Software Project Management

Slides:



Advertisements
Similar presentations
Capital Budgeting.
Advertisements

Chapter Outline 6.1 Why Use Net Present Value?
MANAGERIAL ACCOUNTING
Project Selection (Ch 4)
Project Selection Three main categories of methods/approaches:  Strategic approach  Analytical approach  Financial methods.
INVESTMENT ANALYSIS OR CAPITAL BUDGETING. What is Capital Budgeting? THE PROCESS OF PLANNING EXPENDITURES ON ASSETS WHOSE RETURN WILL EXTEND BEYOND ONE.
Hawawini & VialletChapter 7© 2007 Thomson South-Western Chapter 7 ALTERNATIVES TO THE NET PRESENT VALUE RULE.
© 2012 Pearson Prentice Hall. All rights reserved. Capital Budgeting and Cost Analysis.
Capital Budgeting Decisions
ICS 442 Software Project Management
Chapter 3 Program Management and Project Evaluation Professor Hossein Saiedian McGraw-Hill Education ISBN
Systems Analysis & Design 7 th Edition Systems Analysis & Design 7 th Edition Toolkit 3.
1 Investment Appraisal Geoff Leese Sept 1999 revised Sept 2001, Jan 2003, Jan 2006, Jan 2007, Jan 2008, Dec 2008 (special thanks to Geoff Leese)
McGraw-Hill/Irwin Corporate Finance, 7/e © 2005 The McGraw-Hill Companies, Inc. All Rights Reserved. 6-0 CHAPTER 6 Some Alternative Investment Rules.
Chapter 10 - Capital Budgeting
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
Investment Appraisal Techniques
Planning for Risk and Change Geoff Leese Sept 1999 revised Sept 2001, Jan 2003, Jan 2006, Jan 2007, Jan 2008, Dec 2008 (special thanks to Geoff Leese)
What is it? What use is it? How do you do it? What is it? What use is it? How do you do it? Richard Harrison-Murray Research consultant
© 2009 Pearson Prentice Hall. All rights reserved. Capital Budgeting and Cost Analysis.
EE535: Renewable Energy: Systems, Technology & Economics
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
CAPITAL BUDGETING AND CAPITAL BUDGETING TECHNIQUES FOR ENTERPRISE Chapter 5.
Project Selection Three main categories of methods/approaches:  Strategic approach  Analytical approach  Financial methods.
1 © 2012 John Wiley & Sons, Ltd, Accounting for Managers, 4th edition, Chapter 14 Strategic Investment Decisions.
Engineering Economic Analysis Canadian Edition
CHAPTER 21 Capital Budgeting and Cost Analysis To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education.
Financial and Managerial Accounting
PROJECT EVALUATION. Introduction Evaluation  comparing a proposed project with alternatives and deciding whether to proceed with it Normally carried.
Chapter 3 – Opportunity Cost of Capital and Capital Budgeting
FOOD ENGINEERING DESIGN AND ECONOMICS
Capital Budgeting and Investment Analysis
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
Capital expenditure decisions: an introduction
Hawawini & VialletChapter 71 ALTERNATIVES TO THE NPV RULE.
University of Sunderland CIFM02 Unit 3 COMM02 Project Evaluation Unit 3.
CHAPTER 9 Capital Investment Decision Basics
Typical Capital Budgeting Decisions Plant expansion Equipment selection Equipment replacementLease or buy Cost reduction 12-1.
The Systems Analysis Toolkit
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Software Project Management 4th Edition
Software Project Management
Capital Budgeting Decisions
$$ Entrepreneurial Finance, 5th Edition Adelman and Marks 10-1 Pearson Higher Education ©2010 by Pearson Education, Inc. Upper Saddle River, NJ Capital.
Systems Analysis and Design Fourth Edition Introduction  A project is economically feasible if the future benefits outweigh the costs  The Systems Analyst’s.
$$ Entrepreneurial Finance, 4th Edition By Adelman and Marks PRENTICE HALL ©2007 by Pearson Education, Inc. Upper Saddle River, NJ Capital Budgeting.
It is to decide what are the major expenditures or investments a company should make, it’s a method to judge the best investments options to create future.
Basics of Capital Budgeting. An Overview of Capital Budgeting.
Risk Analysis in Capital Budgeting. Nature of Risk Risk exists because of the inability of the decision-maker to make perfect forecasts. the risk associated.
Capital Budgeting. Typical Capital Budgeting Decisions Capital budgeting tends to fall into two broad categories...  Screening decisions. Does a proposed.
IT Project Management MS Sumayya Ajaz Lecture 9. Programme Management Individual projects as components of a programme within the organization. Programme.
PRESENTATION ON FINANCIAL COMPONENT OF A BUSINESS PLAN BY AHMeD Hussain Khan.
TEL2813/IS2820 Security Management Cost-Benefit Analysis Net Present Value Model, Internal Rate of Return Model Return on Investment (Based on Book by.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Capital Budgeting Tools and Technique. What is Capital Budgeting In “Capital budgeting” capital relates to the total funds employs in an enterprise as.
Part I Project Initiation.
Project Evaluation and Programme Management
Capital Budgeting and Cost Analysis
INVESTMENT ANALYSIS OR CAPITAL BUDGETING
Cost Benefit Evaluation Techniques
Capital Budgeting and Cost Analysis
Capital Budgeting and Cost Analysis
Project Selection Three main categories of methods/approaches:
Presentation on Project Selection
Software Project Management
Capital Budgeting and Cost Analysis
GCE PROFESSIONAL BUSINESS SERVICES AS 3
Capital Budgeting and Cost Analysis
Lecture # 4 Software Development Project Management
Capital Investment Appraisal: Appraisal process and methods
Presentation transcript:

Software Project Management Unit – II Presentation

Unit – 2 (Project Evaluation) Projects must be evaluated based on strategic, technical and economic grounds. The success of a project is built on the initial evaluation of organizational and financial feasibility. Project managers must clearly justify the estimation of costs implementation and approve the project. The strategic objectives combined with the outcomes of the project.

1) Strategic Assessment A programme management is where a portfolio of projects all contribute common objective. Eg:- Maintenance work of clients Customer’s experience of the organization might be very variable and inconsistent. A business objective might be consistent and uniform. 2) Technical Assessment Technical Assessment of a proposed system consists of evaluating the required functionality against the h/w and s/w available.

A uniform and consistent hardware/software infrastructure is likely to place limitations on the nature of technical solutions. A uniform and consistent infrastructure must be defined by the organizational policy so that there are no limitations raised.

3) Cost Benefit Analysis An economic assessment of a proposed information system or software product is used to compare the expected costs of development and operation of the system. Assessment focuses on whether the estimated income and other benefits exceed the estimated costs. Two steps, 1) Identifying and estimating all of the costs and benefits of carrying out the project and operating the delivered application.

2) Expressing these costs and benefits in common units. Estimate costs include the developmental, setup and operational costs involved in the process of the new system. Categories of Costs Costs can broadly classified into two groups, Based on system Based on benefits

Many costs are easy to identify and measure in monetary terms. Costs categories are, Development costs Setup costs Operational costs Benefits that are obtained when installing a new system can be classified as, Quantified and valued benefits Quantified but not valued benefits Identified but not easily valued.

4) Cash Flow Forecasting Estimating the overall costs and benefits of a project is the forecasting. A cash flow forecast will indicate when expenditure and income will take place. Typical Product Life Cycle Cash Flow Expenditures occur by means of staff wages during the development stages of the project. At the same instance, unless income is received, expenses cannot be deferred.

Typical product life cycle cash flow Income Expenditure Time Accurate cash flow forecasting is not easy. When estimating future cash flows, it is usual to ignore the effects of inflation. Forecasts of inflation rates tend to be uncertain. If expenditure is increased due to inflation it is likely that income will increase proportionately.

5) Cost Benefit Evaluation Techniques Cost-benefit analysis is a set of practical procedures for guiding public expenditure decisions. Project evaluation usually requires comparing costs and benefits from different time periods. Cash flow forecasting can be compared for different projects based on same general methods defined, Net profit Payback period Return on Investment Net Present Value Internal Rate of return

5.1) Net profit The net profit of a project is the difference between the total costs and the total income over the life of the project. Net profits do not involve the timing of the cash flows. Project incomes are returned only towards the end of the project. 5.2) Payback period The payback period is the time taken to break even or pay back the initial investment. The project with shortest payback period will be chosen on the basis of an organization.

Minimize the time limit. The payback period is simple to calculate but sensitive to forecasting errors. The limitation of the payback period is that it ignores the overall profitability of the project. Advantage Simple to calculate and is not particularly sensitive to small forecasting errors. Disadvantage It ignores the overall profitability of the project.

5.3) Return on Investment The ROI also known as the accounting rate of return(ARR). It provides a way of comparing the net profitability to the investment required. Formula, ROI=average annual profit/total investment*100 It is simple, easy to calculate measure of return on capital. Example:- The net profit of a project is Rs 30,000 and the total investment is Rs 1,00,000. Calculate the ROI if the total period is taken as 3 years.

ROI=average annual profit/total investment*100 30,000*1/3 = ------------------- *100 1,00,000 = 10% 5.4) Net present value The project evaluation technique that is determined by the profitability of a project and the timing of each cash flows that are produced.

Formula, Present value=value in year t/(1+r)t Where ‘r’ – denotes the discount rate expressed as a decimal value. ‘t’ – represents the number of years of future cash flows. Net present value can also be calculated by multiplying the cash flow by the appropriate discount factor. NPV for project is obtained by summing the discounted values and discounting each cash flows.

5.5) Internal rate of return The NPV for project is obtained by discounting each cash flow and summing the discounted values. 5.5) Internal rate of return The IRR is calculated as that percentage discount rate that would produce an NPV of zero. A spreadsheet or a small computer program can be used to calculate the IRR is a convenient and useful measure of value of a project. The limitation of IRR is that it does not indicate the absolute size of the return value.

6.1) Risk Identification and ranking 6) Risk Evaluation Risk is associated with almost every project. Risk can become an important factor when the project is not able to meet its objectives. Every possible risk must be identified, analyzed and minimized during the development of the software system. 6.1) Risk Identification and ranking Every projects evaluation involves risk handling issues. The project evaluation are used to identify the risks and quantify their potential effects.

6.2) Risk and net present value The importance and likelihood are classified as high, medium, low. The project risk matrix may be used as a way of evaluating projects or as a means of identifying and ranking the risks for a specific project. 6.2) Risk and net present value A higher discount rate are used to calculate net present value. Projects may be categorized as high, medium or low risk using a scoring method and risk premiums designated for each category.

Risk matrix to determine Risk Level Likelihood Severity Remote (1) Occasional (2) Frequent (3) Minor (1) 1 2 3 Moderate (2) 4 6 Major (3) 9

Acceptability of Risk Risk Score Risk Level Acceptability of Risk Recommended Actions <3 Low Risk Acceptable No additional risk control measures required. To continue to monitor to ensure risk do not escalate to higher level. 3 – 4 Medium Risk Moderately Acceptable Acceptable to carry out the work activity; however, task need to be reviewed to bring risk level to As Low As Reasonably Practicable. Interim control measures such as administrative controls can be implemented. Supervisory oversight required. >4 High Risk Not Acceptable Job must not be carried out until risk level is brought to at least medium risk level. Risk controls should not be overly dependant on personal protective equipment. Controls measures should focus on Elimination, substitution and engineering controls. Immediate Management intervention required to ensure risk being brought down to at least medium level before work can be commenced.

6.3) Cost benefit analysis The evaluation of risk are considered based on the possible outcome and estimate its probability. The value of the project is then obtained by summing the cost or benefit for each possible outcome weighted by its corresponding probability. It is used in evaluation of large projects. It is most appropriate to evaluate a portfolio of projects to determine the overall profitability. 6.4) Risk profile analysis The construction of risk profiles uses the sensitivity analysis.

It evaluate the sensitivity of the project to each factor. Sensitivity analysis vary each factor one at a time. Sensitivity analysis identifies the factors that yields a success to the project and decide about whether to carry on with the project or lay off. The simulation tool is used to find out the number of possible chances of specific project.

The main activities of the Risk Paradigm are, Identify Analyze Plan Track Control Communicate

6.5) Using decision trees Advantage Decision trees is a tool which provides evaluation of project’s expected outcomes and choosing between the alternative strategies. The analysis of a decision tree consists of evaluating the expected benefit of taking each path from a decision point. The expected value of each path is determined by the sum of the value of each possible outcome multiplied by its probability of occurrence. Advantage It will give a precise idea of modeling and analyzing the problems in the project.

Decision trees NPV Expansion 0.2 -100,000 Extend No expansion 0.8 75,000 Replace Expansion 0.2 250,000 No expansion 0.8 -50,000 Decision tree