Slide 1 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 ACAS / ASAS interaction IAPA Project Thierry.

Slides:



Advertisements
Similar presentations
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Advertisements

The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project CARE-ASAS Activity 3: Airborne Separation Minima Final.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
Mission Trajectory Step 1 From planning to deployment.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
ENAV S.p.A. ASAS TN I Workshop, April 20031/13 Airborne Spacing and Safety Alberto Pasquini - Deep Blue (ENAV)
Mediterranean Free Flight ASAS Separation and Spacing Presented by Andy Barff – Project Leader MFF Real-time Simulations ASAS-TN, Malmö
C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE ASAS-TN, 2nd workshop - Malmö 6 ~ 8 october 2003page 1 Electronic separation Clearance Enabling the Crossing.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,
NOTICE: The contents of this document are proprietary to Rockwell Collins, Inc. and shall not be disclosed, disseminated, copied, or used except for purposes.
ASAS TN Third Workshop, April 2004, Toulouse 1 ASAS Implementation in Avionics Pierre GAYRAUD Thales Avionics in collaboration with ACSS.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
SESAR and ASAS Opportunity
Applications from packages I to III
TCAS Basics Capt Craig Hinkley. 2 TCAS HISTORY  Two planes collided over the Grand Canyon  Alternative airborne version using transponders.
Interoperability of Airborne Collision Avoidance Systems Lixia Song James K. Kuchar Massachusetts Institute of Technology.
Federal Aviation Administration ASAS issues identified in the AP23 work ASAS-TN2.5 workshop 13 Nov 08, Rome By Jean-Marc Loscos, DSNA.
1 CoSpace Experimental results on sequencing & merging Karim Zeghal ASAS Thematic Network, Second workshop 6-8, October 2003, Malmö, Sweden.
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
Slide 1 July 2004 – FALBALA/WP5/FOR3/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP2 Current situation analysis – Aircraft perspective Philippe Louyot (CENA)
ASAS FRA OB/T ATM Projects Lufthansa point of view.
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
1 Airborne spacing in the terminal area: A study of non-nominal situations EUROCONTROL Experimental Centre European Organisation for the Safety of Air.
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS Thematic Network First Workshop Outcome Eric Hoffman 6-8th October Malmö.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
EUROCONTROL European Organisation for the Safety of Air Navigation.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
NUP Phase 2 – Extended Visual Acquisition (EVA) and Airborne Approach Spacing (AAS) Oliver Reitenbach / DFS, Matthias Groth / DLH September 2005 / Slide.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
2 nd Workshop, April 2006 Session 4: Integrating ASAS in an evolving ATM system.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
Final Seminar, Paris, April 2008 ASAS in the SESAR Master Plan Fraser McGibbon (BAE Systems) Andy Barff (EUROCONTROL EEC) ASAS-TN2 Seminar Paris.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Eurocontrol ACAS Programme ACTOR/wp3/SLID/D 03/08/01 - v1.0 Slide 1 ACAS II operations in the European RVSM environment ACAS II mandate in Europe (1/2)
1 Controller feedback from the CoSpace / NUP II TMA experiment ASAS-TN, April 2004, Toulouse Liz Jordan, NATS, U.K. Gatwick approach controller.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
European Organisation for the Safety of Air Navigation RFG ASPA-S&M Requirements Determination ASAS-TN th September Malmo, Sweden.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
ASAS TN Third Workshop, April 2004, Toulouse Session 1 Use of the System by pilots and controllers Tony Henley.
Alberto Pasquini – Deep Blue Safety Assessment in MFF ASAS TN2 3-5 April 2006, Rome MENU: COVER | SUMMARY | OVERVIEW | TASKS | ALLOCATIONSCOVER SUMMARY.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
EVAIR Function Manager
Workshop on preparations for ANConf/12 − ASBU methodology
ASSTAR Overview Jean-Marc Loscos, DSNA
Project conclusions and recommendations Thierry Arino (Sofréavia)
Chris Shaw, EUROCONTROL Experimental Centre
ASSTAR Oceanic Session Summary
Workshop on preparations for ANConf/12 − ASBU methodology
Performance Based Navigation: Navigation Specifications
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
Karim Zeghal EUROCONTROL Experimental Centre
Crossing and Passing MA-AFAS
ASSTAR Project Overview & User Forum Objectives
Objectives of the Workshop
Purpose and Structure of the Workshop
Presentation transcript:

Slide 1 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 ACAS / ASAS interaction IAPA Project Thierry Arino – Sofréavia, Project Manager ASAS TN – Session 3 Airborne spacing applications

Slide 2 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 Project overview  Context ACAS (ACAS II) is now part of the current ATM system ASAS is a promising option for the future ATM system Compatibility must be assured between current & future systems  IAPA Project EUROCONTROL ACAS Programme contribution Provide guidelines for the development of ASAS applications (in the context of ACAS / ASAS interaction) Comparative analysis (with & without ASAS) based on data-oriented methodology Structure with 3 phases Phase I (Nov 02/Oct 03): Framework & preliminary analysis Phase II (Oct 03/Oct 04): Full set of simulations Phase III (Oct 04/Jun 05): Final reports & guidelines

Slide 3 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 Preliminary analysis  Context Support the selection of a challenging ASAS application (from an ACAS / ASAS interaction perspective)  Method Construction of artificial encounters involving two aircraft with various performances Identification of encounter parameters influencing the ACAS alert triggering  Study limitations « Perfect » Communication, Navigation and Surveillance Aircraft proportions not representative of a given airspace Case study analysis

Slide 4 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 ASAS applications of interest  Challenging & mature Package I AS applications Availability of documentation & simulation data  Package I / ASPA-S&M application Merging phase In-trail phase  Package I / ASPA-C&P application Lateral overtaking Vertical crossing Lateral crossing  Possible extension of previous ASPA applications into ASEP applications (Package II)

Slide 5 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 ASPA-S&M, merging phase  Parameters of interest Altitude at WPT Required spacing at WPT Angle of convergence at WPT Relative initial speed between leading and trailing a/c  Potential TAs but only with required spacing close to 3 NM (unlikely for typical operations)

Slide 6 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 ASPA-S&M, in-trail phase  Parameters of interest Required spacing at WPT Relative initial altitude and spacing between leading and trailing a/c Length of the base turn  No ACAS alerts when on same leg with required spacing > 3 NM  No ACAS alerts when on opposite legs with base leg length > 3 NM

Slide 7 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 ASPA-C&P, lateral overtaking  Parameters of interest Encounter altitude Track spacing Relative speed between both a/c  No ACAS alerts with track spacing > 3 NM

Slide 8 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 ASPA-C&P, vertical crossing  Parameters of interest Encounter altitude HMD between both a/c Required vertical spacing between both a/c when level Relative vertical and horizontal speed between both a/c  Potential TAs and RAs (EMOTION-7 OP06 issue: Unnecessary RAs in 1000-ft level-off geometries)

Slide 9 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 ASPA-C&P, lateral crossing  Parameters of interest Encounter altitude Required spacing at the track crossing point Angle of convergence at the track crossing point Relative speed between both a/c  TAs very likely with required spacing < 5 NM  Potential RAs if Miss Distance Filtering (MDF) not effective

Slide 10 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 Conclusion  Main outcomes for IAPA Phase I Likelihood & duration of TA: Highly geometry & altitude dependent MDF performance: Critical to prevent undesirable RAs Major influencing factors of ACAS / ASAS interaction Airborne spacing values Aircraft trajectory quality  Framework for IAPA Phase II and III Operational environment definition (ASPA-C&P, lateral crossing) Simulation framework Simplified model of the application behaviour ATM encounter model  Impact of ASAS operations on safety benefit provided by ACAS still to be investigated