Airport Systems Planning & Design / RdN Design of Components of Airport Passenger Buildings Dr. Richard de Neufville Professor of Engineering Systems and.

Slides:



Advertisements
Similar presentations
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Advertisements

Three Key Process Measures: Flow Rate
PEDESTRIANS Osama Tabash Khaled El-Yazory Dr. Essam Almasri
OPSM 301: Operations Management Session 12: Service processes and flow variability Koç University Graduate School of Business MBA Program Zeynep Aksin.
Module C8 Queuing Economic/Cost Models. ECONOMIC ANALYSES Each problem is different Examples –To determine the minimum number of servers to meet some.
Process Design and Analysis
Capacity, Level of Service, Intersection Design (1)
Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 1 of 18 Asphalt.
Airport Systems Planning & Design / RdN Configuration of Airport Passenger Buildings Dr. Richard de Neufville Professor of Engineering Systems and Civil.
Capacity Setting and Queuing Theory
S. D. Deshmukh OM V. Capacity Planning in Services u Matching Supply and Demand u The Service Process u Performance Measures u Causes of Waiting u Economics.
11–1. 11–2 Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
The main causes of the air traffic congestion are:
Airport Systems Planning & Design / RdN Defining Capacity of Airport Passenger Buildings Dr. Richard de Neufville Professor of Engineering Systems and.
S. Chopra/Operations/Managing Services1 Operations Management: Capacity Management in Services Module u Why do queues build up? u Process attributes and.
IES 303 Chapter 4: Process Analysis Week 4 Dec 1, 2005 Objectives:
Airport Systems Planning & Design / RdN  Forecasting Dr. Richard de Neufville Professor of Engineering Systems and Civil and Environmental Engineering.
Vehicle Flow.
1 Hashing (Walls & Mirrors - end of Chapter 12). 2 I hate quotations. Tell me what you know. – Ralph Waldo Emerson.
1 Design of Evacuation System for High-Rise Building Danqing Yu.
Model Antrian By : Render, ect. Outline  Characteristics of a Waiting-Line System.  Arrival characteristics.  Waiting-Line characteristics.  Service.
1 Ardavan Asef-Vaziri Sep-09Operations Management: Waiting Lines2  Made-to-stock (MTS) operations  Product is manufactured and stocked in advance of.
Waiting Line Models And Service Improvement
Queuing and Transportation
Chapter 3. Highway Design for Performance
Airport Systems Planning & Design / RdN AIRPORT PASSENGER BUILDINGS: EFFICIENCY THRU SHARED USE  Dr. Richard de Neufville  Professor of Engineering Systems.
Denver Airport Baggage Handling System (DABHS)
Airport Systems Planning RdN Multi-Airport Systems in Era of Low-Cost Carriers  Dr. Richard de Neufville Professor of Systems Engineering and of Civil.
Signalized Intersections
Lecture 14 – Queuing Systems
Product layout Assembly-line balancing approach. 2 Facility layout Process terminology Cycle time: Average time between completions of successive units.
Engineering Systems Analysis for Design Richard de Neufville  Massachusetts Institute of Technology Use of Simulation Slide 1 of 19 Use of Simulation.
ENGAGE THE ELITE.  Indira Gandhi International Airport is the primary International Airport of the National Capital Region of Delhi, India  IGIA is.
Interference ,Trunking and GOS
1 Chapter 16 Applications of Queuing Theory Prepared by: Ashraf Soliman Abuhamad Supervisor by : Dr. Sana’a Wafa Al-Sayegh University of Palestine Faculty.
AIRPORT 2009 Airport Forum BUCHAREST, October 28-th, 2009 Development & Modernization / Phase III.
Management of Waiting Lines McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Terminal Design Passenger Processing. errata  Consider TSA impacts.
Airport Systems Planning & Design / RdN Cultural Differences Dr. Richard de Neufville Professor of Systems Engineering and Civil and Environmental Engineering.
Abstract Raw ITS data is commonly aggregated to 20-30sec intervals for collection and communication, and further aggregated to 1-60min intervals for archiving.
Evaluation of Level of Service at Airport Passenger Terminals: Individual Components and Overall Perspectives Anderson Correia Department of Civil Engineering.
Airport Systems Planning & Design / RdN  Airport Strategic Planning Dr. Richard de Neufville Professor of Engineering Systems and Civil and Environmental.
ENGAGE THE ELITE.  Indira Gandhi International Airport is the primary International Airport of the National Capital Region of Delhi, India  IGIA is.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 4: Process Analysis Objectives: Introduce some practical.
18 Management of Waiting Lines.
Spreadsheet Models for Managers: Session 12 12/1 Copyright © Richard Brenner Spreadsheet Models for Managers Session 12 Service Systems Single-Server.
Traffic Flow Fundamentals
Airport Systems Planning RdN Multi-Airport Systems in Era of Low-Cost Carriers  Dr. Richard de Neufville Professor of Engineering Systems and of Civil.
Vehicle Flow. Homework Ch 3 # 1,4, 7, 15 Vehicle Flow How do vehicles operate in the system –capacity –speed –headway –density.
Airport Systems Planning & Design / RdN Airport and Airline Access Dr. Richard de Neufville Professor of Systems Engineering and Civil and Environmental.
Chapter 10 Verification and Validation of Simulation Models
MINGZHE HAN (CMP TUTOR) COMM 204 Review Session. Outline T ABLE OF C ONTENT (Basic Information) (Process Analysis) (Multiple Types and the Product Process.
Route and Network Planning
Engineering Systems Analysis for Design Richard de Neufville  Massachusetts Institute of Technology Use of Simulation Slide 1 of 17 Use of Simulation.
Components of AP Pax Bldgs Slide 1 of 27 / RdN © Design of Components of Airport Passenger Buildings Richard de Neufville Professor of Engineering Systems.
1 Ideas Board “Inspiration From Those Who Have Inspired”
Chapter 9 Capacity and Level of Service for Highway Segments
Management of Waiting Lines Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Dr. Richard de Neufville
Chapter 10 Verification and Validation of Simulation Models
Defining Capacity of Airport Passenger Buildings
Chapter 5 Process Analysis.
Transportation Engineering Basic Queuing Theory February 18, 2011
Dr. Richard de Neufville
Dr. Richard de Neufville
Design of Components of Airport Passenger Buildings
Terminal Design Passenger Processing
School of Civil Engineering
Chapter 5 Process Analysis.
Presentation transcript:

Airport Systems Planning & Design / RdN Design of Components of Airport Passenger Buildings Dr. Richard de Neufville Professor of Engineering Systems and Civil and Environmental Engineering Massachusetts Institute of Technology

Airport Systems Planning & Design / RdN Design of Components of Airport Passenger Building Objective: To show how standards for sizing can be integrated into design Topics  1. Procedure  2. Practical Example :Paris/de Gaulle, Air France Passenger Building

Airport Systems Planning & Design / RdN Procedure 1. Estimate Critical Loads ; Identify “hot spots” 2. Calculate Requirements  Storage Areas Lines Hold Spaces  Flows Corridors Passageways 3. Integrate into Design

Airport Systems Planning & Design / RdN Critical Loads (1) The essential problem is: CONCENTRATION OF TRAFFIC in time and space People do not spread out evenly People normally cluster in attractive places:  around check-in desks, gate areas  at mouth of baggage claim  at nearest of many facilities

Airport Systems Planning & Design / RdN Critical Loads (2) Concentration phenomenon  Creates bottlenecks  These define capacity Concentration phenomenon means:  Capacity of a large facility cannot be found simply by applying standards to whole area Failure to grasp this fact often causes significant design failures

Airport Systems Planning & Design / RdN Example Hotspot

Airport Systems Planning & Design / RdN Estimation of Loads  Three important ideas: 1. Cumulative Arrival Diagram 2. Empirical Measurements necessary for each situation, site 3. Modulation by secondary activities

Airport Systems Planning & Design / RdN Calculation of Requirements  Recall from discussion of capacity: Storage Facilities  queues, hold rooms,... Require tradeoff: Cost vs. LOS Flow Facilities  corridors, stairs, … Capacity much greater than most designers imagine

Airport Systems Planning & Design / RdN  Two Phases: Exploration of Tradeoffs  Using cumulative arrival diagram Sizing of Space Calculating Storage Facilities I

Airport Systems Planning & Design / RdN Use of Cumulative Arrival Diagram  1. Estimate, plot arrivals of Customers based on local measurements  2. Superimpose departures of Customers generated by service rate of check-in, aerobridge, gate,...  3. Establish Maximum Customers Waiting as difference between arrivals and departures  4. Explore Effect of Alternatives Calculating Storage Facilities II

Airport Systems Planning & Design / RdN Dwell Time Comparisons

Airport Systems Planning & Design / RdN Two kinds of calculations: 1. Area = (Customers) (sq. m. per person) using appropriate space standards 2. Queue Length = (Customers) (0.6 m. per person) Note: Queues generally project awkwardly  Often block passage for other customers Calculating Storage Facilities III

Airport Systems Planning & Design / RdN Typical Cumulative Load Diagram (Paris 1980)

Airport Systems Planning & Design / RdN Typical Design Tradeoff for “Storage” Facilities Passengers Served Queue Length Passengers Arrived Speed of Service 1 Completed

Airport Systems Planning & Design / RdN Typical Basis for Modulating Cumulative Load Diagram

Airport Systems Planning & Design / RdN Typical Final Cumulative Load Diagram Shift

Airport Systems Planning & Design / RdN Calculating Flow Facilities I Note Carefully:  1. Implication of Flow crucial  2. Flow = > more apparent space  3. Big difference between Storage and Flow capacity Example of Difference  Storage Capacity Space 3m wide, 30 m long ==> 90 sq.m area Assume LOS = C ==> 1.9 sq. m per person Storage capacity = 90 / 1.9 = 47 persons  Flow Capacity Walking at 66m / minute Apparent area = 3m (66 m/min) = 198 sq m / min Flow Capacity = 198/1.9 = 94 persons / min = 5460 /hour!!!

Airport Systems Planning & Design / RdN Calculating Flow Facilities II Procedure  1. Choose LOS, Level of Service = > PMM, Persons per Meter width per Minute  2. Calculate Effective Width Needed = Flow per minute / PMM  3. Calculate Minimum Design Width = Effective Width + 1.5m. Extra is for edge effects due to walls, counter flows,...

Airport Systems Planning & Design / RdN Example: Paris / de Gaulle Air France Building Typical features before revision:  1 hour flight turnaround at gate  300 passengers per flight  6 check-in counters per flight  8 m. between counters and wall  1.5 minute check-in time per passenger  0.6 m. per passenger in line

Airport Systems Planning & Design / RdN Example Difficulties Counters insufficient Passengers per minute = 300 / 50 = 6 Counters required = 6 (1.5 min) = 9 > 6 Queue Space insufficient Assume half, 150 passengers wait Average queue = 150 / 6 = 25 ==> 25 (0.6 m.) = 15 > 8 m.

Airport Systems Planning & Design / RdN Example: Paris / de Gaulle Air France Building Intercontinental (2A) after revision:  hr flight turnaround at gate  300 passengers per flight  6 check-in counters per flight  12 m. between counters and wall  2 minute check-in time per passenger  0.6 m. per passenger in line 4 Flights/gate per day

Airport Systems Planning & Design / RdN Example: Paris / de Gaulle Air France Building European (2B) after revision:  hour flight turnaround at gate  100 passengers per flight  3 check-in counters per flight  12 m. between counters and wall  1.5 minute check-in time per passenger  0.6 m. per passenger in line 8 Flights/gate per day

Airport Systems Planning & Design / RdN Revision of Air France Passenger Building Two main steps:  1. To create queue space ==> eliminate obstructions (telephones,...) ; add counters  2. To guarantee service ==> Reduce Gate Use, using up to 2 hour turnaround Capacity drops: to ~ 6 flights/day 50% more space needed to service load Very Expensive problem!!!