EU Study development of registries specifications IETA – Bonn SBSTA Laurent Segalen June 2003.

Slides:



Advertisements
Similar presentations
Baker & McKenzie International is a Swiss Verein with member law firms around the world. In accordance with the common terminology used in professional.
Advertisements

Global GHG Market Update Daniele Violetti Team Leader Registration and Issuance Unit Sustainable Development Mechanisms Programme UNFCCC Carbon Forum America.
NATIONAL SYSTEMS UNDER ARTICLE 5 OF THE KYOTO PROTOCOL EC workshop on Quality Control and Quality Assurance of Greenhouse Gas Inventories and the Establishment.
CAPACITY BUILDING WITHIN THE UNFCCC AND LDCS Richard Muyungi United Republic of Tanzania.
European Commission: Environment Directorate General Slide: 1 Linking the EU Emissions Trading Scheme with JI and CDM Linking the EU Emissions Trading.
1 Toshiaki Nagata UNFCCC secretariat Progress on CDM registry development Inter-sessional consultations on registry systems.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
Registry system data exchange General design requirements Pre-sessional Consultations on Registries 19 October 2002 New Delhi, India UNFCCC secretariat.
Session 5 :E-PRTR (EU-ETS) QUALITY CONTROL/QUALITY ASSESSMENT Iksan van der Putte.
1 Andrew Howard UNFCCC secretariat International transaction log Roles and functions Intersessional consultations on.
1 Andrew Howard UNFCCC secretariat International transaction log Checks, public information and modalities Intersessional.
GRETA GREENHOUSE GAS REGISTRY FOR EMISSIONS TRADING ARRANGEMENTS Overview of the UNFCCC registries Workshop on China’s National administration and approval.
1 Andrew Howard UNFCCC secretariat Checks to be performed by the international transaction log Consultations on registry.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
CARBON CONTRACTS - the PCF experience September 30, 2002.
1 United Nations Framework Convention on Climate Change UNFCCC press conference, Bonn, 20 November 2007 Kyoto Protocol “go-live”: data, policies, infrastructures.
1 Andrew Howard UNFCCC secretariat Registry systems and transaction types Consultations on registry systems prior to.
1 Andrew Howard UNFCCC secretariat Registry systems and the data exchange standards Intersessional consultations on registry.
Accounting of Emissions and Assigned Amount under the Kyoto Protocol Clare Breidenich UNFCCC Consultant.
Data Exchange Standards for the interaction with the ITL 08 November 2004 Bonn, Germany Peggy Quarles Perrin Quarles Associates, Inc.
CONTRACTING FOR CARBON Legal Framework for JI Projects under the Kyoto Protocol.
Romania’s Reporting Activities under the UNFCCC and Kyoto Protocol Mr. Vlad Trusca Head of Climate Change Unit, UNFCCC National Focal Point Ministry of.
The Emission Trading Registry. Outline  Understanding the registry system  Opening of the Aircraft Operator Holding Account (AOHA)  Allocation of Aircraft.
1 Transaction log and the data exchange standards Introduction Pre-sessional consultations on registries 2 June 2003 Bonn, Germany Andrew Howard UNFCCC.
Data Exchange Standards in support of transaction processes 08 November 2004 Bonn, Germany Peggy Quarles Perrin Quarles Associates, Inc.
1 Andrew Howard UNFCCC secretariat International transaction log Transaction checks Intersessional consultations on registry.
Introduction of technical paper Funding adaptation in developing countries: extending the share of proceeds used to assist in meeting the costs of adaptation;
Joint implementation, eligibility and the Compliance Committee Andrew Howard, Reporting Data and Analysis Cam Carruthers, Legal Affairs Bonn, October 2007.
Secure Electronic Transaction (SET)
1 Registry Issues for Domestic Emissions Trading and the Kyoto Mechanisms Consultations on Registries Bonn June 2, 2002 Erik Haites Margaree Consultants.
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
UNFCCC secretariat Session 4 Meeting eligibility requirements First UNFCCC workshop on implementation of Article 6 projects under the Kyoto.
CD4CDM Suriname, First National Workshop, April 2008 Climate Change and CDM Institutional Architecture Glenn S. Hodes UNEP Risø Center.
Options and Recommendations Pre-sessional consultations on registries June 2002, Bonn, Germany DEVELOPMENT OF A NATIONAL REGISTRY IN BULGARIA Options.
Possible elements of the technical standards Pre-sessional consultations on registries Bonn, 2-3 June 2002 Andrew Howard UNFCCC secretariat
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. State and Trends of the.
0 Building Registries to Support the Next Generation of Carbon Markets PMR Technical Workshop.
OPTIONS TO USE EXISTING INTERNATIONAL OFFSET PROGRAMS IN A DOMESTIC CONTEXT Case Study: The use of CDM in support of domestic offset schemes Sacramento,
Cooperative Mechanisms UNFCCC secretariat JI under UNFCCC - An overview -
September 23, 2015 Sacramento, CA Zhang Xiaoguang Sinocarbon Innovation & Investment Co.,Ltd. T ITLE ADMINISTRATION OF REGISTRY IN CHINA W ORKSHOP “B UILDING.
La mise en œuvre conjointe : un outil méconnu mais prometteur Université de Montréal, 28 avril 2006 Colloque organisé par le CEDRIE.
Presentation “Green Investment Schemes – greenhouse gas emissions quotas trading mechanisms in Ukraine according to the Kyoto Protocol to the Convention.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Registry to Support Voluntary and Compliance Offset Markets Rachel Tornek PMR Workshop: Building Registries to Support the Next Generation of Carbon Markets.
A French view of the shaping of a National Registry for GHG Allowance trading Presentation to The Registries Workshop prior to SBSTA 16 by Philippe Meunier.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
European Commission: Environment Directorate General Slide: 1 Registry systems for the EU emissions trading scheme SBSTA pre-sessionals Bonn, Germany,
Questionnaire on the development of national registries Andrew Howard UNFCCC secretariat Pre-sessional consultations on registries Bonn,
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Compliance Issues – Kyoto Protocol ______________ M.J. Mace, FIELD Workshop for LDC Negotiators UNFCCC COP 11 and Kyoto Protocol COP/MOP November.
AB © 2003 Baker & McKenzie IETA, Registries Side Event Legal aspects of a registry Anthony Hobley Senior Associate Baker & McKenzie Global Climate Change.
Canada’s CDM & JI Office First UNFCCC Workshop on the Implementation of Article 6 Projects Under the Kyoto Protocol May , 2004 Moscow, Russia Canadian.
Risk Management for Emissions Trading Eeva Lappalainen, Anna Kumpulainen & Tuula Pohjola Environmental and Quality Management Helsinki University of Technology.
Introduction to registry systems
Deputy Head of Federal Accreditation Service Sergey V. Migin Approximation of accreditation systems of European Union and Russia.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
EUETS Registry EUETS Registry; the UK Experience and Changes for Phase III Lee Oliver Workshop on EU Emission Trading Scheme – Monitoring, Reporting and.
66 items – 70% of circulated products
PRESENTATION OF MONTENEGRO
Presentation title User-friendly document – reporting, accounting and review – second commitment period KP 14th meeting of GHG inventory Lead Reviewers.
Eligibility issues and joint implementation
DNV experiences and viewpoints
Issues in linking registries and the transaction log
The various tracks of JI…
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Session 1 Guidelines for projects under Article 6 of the Kyoto Protocol First UNFCCC workshop on implementation of Article 6 projects under the Kyoto Protocol.
Overview of the recommendations on software updates
Joint implementation and eligibility requirements
Allocation, Compliance, Trading etc.
Presentation transcript:

EU Study development of registries specifications IETA – Bonn SBSTA Laurent Segalen June 2003

This presentation was prepared for the IETA Side Event solely in order to explain the content and timetable of the study referenced ENV.E.1/ETU/2002/0014 which is being carried out by CDC IXIS, PwC & Baker & McKenzie for the European Commission and to draw the attention of the Side Event to certain issues arising from this study. All views, opinions and statements in this presentation are only those of PwC. No inference should be drawn that any of the content of this presentation represents in any form or substance the opinion of the European Commission or of its officers nor that any of the proposed schemes herein have been or will be approved or validated by the European Commission or its officers in the context or otherwise of the above-mentioned study. Whilst every effort has been made by PwC to ensure the proposals and schemes shown in this presentation are well founded, no responsibility in any form is assumed by PwC for any actions that any parties may take with respect to any of the proposals and/or statements and content in this presentation. Each party should take its own precautionary measures and conduct its own verifications before basing any action or decision in whatever context on any subject contained in this document. Important Notice

CDC Ixis Baker & McKenzie PricewaterhouseCoopers 3 Prerequisites to functional & technical specifications The EU Directive concerns only legal entities. EU registries will be integrated with Kyoto registries so that each national registry should be able to handle both Kyoto allowances and credits and EU allowances. –There will therefore be only one national GHG registry for each MS. Registries may be maintained in a consolidated system (Art 19) The ETL will be separate from the national registries and or/ any consolidated system of registries Any person may hold allowances (Art 19)

CDC Ixis Baker & McKenzie PricewaterhouseCoopers 4 Registries based on accounting tools Kyoto registries can be considered as accounting tools: One of the main options we have considered so far in this study is the use of the double-entry book-keeping accounting method to account for participants’ positions.

CDC Ixis Baker & McKenzie PricewaterhouseCoopers 5 Functional specifications (1/2) The following functional specifications need to be integrated into the workings of each national registry: –Creation of EAUs –Initial Allocation –Domestic Transfer –International/Regional Transfer –Freezing of transfers in absence of a satisfactory report (Art 15) –Compliance/Retirement –Cancellation

CDC Ixis Baker & McKenzie PricewaterhouseCoopers 6 Functional specifications (2/2) 5 key macro-processes The management of registry accounts The issuance, allocation, cancellation, retirement and eventual banking of allowances The transfer of allowances and credits The assessment of compliance - reconciliation between holdings of allowances and credits and verified emissions The production of reports

CDC Ixis Baker & McKenzie PricewaterhouseCoopers REGISTRY A REGISTRY B ETL X 7 ITL REGISTRY A REGISTRY B ETL X After 2008 Key issue 1: proposed interface ETL / ITL

CDC Ixis Baker & McKenzie PricewaterhouseCoopers Key issue 2: proposed numbering of EUA FR - 00 – Party of origin (ISO 3166 standard) Issuance commitment period Pre-Kyoto # are 00, period from will be 01, etc. Unit type 1=AAU, 3=ERU, 5=CER LULUCF activity This field is relevant to RMUs, for all other instruments = 00 JI or CDM project identifier Unique consecutive #. For non JI or CDM=0000 End block Unique number 12 consecutive number enables identification of instruments by block (Start) Vintage Indicates the year EU tag (ISO standard) Shows that an AAU/ERU/CER has been converted into an EU allowance

CDC Ixis Baker & McKenzie PricewaterhouseCoopers 9 Key issue 3: CPR Question: Should the CPR apply to all legal entities between 2005 and 2008 or should this be consolidated at the EU level? CPR applies only to Parties in the Kyoto Protocol, whereas the EU trading scheme only applies to legal entities (companies, etc.). Consequence: The CPR will not apply to legal entities before 2008 but will have to be respected by Parties from 2008 on. It remains to be determined how the CPR will be applied to legal entities from 2008.

CDC Ixis Baker & McKenzie PricewaterhouseCoopers 10 Key issue 3: CPR Question: Should the CPR apply to all legal entities between 2005 and 2008 or should this be consolidated at the EU level? CPR applies only to Parties in the Kyoto Protocol, whereas the EU trading scheme only applies to legal entities (companies, etc.). Consequence: The CPR will not apply to legal entities before 2008 but will have to be respected by Parties from 2008 on. It remains to be determined how the CPR will be applied to legal entities from 2008.

CDC Ixis Baker & McKenzie PricewaterhouseCoopers 11 Technical specifications: key elements to consider IT Organization (Project Mgmt, Team, Hosting) Technical architecture (incl. web server, application server, database server, LDAP directory server, “Exchange Module”) Communication standards (Exchange Protocols, Authentification, Confidentiality) User Management (Passwd, Security) Business Continuity (Availabity, Disaster, Back-up…)

CDC Ixis Baker & McKenzie PricewaterhouseCoopers 12 Next steps Functional specifications – draft delivered & discussed Technical specifications – draft delivered July / September – draft framework completed

CDC IXIS - Heneage Legge-Bourke B&M - Anthony Hobley PwC - Laurent Segalen