CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.

Slides:



Advertisements
Similar presentations
Solomon William KAMUGASA
Advertisements

Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
A Laser Based Alignment System for the CLIC project
CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| | INDICO | page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
H. SCHMICKLER Alignment challenges for a future linear collider.
H. MAINAUD DURAND, BE-ABP/SU, 23/04/2010 STATUS OF THE CLIC PRE-ALIGNMENT STUDIES.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad)
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
D. Missiaen Summaries of the discussion. 2 H. Mainaud Durand The iris diaphragm laser alignment system for Spring 8 storage ring magnets Align multipoes.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
1962 First CMM DEA (Italy) Ahmed CHERIF CERN Metrology lab. CLIC TECHNICAL COMMITTEE – EDMS : EDMS :
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
CTC, Outcome from Two-beam Module Review on15/ G. Riddone,
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
PACMAN : technical objectives Hélène Mainaud Durand.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests
Remote Measurement and Alignment Applications for Survey and Alignment P. Bestmann for BE/ABP/SU
Two-beam module layout
CLIC Parameter Working Group Two Beam Module Design
ALIGNMENT OF THE NEW TRIPLETS
David Urner Oxford University/JAI
Alignment systems in ATLAS: Monitoring of the bedplates
on behalf of the CLIC active pre-alignment team
PACMAN impact on future module design
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Module roadmap to end of 2017
TZ32 tunnel H. MAINAUD DURAND, BE-ABP/SU CTC 07/07/2009.
List of changes and improvements for the next generation CLIC module
Need for Alignment Position of off-momentum proton w.r.t. beam
LCWS 2017 – 26th October C. Rossi
Towards a common mechanical interface
Alignment challenges for a future linear collider
Presentation transcript:

CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design

CLIC Module WG 20/07/2009 H. MAINAUD DURAND BE-ABP/SU 2 SUMMARY Introduction: the pre-alignment strategy Feasibility around 4 key points: o A straight reference known and stable o Submicrometric sensors with a known zero and no drift o Module compatibility  Integration of the pre-alignment systems  Integration of the repositioning solutions  Installation sequences o Simulations Conclusion

3 Overlapping straight references Propagation network  a few microns over more than 200m Proximity network  a few microns over m. PRE-ALIGNMENT STRATEGY CLIC Module WG 20/07/2009 H. MAINAUD DURAND BE-ABP/SU

4 Baseline: straight reference = stretched wire. propagation network : WPS sensors proximity network: WPS sensors PRE-ALIGNMENT STRATEGY Accelerating structures PETS + DB quad on independent girders MB quad pre-aligned independently CLIC Module WG 20/07/2009 H. MAINAUD DURAND BE-ABP/SU

5 Baseline concerning the repositioning systems DB and MB girders pre-aligned with 3+1 DOF (« snake system »)  Natural smoothing  3 motorized DOF (cost advantage)  mechanics tested and validated in CTF2 PRE-ALIGNMENT STRATEGY >

6 Baseline concerning the repositioning systems MB quad pre-aligned with 5+1 DOF PRE-ALIGNMENT STRATEGY Courtesy of F. Lackner CLIC Module WG 20/07/2009 H. MAINAUD DURAND BE-ABP/SU

7 Alternative: propagation network = laser beam under vacuum or stretched wire proximity network = RASNIK PRE-ALIGNMENT STRATEGY CLIC Module WG 20/07/2009 H. MAINAUD DURAND BE-ABP/SU

8 1 st key point: a straight reference, known and stable Issues:long term stability of a wire effects of temperature, humidity creeping effects effects of the air currents  Modelization of the wire using HLS systems but only in the vertical direction but HLS system follows the geoid which needs then to be known  Is a stretched wire really straight (top view)? First idea: comparison with a laser beam under vacuum Inter-comparison of different types of wires and technologies  on short distances (50 m) this autumn at SLAC  on long distances (500m) at CERN CLIC Module WG 20/07/2009 H. MAINAUD DURAND BE-ABP/SU

9 2 nd key point: sub-micrometric sensors Issues:WPS sensor fulfilling the requirements: « absolute measurements » (known zero w.r.t mechanical interface) no drift sub micrometric measurements  Upgrade of the existing WPS sensor better mechanical interface better absolute calibration drift, CEM to be studied in further details  Development of a new WPS sensor 3 microns accuracy and precision to be controlled  Validation in the frame of an inter-comparison with SLAC CLIC Module WG 20/07/2009 H. MAINAUD DURAND BE-ABP/SU

10 3 rd key point: module compatibility Issue: integration of the pre-alignment systems HLS system (horizontal) Proximity sensors (RASNIK), mechanically linked to each cradle WPS system (follows the slope)

11 3 rd key point: module compatibility Issue: design and integration of the positioning systems Case of the DB and MB girders: Concept of snake system validated in CTF2, but with a load 10 times lower. Friedrich raised some questions concerning that concept: 8 contact points providing friction in case of higher load  a complete study of the concept will be undertaken by EN/MME  ZTS proposes a prototype of linear actuator with the following characteristics: load of 500 kg precision better than 0.5 micron (resolution: 0.17/5 micron) length: ~ 350 mm Diameter: ~ 130 mm (but can be decreased to 100 mm easily) Case of the MB quad: o a cam based solution is studied by Friedrich o ZTS proposed another solution: a two dimensional linear actuator allowing the alignment of a load of 500kg, with a precision of 0.5 micron (height: 421 mm, base dimensions: 755 x 350 mm)

12 Pre-alignment mock-up Objectives: Validation of the mechanical concept Possibility of micrometric displacements with waveguides and interconnections Validation of the stability of the components on the girders: The pre-alignment of the CAS (or PETS + quad) on the girder stays within the micron after 25 km of transport. The fiducialisation of the components on the girder stays within the micron after thermal cycles. 3 rd key point: module compatibility

13 3 rd key point: module compatibility Issue:installation considerations The propagation network must be installed and determined at the beginning, once the geodetic network is known. (to allow a positioning of actuators and sensors within their range) Geodetic network Metrological plate The metrological network consists of overlapping stretched wires and metrological plates (every 100 m if the wire length is 200 m)

14 3 rd key point: module compatibility Issue:installation considerations For each module, and adjustable plate with the actuators will be installed and pre-aligned w.r.t this metrological network Once the module (or MB quad) is in place, its relative alignment is performed w.r.t the metrological network  the joining of the interconnection is possible Once all the modules in a sector (pit to pit) are installed, the positions of the elements are computed  pre-alignment of the modules (and MB quads) Once no more access in the tunnel, implementation of the active pre- alignment

15 Issue: simulations close to the reality Objectives: Find the best strategy and configuration of alignment systems for the pre-alignment Model the impact of the pre-alignment errors on the beam emittance growth First results: The pre-alignment tolerance could be achieved with wires longer than 425m. Beam simulations, based on these data showed that 400m wires were able to limit the long distance emittances. Next steps  implementation of a new model, closer to the reality The requirements were defined in collaboration with Daniel These steps are now mathematically defined The algorithms will have to be implemented and tested on the TT1 configuration (validation of the model on 150m) Development of a software allowing the modeling on the whole CLIC. 4 st key point: beam studies compatibility

16 CONCLUSION A strategy is being followed actively concerning the CLIC pre-alignment studies. One last question dealing with the BDS and experimental area: It will be possible to pre-align all the components along each linac within a few microns, but then what are the position requirements concerning one BDS with respect to the other? Based on the experience of the LHC, it will be very difficult to determine their relative position at better than 0.1 mm (1 sigma). CLIC Module WG 20/07/2009 H. MAINAUD DURAND BE-ABP/SU

17 Astro-Geodetic Zenith Camera System of the ETH Zürich : DIADEM Each starry night, we perform astro-geodetic measurements thanks to a zenith camera system. If you are interested in participating, do not hesitate to contact us.