Cross fertilisation Technology readiness level From Space and Aeronautic to ITS ? 11/06/2014Topos proposal done by JPhM1
What is TRL ? TRL is a scale to sort a technology in level of « achievement » or readiness TRL was created by NASA in the 80’s to help the decision makers in a common understanding of the level of maturity of a technology TRL is largely used in space and aeronautic sectors but also in other industry such as oil industry TRL is also used as reference for public funding, by instance Canadian government TRL moved also for manufacturing readiness level (MRL 11/06/2014Topos proposal done by JPhM2
Definition done by ESA TRLDescription 1 Basic principles observed and reported 2 Technology concept and/or application formulated 3 Analytical & experimental critical function and/or characteristic proof-of-concept 4 Component and/or breadboard validation in laboratory environment 5 Component and/or breadboard validation in relevant environment 6 System/subsystem model or prototype demonstration in a relevant environment (ground or space) 7 System prototype demonstration in a space environment 8 Actual system completed and "Flight qualified" through test and demonstration (ground or space) 9 Actual system "Flight proven" through successful mission operations 11/06/2014Topos proposal done by JPhM3 Source Wikipedia
Analysis done Source « Les Rendez-Vous de Carnot » Yearly congress from « ASSOCIATION DES INSTITUTS CARNOT », GRAND LYON, RHÔNE-ALPES REGION 11/06/2014Topos proposal done by JPhM4
Canadian example programs/build-in-canada-innovation- program-bcip/program-specifics/technology- readiness-levels 11/06/2014Topos proposal done by JPhM5
Manufacturing Readiness Level 11/06/2014Topos proposal done by JPhM6
Innovation required Yes No Can the market fulfil my needs? functionally demands (Is it for stimulating the market) More R&D (ref. needed) needed? PPI Regular P ublic Procurement PCP, R&D Or other public procurement Procurement processes (Innovation partnerships, competitive dialogue, exclusions, etc…) And for PPI ? 11/06/2014Topos proposal done by JPhM7
Is Bordeaux 2015 ITS World Congress already in your agenda? 11/06/2014Topos proposal done by JPhM8