Recommendation for Texas Nodal

– 6Texas Nodal Impact Assessment The level of effort for a particular participant to convert to full ICCP data exchange depends on a number of factors such as: –The total number of RTU points that must be mapped to the ICCP database –The readiness of a system without ICCP to accept an ICCP upgrade –For participants choosing an ICCP gateway, the native protocols available to connect the participant’s system to the gateway and the means by which physical connections can be established

– 7Texas Nodal Conversion Options Relative ComplexityComment (1)No conversion required. None Participant is already exchanging all data via ICCP. (2)Move RTU data to ICCP Small Involves adding all points presently on the RTUs to the ICCP database. (3)Move RTU data to ICCP and configure a new ICCP association with ERCOT Medium Includes the effort of recommendation (2) plus testing new ICCP associations with ERCOT. (4)Procure and implement ICCP via system upgrade or ICCP gateway Large Involves procuring an ICCP communication upgrade or adding an ICCP gateway.

– 8Texas Nodal Conversion Prediction vs. Existing Capability Number of Participants with the stated capabilities Participant Type Current Data Exchange Capabilities Predicted Conversion Option Real-time Data via RTU? Real-time Data via ICCP?ICCP Available? 12QSEYes 2 2QSEYesNoYes 3 7QSEYesNo (or unknown) 4 4TDSPYesNo 4 9TDSPNoYes 1

– 9Texas Nodal Rough Cost Estimates by Option Project PhaseProject Tasks Conversion Options Option 2 - Move RTU data to ICCP Option 2 - Hours Option 3 - move RTU data to existing ICCP and configure a new ICCP association Option 3 - Hours Option 4 - Procure and implement ICCP from a supplier Option 4 - Hours Planning, Specification and Vendor Management Define, select and issue PO. NO $2,60040 Vendor Management NO $2,60040 Vendor DeliverableHardware NO $16,000 Software NO $48,000 Field Setup and Living Expense NO $15, ICCP Configuration/ Build DB Training NO $17, ICCP Configuration/ point definition $22,707349$11,873183$7, DB Build/Load $ Setup Association NO $2,08032$2,08032 ICCP Installation/TestInstallation NO $7, Testing with ERCOTPoint to Point $3,20749$2,12333$1,69026 Production InstallationCutover $5859 9$2,60040 Operation Stability $1,04016$1,04016$3,12048 Total$28,059432$18,221280$126,630964

– 10Texas Nodal Questions?