29/1/2002A.Ghiselli, INFN-CNAF1 DataTAG / WP4 meeting Cern, 29 January 2002 Agenda  start at 10.30  Project introduction, Olivier Martin  WP4 introduction,

Slides:



Advertisements
Similar presentations
LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
Advertisements

International Grid Communities Dr. Carl Kesselman Information Sciences Institute University of Southern California.
24-May-01D.P.Kelsey, GridPP WG E: Security1 GridPP Work Group E Security Development David Kelsey CLRC/RAL, UK
Fabric and Storage Management GridPP Fabric and Storage Management GridPP 24/24 May 2001.
5-Dec-02D.P.Kelsey, GridPP Security1 GridPP Security UK Security Workshop 5-6 Dec 2002, NeSC David Kelsey CLRC/RAL, UK
ATLAS/LHCb GANGA DEVELOPMENT Introduction Requirements Architecture and design Interfacing to the Grid Ganga prototyping A. Soroko (Oxford), K. Harrison.
INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001.
A conceptual model of grid resources and services Authors: Sergio Andreozzi Massimo Sgaravatto Cristina Vistoli Presenter: Sergio Andreozzi INFN-CNAF Bologna.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
GridPP meeting Feb 03 R. Hughes-Jones Manchester WP7 Networking Richard Hughes-Jones.
The LHC Computing Grid Project Tomi Kauppi Timo Larjo.
The EU DataGrid - Introduction The European DataGrid Project Team
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Overview of the GLUE Project (Grid Laboratory Unified Environment) Author: Piotr Nowakowski, M.Sc. Cyfronet, Kraków.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
The EDG Testbed Deployment Details The European DataGrid Project
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
DataGrid is a project funded by the European Union VisualJob Demonstation EDG 1.4.x 2003 The EU DataGrid How the use of distributed resources can help.
05/23/2002Flavia Donno, INFN-Pisa1 DataTAG experiment grid integration plan Flavia Donno, INFN-Pisa DataTAG/iVDGL joint meeting, May 2002.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
27-28 August 2002Flavia Donno, INFN-Pisa1 Report on GLUE activities Flavia Donno, INFN-Pisa EDG Retreat August 2002.
A monitoring tool for a GRID operation center Sergio Andreozzi (INFN CNAF), Sergio Fantinel (INFN Padova), David Rebatto (INFN Milano), Gennaro Tortone.
DataTAG Research and Technological Development for a Transatlantic Grid Abstract Several major international Grid development projects are underway at.
GriPhyN EAC Meeting (Jan. 7, 2002)Carl Kesselman1 University of Southern California GriPhyN External Advisory Committee Meeting Gainesville,
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
CLRC and the European DataGrid Middleware Information and Monitoring Services The current information service is built on the hierarchical database OpenLDAP.
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
J.J.Blaising April 02AMS DataGrid-status1 DataGrid Status J.J Blaising IN2P3 Grid Status Demo introduction Demo.
INFSO-RI Enabling Grids for E-sciencE OSG-LCG Interoperability Activity Author: Laurence Field (CERN)
DATAGRID Testbed Work Package (report) F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March 2001 Amsterdam.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
Ruth Pordes November 2004TeraGrid GIG Site Review1 TeraGrid and Open Science Grid Ruth Pordes, Fermilab representing the Open Science.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
GriPhyN EAC Meeting (Jan. 7, 2002)Paul Avery1 Integration with iVDGL è International Virtual-Data Grid Laboratory  A global Grid laboratory (US, EU, Asia,
Tiziana FerrariThe DataTAG Projct, Roma Nov DataTAG Project.
DataTAG Research and Technological Development for a Transatlantic Grid Abstract The main idea behind the DataTAG project was to strengthen the collaboration.
FP6−2004−Infrastructures−6-SSA EUChinaGrid status report Giuseppe Andronico INFN Sez. Di Catania CERN – March 3° 2006.
DataTAG Work Package 4 Meeting Bologna Simone Ludwig Brunel University 23rd and 24th of May 2002.
1 Grid monitoring System (GridICE) Grid monitoring System (GridICE) DataTAG Collaboration: S.Andreozzi, S.Fantinel, A.Ghiselli, G.Tortone, C.Vistoli A.Ghiselli,
Partner Logo A Tier1 Centre at RAL and more John Gordon eScience Centre CLRC-RAL HEPiX/HEPNT - Catania 19th April 2002.
1 DataTAG-WP4 and GLUE ( mainly from A.Ghiselli II INFN-Grid workshop) Mirco Mazzucato Gridstart meeting at HPC Cetraro.
6 march Building the INFN Grid Proposal outline a.ghiselli,l.luminari,m.sgaravatto,c.vistoli INFN Grid meeting, milano.
Summary from WP 1 Parallel Section Massimo Sgaravatto INFN Padova.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 The EU DataGrid Project Three years.
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
The EU DataTAG Project Richard Hughes-Jones Based on Olivier H. Martin GGF3 Frascati, Italy Oct 2001.
DataTAG is a project funded by the European Union International School on Grid Computing, 23 Jul 2003 – n o 1 GridICE The eyes of the grid PART I. Introduction.
Bob Jones – Project Architecture - 1 March n° 1 Project Architecture, Middleware and Delivery Schedule Bob Jones Technical Coordinator, WP12, CERN.
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
10-Feb-00 CERN HepCCC Grid Initiative ATLAS meeting – 16 February 2000 Les Robertson CERN/IT.
Bob Jones EGEE Technical Director
Status of Task Forces Ian Bird GDB 8 May 2003.
BaBar-Grid Status and Prospects
The EDG Testbed Deployment Details
Grid related projects CERN openlab LCG EDG F.Fluckiger
Sergio Fantinel, INFN LNL/PD
Fabric and Storage Management
CMS report from FNAL demo week Marco Verlato (INFN-Padova)
A conceptual model of grid resources and services
LCG experience in Integrating Grid Toolkits
5th EU DataGrid Conference
Report on GLUE activities 5th EU-DataGRID Conference
Internet2 Spring Member meeting
I Datagrid Workshop- Marseille C.Vistoli
Presented at the 4th DataGrid Conference
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

29/1/2002A.Ghiselli, INFN-CNAF1 DataTAG / WP4 meeting Cern, 29 January 2002 Agenda  start at  Project introduction, Olivier Martin  WP4 introduction, Antonia Ghiselli  Security/authorization:interoperability issues, Roberto Cecchini  Relationship with Applications, testbed and EU-US intergrid initiative (task 4.4), Mirco Mazzucato  Discussion on: WP4 organization: man-power, EU-US testbed sites, DataGrid middleware and applications contacts. proposal of DataTAG/WP4 to US InterGrid Parners.  End at 13.30

29/1/2002A.Ghiselli, INFN-CNAF2 DataTAG – WP4 A.Ghiselli CERN, 29 january 2002

29/1/2002A.Ghiselli, INFN-CNAF3 WP4 objective WP4 objective  Interoperability between EU and US Grids services from DataGrid, GriPhyN, PPDG and in collaboration with iVDGL over an EU/US Testbed.

29/1/2002A.Ghiselli, INFN-CNAF4 iVDGL  International Virtual-Data Grid Laboratory A place to conduct Data Grid tests at scale Concrete manifestation of world-wide grid activity Continuing activity that will drive Grid awareness  Scale of effort For national, international scale Data Grid tests, operations Computation & data intensive computing  Who Initially US-UK-Italy-EU; Japan, Australia & Russia, China, Pakistan, India, South America? StarLight and other international networks vital U.S. Co-PIs: Avery, Foster, Gardner, Newman, Szalay

29/1/2002A.Ghiselli, INFN-CNAF5 iVDGL Map Circa Tier0/1 facility Tier2 facility 10 Gbps link 2.5 Gbps link 622 Mbps link Other link Tier3 facility U.S. Co-PIs: Avery, Foster, Gardner, Newman, Szalay

29/1/2002A.Ghiselli, INFN-CNAF6 DataGrid and Grid Architecture Grid Fabric Layer Applications Layer Comm. protocols Data servers Remote monitoring PC-Cluster Schedulers Network Services (QoS) Optical technology Resource e connectivityLayer (Resource and appl. Independent services) InformationResource mgmt (GRAM) Security (GSI)Data accessFault detection... From Batch traditional Applications Up to Grid enabled Applications Collective Layer (Application oriented) Data Mover Monitoring tools workload management Application monitoring Data management Globus TK WP1 WP2 WP3 WP4 WP5 WP8

29/1/2002A.Ghiselli, INFN-CNAF7 DataGrid Release1 Services SE (GDMP) CE / WN (PC Cluster) Replica ReplicaCatalogue LCFG server VO VO userLdap server userLdap server User Interface Resource Broker II LB CA Ldap Tree mkgridmap Grid resources Grid resourcesAUP MDS MDS CVS

29/1/2002A.Ghiselli, INFN-CNAF8 Present Grid Testbed 1 from the VO perspective RC RC VO/Alice VO/Alice U I RBII RBII TO TO RAL RAL CNAF CNAF cnaf cnaf PD PD CT CT CERN CERN Lyon Lyon Nikhef Nikhef RB with different resource scope (2 grid domains) Some VOs share all CEs, SEs of the 2 domains Other VOs access to only one RB (1 grid domain) roma roma cern cern VO/Atlas VO/Atlas RC RC U I VO/CMS VO/CMS VO/INFN VO/INFN U I CA CA … VO/EO VO/EO RC RC

29/1/2002A.Ghiselli, INFN-CNAF9 VO real framework for the LHC experiments RC RC VO/Alice VO/Alice U I RBII LB RBII LB T2 T2 T1 T1 T2 T2 CE, SE partially shared by all the VOs CE, SE not shared RBs per VO with VO resource scope UIs per VO VO-Authorization service Resource discovery T2 T2 VO/Atlas VO/Atlas RC RC U I VO/cms VO/cms RBII LB T1 T1 T2 T2 VO/EO VO/EO VO Auth.Service VO Auth.Service CERN/T0,T1 CERN/T0,T1 T1 T1

29/1/2002A.Ghiselli, INFN-CNAF10 WP4 Tasks Assuming the same grid basic services (gram,gsi,gris) between the differen grid projects, the main issues are:  4.1 resource discovery (INFN/2FTE, PPARC/0.5FTE)  4.2 security/authorization (INFN/4 FTE(2new), UvA/ 1FTE)  4.3 interworking of collective services (INFN/5 FTE (3new), PPARC/0.5FTE) on EU-US testbed.  4.4 test applications (INFN/4-5 FTE(2new), PPARC unfunded, ESA/Esrin unfunded

29/1/2002A.Ghiselli, INFN-CNAF11 WP4 steps  LHC Applications extend existing use-cases (EDG WP8) to test interoperability of the grid components.  Setup Griphyn and PPDG lab environment in EU and DataGrid lab environment in US to test and analyze their services as different grid domains.  Define few testbed sites and man-power.  Identify concrete grid components that will be the targets of interoperability development efforts.  The previous steps provide input to an architectural schema collecting all the services, their relationships, interfaces and protocols following the Globus layered model.  Produce an assessment of interoperability solutions.  EU-US Integrated grid deployment

29/1/2002A.Ghiselli, INFN-CNAF12 iVDGL - DataTAG - DataGrid Map Tier0/1 facility Tier2 facility 10 Gbps link 2.5 Gbps link 622 Mbps link Other link Tier3 facility DataTAG link

29/1/2002A.Ghiselli, INFN-CNAF13 The objectives of this meeting  To establish working relationship with Datagrid, Middleware WPs, WP6 and ATF Applications willing to run on the EU-US testbed(sites definition).  Definition of the initial EU work program to discuss with US counterpart (ex. I step: configure EU sites with Griphyn and ppdg software and US sites with DataGrid).  Define US counterpart for DataTAG  To agree on the technical coordination with the EU-US intergrid initiative.

29/1/2002A.Ghiselli, INFN-CNAF14 DataTAG WP4 meeting outcomes DataTAG WP4 meeting outcomes  Agrement on the WP4 workprogram steps (slide11)  relationship with Datagrid, WPs, and ATF Applications WP8  US counterpart for DataTAG: iVDGL Implement direct contacts between WP4 and iVDGL  To agree on the technical coordination with the EU-US intergrid initiative.