TPC/HBD R&D C.Woody, N.Smirnov, B.Azmoun, M.Sivertz, B.Yu, R.Majka, J. Mitchell, V.Rykov, M.Purschke, C.-Y.Chi PHENIX Collaboration Meeting Nashville,

Slides:



Advertisements
Similar presentations
1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
Advertisements

Electronics for large LAr TPC’s F. Pietropaolo (ICARUS Collaboration) CRYODET Workshop LNGS, March 2006.
TK Hemmick for the EIC Tracking R&D Group Letter of Intent for Detector R&D Towards an EIC Detector.
Amsterdam, April 2,2003P. Colas - Micromegas TPC1 Micromegas TPC: New Results and Prospects New tests in magnetic fieldNew tests in magnetic field FeedbackFeedback.
E-field calculations for the TPC/HBD N. Smirnov Upgrade Working Group Meeting 05/13/03, BNL.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” LC-TPC-LBL 18-Oct Tracking Detector R&D at Cornell University and.
D. Peterson, “The Cornell/Purdue TPC”, LCWS05, Stanford, 21-March The Cornell/Purdue TPC Information available at the web site:
D. Peterson, Cornell University, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG Arlington 09-Jan-2003 Tracking Detector R&D.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
J. Inman, “Studies with a TPC … measure ion feedback”, REU presentation, 08-Aug of 20 Studies with a TPC and development of a procedure to measure.
D. Peterson, “ILC Detector Work”, Cornell Group Meeting, 4-October ILC Detector Work This project is supported by the US National Science Foundation.
D. Peterson, “The Cornell/Purdue TPC”, ALCPG, Snowmass, 23-August The Cornell/Purdue TPC Information available at the web site:
UTA, Jan. 9-11, 2003M. Ronan LC-TPC R&D1 LC-TPC R&D GEM, MicroMEGAS and MWPC techniquesGEM, MicroMEGAS and MWPC techniques Preliminary studiesPreliminary.
D. Peterson, Cornell Univ., “Round table” 23-Jan-2003 Cornell Linear Collider Detector Research Cornell Interests: The Cornell group proposes to contribute.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Gain measurements of Triple Gas Electron Multiplier (GEM) detector with zigzag readout strips V. BHOPATKAR, E. ESPOSITO, E. HANSEN, J. TWIGGER M. HOHLMANN.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
C.Woody, PHENIX Upgrades, 11/10/00 A TPC for PHENIX ?? No, surely you must mean for STAR…. PHENIX, really …. ??? You must be NUTS !!! Well, wait a minute...
SPHENIX GEM Tracker R&D at BNL Craig Woody BNL sPHENIX Design Study Meeting September 7, 2011.
Craig Woody BNL RHIC Detector Advisory Committee Review December 19, 2002 A Fast, Compact TPC for Dalitz Rejection and Inner Tracking in PHENIX.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Update on TPC R&D C. Woody BNL DC Upgrades Meeting October 9, 2003.
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Experimental and Numerical studies on Bulk Micromegas SINP group in RD51 Applied Nuclear Physics Division Saha Institute of Nuclear Physics Kolkata, West.
June 22, 2009 P. Colas - Analysis meeting 1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (Carleton and Saclay) Analysis of Micromegas Large Prototype data.
12/12/09 MPGD 神戸大学 1 Yusuke Komatsu A B. Azmoun B, C. Woody B, K. Ozawa A University of Tokyo A,Brook Haven National Lab. B.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Taku Gunji Center for Nuclear Study The University of Tokyo
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
HBD CDR Gas System and Monitoring Craig Woody BNL DC Upgrades/EC Meeting March 9, 2005.
10/26/06Takao Sakaguchi, BNL1 Hadron Blind Detector for the PHENIX experiment at RHIC Takao Sakaguchi Brookhaven National Laboratory For the PHENIX Collaboration.
Status of TPC/HBD for PHENIX Craig Woody BNL DC Upgrades Meeting February 12, 2002.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
TPC/HBD R&D at BNL Craig Woody BNL Mini Workshop on PHENIX Upgrade Plans August 6, 2002.
Preparations for Detector R&D Committee Meeting Dec Craig Woody BNL TPC/HBD Upgrade Working Group Nov 26, 2002.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
Future Possibilities for Measuring Low Mass Lepton Pairs in Christine Aidala for the Collaboration Quark Matter 2002, Nantes.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors Craig Woody Brookhaven National Lab B.Azmoun 1, A Caccavano 1, Z.Citron 2,
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Nov 1, 2007 IEEE NSS & MIC 2007 by C. Y. Chi 1 A Faster Digitizer System for the Hadron Blind Detector in the PHENIX Experiment Cheng-Yi Chi Nevis Lab.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 HBD R&D: Update Itzhak Tserruya (for A. Kozlov, I. Ravinovich and L. Shekhtman) Weizmann Institute, Rehovot DC meeting Feb. 14, 2003.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors C. Woody B.Azmuon 1, A Caccavano 1, Z.Citron 2, M.Durham 2, T.Hemmick 2, J.Kamin.
Tracking Issues in the Central Region Craig Woody BNL DC Upgrade Meeting August 11, 2002.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Recent test results of TGEM-Prototypes in INR, Moscow V.I.Razin, А.B.Kurepin, B.M.Ovchinnikov, A.I.Reshetin, E.A.Usenko, S.N.Filippov, D.A.Finogeev Institute.
P HOTON Y IELD DUE TO S CINTILLATION IN CF4 Bob Azmoun, Craig Woody ( BNL ) Nikolai Smirnov ( Yale University )
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
A Fast, Compact TPC for PHENIX and STAR with Enhanced Electron ID Capabilities Craig Woody BNL RHIC Detector Workshop Gas Detector Working Group November.
6/29/2016I. Ravinovich1 HBD status in Run-10 I. Ravinovich WIS.
Status of R&D on a TPC/HBD for PHENIX Craig Woody BNL DC Upgrades Meeting December 12, 2001.
Trigger & Tracking detector for CMS
Low Mass Lepton Pairs in PHENIX Craig Woody BNL Upgrades Plenary Meeting June 14, 2002.
FEE for TPC MPD__NICA JINR
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
EIC Tracking Meeting, March 26, 2012
Development of GEM at CNS
Presentation transcript:

TPC/HBD R&D C.Woody, N.Smirnov, B.Azmoun, M.Sivertz, B.Yu, R.Majka, J. Mitchell, V.Rykov, M.Purschke, C.-Y.Chi PHENIX Collaboration Meeting Nashville, TN June 11, 2003

C.Woody, Nashville Collaboration Meeting, 6/11/032 List of Topics  GEM measurements with Ar/CO 2 and CF 4  Status of new GEM foils  Gas transmission measurements  TPC field cage design  Tracking Issues with TPC and VTX  Electronics for the HBD and TPC  R&D plan for next year

C.Woody, Nashville Collaboration Meeting, 6/11/033 GEM configuration Initial tests with GEMs using CF 4 did not produce usable signals Problem was with electric field in transfer gaps Smaller gap spacing and higher fields (> 2 kV/cm) give much higher gains

C.Woody, Nashville Collaboration Meeting, 6/11/034 GEM Measurements with Ar/CO 2 BNL WIS Resistive divider Fix V TG Vary V F Fix V F Vary V TG We seem to get higher gain at the same voltage than WIS At fixed V TG the gain curve is nicely exponential as expected up to ~ 10 5 where discharging starts to occur Varying V TG at fixed V F has a much weaker effect on gain, but shows no plateau up to the maximum V

C.Woody, Nashville Collaboration Meeting, 6/11/035 GEM Measurements with CF 4 Resistive divider Fix V TG Vary V F Fix V F Vary V TG We again seem to get higher gain at the same voltage than WIS Both BNL and WIS see saturation in CF 4 at gain ~ 10 5 (before breakdown point) V TG again has a much weaker effect on gain and shows no plateau BNL WIS

C.Woody, Nashville Collaboration Meeting, 6/11/036 New GEM Foils from 3M Expecting delivery of 50 new 10x10 cm foils at BNL in ~ 2 weeks Roll-to-roll process Limited to 12” width 3M Microinterconnect Systems Division, Austin, TX In collaboration with Univ. Chicago (J.Collar) hep-ex / (April 2003)

C.Woody, Nashville Collaboration Meeting, 6/11/037 Testing Small 3M Foils 3 stage GEM with three 1” dia. 3M foils 80 m m (55 m m) holes spaced in a hexagonal pattern with 140 m m pitch Visually looks to be excellent quality Will compare with CERN foils in Ar/CO 2 & CF 4

C.Woody, Nashville Collaboration Meeting, 6/11/038 VUV Transparency of Potential Radiator Gases VUV transparency is extremely sensitive to O 2 and H 2 O content Tranmittance of Argon and CF 4 Gas system being developed and tested in collaboration with LEGS B.Azmoun

C.Woody, Nashville Collaboration Meeting, 6/11/039 Low O 2 and H 2 O levels are critical for good VUV transparency Ref.: Zaidel’ & Shreider, VUV Spectroscopy Water Vapor. Oxygen.

C.Woody, Nashville Collaboration Meeting, 6/11/0310 Absolute Quantum Efficiency of CsI photocathodes CsI PMT Comparison of our CsI photocathodes with a calibrated CsI PMT Good quality CsI photocathodes are now being made at Stony Brook Stack with Au coated GEM foil for depositing CsI photocathode VUV Spectrometer

C.Woody, Nashville Collaboration Meeting, 6/11/0311 TPC Field Cage Design Question: How uniform can we make the drift field and how large are the electric field distortions near the edges and in the vicinity of the HBD ? Autocad geometry  MAXWELL Not so easy…. Also try 2D calculation using GARFIELD N.Smirnov

C.Woody, Nashville Collaboration Meeting, 6/11/0312 Drift Field Distortions N.Smirnov GARFIELD MAXWELL E Z / E R / R Drift field distortions are generally < 1%

C.Woody, Nashville Collaboration Meeting, 6/11/0313 Electric Field Distortions Near the HBD 30 cm mini TPC field cage wires 3 mm 5 cm -36 kV 0 V + 75 V wire plane with 5 mm step N.Smirnov Initial indications are that the electric field distortions in the region of the HBD are small, but we need to do more calculations E D, V/cm E R, V/cm

C.Woody, Nashville Collaboration Meeting, 6/11/0314 Tracking Issues Need to begin serious simulation work on pattern recognition, track finding and track fitting using tracking information from all PHENIX detectors (present and future - VTX and TPC) V. Rykov ++ Configuration B = 9 KG Momentum resolution for various combinations of the VTX and TPC TPC would be used for tracking not only in the electron pair measurement in conjunction with the HBD, but also as an additional tracking detector in normal field running. Helps in rejecting false high P T tracks and provides good stand alone tracking for tracks presently outside the PHENIX acceptance (useful for jet measurements)

C.Woody, Nashville Collaboration Meeting, 6/11/0315 Is this PHENIX or STAR ? J.Mitchell’s event display of the PHENIX TPC for a central Au-Au event (PISA simulation) Investigating TPC pattern recognition software from LBL (LC) and STAR (Level 3)

C.Woody, Nashville Collaboration Meeting, 6/11/0316 Readout Electronics Currently reading out GEM TPC with 100 MHz FADC (SIS channel, 12 bit VME module) pDAQ courtesy of M.Purschke FADC readout (10 ns bins)Digital scope trace 55 Fe source with 10x10 cm 2 triple GEM

C.Woody, Nashville Collaboration Meeting, 6/11/0317 Future HBD/TPC readout electronics development Try and utilize existing or soon to be available components HBD needs only modest (~ few ns) time resolution Perhaps can use FADC to provide time information 32 ch preamp/shaper for APD readout 0.18 m m CMOS, 125 mW per chip Final ASIC 4.3 x 1.6 mm 2 65 MHz FADC available soon

18 TPC and HBD electronics R&D: 1) can use the same type of electronics for both HBD and TPC ??? (by fitting ADC samples to get T0) 2) TPC FEE issue: Heat load and high channels count => custom ASIC or commercial ADC+ FPGA In the next few months we will construct a possible commercial ADC + FPGA for the TPC readout solution base on Analog Device 4 channel 8 bit ADC (chips scale BGA serial ADC) This is to understand power + readout + packing density issues This will also serve as preliminary study for the HBD readout… TPC FEE: Samples signal every 25ns for 140 samples. need L1 delay buffer (160 samples) + 5 events buffers (700 samples) HBD FEE: Need to measure charge and time (~ several ns) L1 delay buffer + 5 events buffers. C.-Y.Chi, Nevis

19 For TPC FEE : 60K to carry out TPC FEE study + 20 K (M&S) 1) study commercial IC solution 2) study the issues regard to custom ASIC a) follow ALICE path – buy ADC core + custom Logics b) fully custom ASIC ( need to use commercial library) 3) building prototype modules ( commercial solution) or custom ASIC prototype For HBD FEE: 40 K on salary + 20K (M&S) - Part of works on done from TPC FEE R&D 1) prototype readout For DCM: 80K on salary + 20K (M&S) R&D on DCM work out readout method for prototype detectors readout Assumptions: we need to 1) readout HBD prototype end of next year 2) readout various prototype detector 1.5 years from now R&D Requests From Nevis C.-Y.Chi, Nevis

C.Woody, Nashville Collaboration Meeting, 6/11/0320 TPC Prototype - Starting Next Year Full size module Tests field cage design Tests materials to be used in actual construction Allows testing with cosmic rays Provides structure on which to design and study readout plane Provides excellent test bench for readout electronics

C.Woody, Nashville Collaboration Meeting, 6/11/0321 R&D Plan FY2003 Complete TPC drift cell and begin comprehensive gas studies Test new 3M GEM foils Continue to improve TPC field cage calculation Begin TPC prototype design Measure CsI quantum efficiencies w/GEMs + radiator gases Measure CF 4 Cherenkov efficiency + scintillation (NSLS) Begin design of HBD & TPC readout electronics Funds: $25K labor + $30K equipment FY2004 Build and test TPC & HBD prototypes Hopefully complete design of HBD readout electronics and continue design of TPC electronics. Start engineering design of TPC/HBD detector system Funds: $200K HBD + $200K TPC

C.Woody, Nashville Collaboration Meeting, 6/11/0322 Extra Slides

C.Woody, Nashville Collaboration Meeting, 6/11/0323 HBD Budget

C.Woody, Nashville Collaboration Meeting, 6/11/0324 R&D Proposal Budget Request PHENIX Institutional Involvement HBD BNL, WIS, Stony Brook TPC BNL (Physics, Instrumentation), Tokyo, FIT Electronics BNL Instrumentation, Columbia (Nevis) Related R&D Efforts STAR (joint effort) LEGS TPC TPC w/GEM readout for NLC/TESLA

C.Woody, Nashville Collaboration Meeting, 6/11/0325 Upgrade Budget and Timeline

C.Woody, Nashville Collaboration Meeting, 6/11/0326 Possible Support Structure for HBD/TPC/VTX H.Van Hecke