Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.

Slides:



Advertisements
Similar presentations
In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Advertisements

INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
ERS Update Presented to: Demand Side Working Group December 5, 2014.
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
Loads Acting as a Resource Relationships with QSEs and LSEs
Loads in SCED Version 2 Proxy G Proposal. This is a proposal from Carl Raish as an individual … it has not been vetted internally at ERCOT and should.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Price Responsive Load / Retail DR Data Collection Project and Lessons Learned Paul Wattles Karen Farley DSWG March 2014.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Presented By: Mark Patterson ERCOT Manager, Demand Integration November 29, Minute ERS Pilot update to TAC 1.
Price Responsive Load / Retail DR Update to RMS Karen Farley June 3, 2014.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Demand Integration Update to DSWG ERCOT Emergency Responsive Service (ERS) Report to the Public Utility Commission of Texas for the 2013 ERS Program Year.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
ERCOT Demand Response Spring 2015 ERCOT Operator Seminar.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
ERCOT Staff Demand Integration Update to DSWG 3/08/2013 DSWG Meeting.
Voltage Reduction in ERCOT Feasibility Report to ROS Voltage Reduction Task Force.
Weather Sensitive ERS Training Presenter: Carl Raish Weather Sensitive ERS Training Workshop April 5, 2013.
March 7, 2013 Technical Advisory Committee (TAC) meeting update to RMS Kathy Scott March 20, 2013TAC Update to RMS 1.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
NPRR 571 ERS Weather Sensitive Loads Requirements Carl Raish, ERCOT QSE Managers Working Group November 5, 2013.
DSWG – March 9, 2015 Four-CP Response in ERCOT Competitive Area Carl L Raish.
October 14, 2015 LRIS v2 / Self-scheduled Third party DR Provider Data Submission Proposal Carl L Raish.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Price Responsive Load / Retail DR RMS Update Paul Wattles Carl Raish October 6, 2015.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
ERS Update – DSWG Presentation September 21, 2012.
1 Next Steps to Reduce the RTM Settlement Timeline COPS Workshop August 29, 2013 Mandy Bauld ERCOT Director, Settlement & Retail Operations (512)
Retail DR and Price Responsive Load Next Steps – Data Collection Paul Wattles Karen Farley Updates to DSWG & RMS January 2013.
An Overview of Demand Response in California July 2011.
Price Responsive Load / Retail DR DSWG Update Paul Wattles Carl Raish September 17, 2015.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
Long Term Study Task Force Update Modeling Emerging Resources Through 2030 January 13, 2012 LTSTF.
14 Minute Ramp Period Testing Workshop June 30, 2009.
ERS Overview of Upcoming Changes.  Procedure Changes – ERS Generator Resources  Reporting Requirements – ERS Load Resources with Back-Up Generators.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
1 New MO Projects June COMS Extract, Report & Web Services Monitoring & Usage Statistics Jackie Ashbaugh.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Operations Update ERCOT Board Meeting March 18, 2003.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
Third Party DR Self-Deployment Loads in SCEDv2 Subgroup Sept. 18, 2015.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014.
Price Responsive Load / Retail DR RMS Update Paul Wattles Carl Raish September 1, 2015.
Demand Response 2010 and Beyond April 28, 2011 Pete Pengilly.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Draft NPRR Weather Sensitive ERS Loads December 2012.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Emergency Response Service Baselines
ERS Update Mark Patterson, ERCOT Demand Side Working Group
Presentation transcript:

Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013

Background ERCOT Board approved WS ERS Pilot Project in March 2013 to test an ERS product with demand reduction capability that varies based on weather. WS ERS Pilot Features: –Dispatched as early as EEA Level 1 –Fleet-wide testing of Pilot Resources – 8 tests (2 per month) –Maximum of 8 actual EEA deployments –Maximum 3-hour duration for a deployment –Paid based on actual performance with accelerated reductions to discourage over-offering –QSE allowed to increase or decrease number of sites each month within specified limits Procured for June 2013 through September 2013 Contract Period Pilot cost – approximately $111k ERCOT Public November 7, 2013

Pilot Purposes 1.Evaluate the ability of weather-sensitive Loads to provide dispatchable demand response during summer system conditions 2.Evaluate the accuracy of Qualified Scheduling Entity (QSE) projections of demand response capabilities and Load growth 3.Evaluate deployment impacts on end-use customers 4.Identify any unforeseen challenges in procuring, deploying and evaluating the performance of weather-sensitive Loads ERCOT Public November 7, 2013

1. Evaluate Demand Response Capability WS ERS MW offers based on normalized peak conditions 2 Loads procured –1 Residential Load – 2.5 MW –1 Non-Residential Load – 0.1 MW Fleet MW Reductions –Average over 8 tests – 1.78 MW –Range 1.39 – 2.35 MW) –QSE deployment issues affected test results on all but last test –If the deployment issues had been avoided, the fleet likely would have met offer Payment reductions would be imposed –Based on performance alone QSE would have received 68.4% of full payment –Because of low performance, an accelerated reduction would be imposed and QSE would receive 48.5% of full payment ERCOT Public November 7, 2013

2. QSE Projection of Growth 6 Loads submitted through Resource ID Phase of Procurement –2 Loads rejected by ERCOT for failing WS qualification standards 3 Loads offered by 2 QSEs –2 Residential and 1 Non-Residential –1 Residential offer rejected on reasonableness of bid criteria Population growth during Contract Period –Residential Load increased from 1,238 to 2,355 sites Projected sites 1,950 –Non-Residential Load increased from 29 to 64 sites Projected sites 35 ERCOT Public November 7, 2013

3. Impacts on End-use Customers Survey questionnaire has been designed and is being administered by the QSE Survey results not available at this time … results will be reported to Demand Side Working Group when complete ERCOT Public November 7, 2013

4. Unforeseen Challenges – Lessons Learned Participating DR Provider discovered and corrected flaws in their deployment system Third-party access to advanced meter interval data is important to effectively manage these types of demand response programs Payment reduction provisions are effective in creating an incentive for DR Providers to submit achievable offers and to address identified performance issues ERCOT test procedures refined Performance calculations revised to address identified issues ERCOT Public November 7, 2013