1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.

Slides:



Advertisements
Similar presentations
Muons going through MICE should –Have ISIS proton timing structure –Generate TOF signals –Satisfy ISIS and TOF trigger requirements MICE tracker DAQ will.
Advertisements

MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
January 11, Data Format for MICE Trackers Tracker Data Readout Basics Preliminary Tracker Data Format and Suitability for VME Data Transfers. Questions.
Jet algorithm/FPGA and tests by Attila Hidvégi. Content Status of the jet algorithm Status of the jet-FPGA Different kind of tests FIO-scanning Summary.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
MICE-SciFi team, 14 October 2003 SciFi: progress report Progress: All stations shipped to FNAL … … assembly in progress Measurements: Effect of radiated.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 12/5/2003 Multi-channel Data Acquisition System Mid-Term Presentation.
Detector Systems Update MICO May 19, MICE Detector Systems  Beam Monitors u Over heating of sender boards has been s Solution.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
MICE Readout DFPGA Firmware Progress Done Trip-t  DFPGA  AFPGA Discriminator bit map transfer control blocks done and simulated Trip-t  DFPGA  AFPGA.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
1Malcolm Ellis - Tracker Meeting - 6th November 2006 Tracker Software  Offline u Modeling u GRID u Tests u Decoding u Kalman fit u Reconstruction & “data.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
The 6713 DSP Starter Kit (DSK) is a low-cost platform which lets customers evaluate and develop applications for the Texas Instruments C67X DSP family.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 3 Report Jack Hickish.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
PROJECT - ZYNQ Yakir Peretz Idan Homri Semester - winter 2014 Duration - one semester.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
Samuel Silverstein Stockholm University CMM++ firmware development Backplane formats (update) CMM++ firmware.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
Software Standard CMS FEC software for the control part We have been advised to look for a shortcut in order to give triggers to the VFAT via the FEC –We.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Kevin Nash MaPSA-Light test system 1. The System 2.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
January 17, MICE Tracker Firmware Dead Time and Muon Detection Studies for the MICE Tracker Tracker Data Readout Basics Progress in Increasing Fraction.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
CMM++ activities at MSU Y. Ermoline et al. Level-1 Calorimeter Trigger Joint Meeting, CERN, 13 – 17 September 2010.
1 DATE-based DAQ Hideyuki Sakamoto CM22, RAL 19/10/08.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference, August 20, 2007.
Status Report of the PC-Based PXD-DAQ Option Takeo Higuchi (KEK) 1Sep.25,2010PXD-DAQ Workshop.
Online – Data Storage and Processing
Initial check-out of Pulsar prototypes
Tracker TriP-t Test Stand
MICE VLPC Cryo Update Alan Bross MICE CM18 June 13, 2007.
PyBAR Firmware Structure and Operation Experience
Preparation for Station Acceptance Test
AFE IIt/VLSB Update Firmware Progress Hardware Progress AFE IIt VLSB
Muon Recording Studies and Progress for the MICE Tracker
Sector Processor Status Report
Plans for the 2004 CSC Beam Test
Presentation transcript:

1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007

2 AFE IIt Firmware Latest versions of AFPGA and DFPGA firmware loaded and compiled on AFE IIt Using ChipScope signal analyzer to look at output signals –Signals not seen, but not so alarming at early stage –Kwame is following up on some leads. I will follow up on the current work as Bill will be taking new IIT position. Bill will set up IIT test stand and devote available time to AFPGA testing. Senerath has released two updated DFPGA firmware versions. Terry Hart, MICE Tracker Phone Conference, September 5, 2007

3 VLSB Firmware Data format just about settled –Documented in MICE Note draft and to be included in updated AFE IIt MICE Note Modifications made and work in simulations –Block transfer of data –Memory bank address advance only when data –Fast clear of data after end of spill –Write start and end addresses of data into registers for DAQ. Firmware test with input data sent to board being set up at test stand. –ISE synthesis still being worked out –Once this is done, firmware to be uploaded onto VLSB FPGA for testing. Terry Hart, MICE Tracker Phone Conference, September 5, 2007

4 VLSB Boards Parts are at FNAL. First few boards may be done in ~ 2 weeks. Quotes for outside vendors stuffing boards being checked in case FNAL labor not available. FNAL will test basic functionality of data registers. Terry Hart, MICE Tracker Phone Conference, September 5, 2007

5 AFE IIt Boards 8 boards for 2 cryostats fully tested and characterized. 4 boards assigned to 3 rd cryostat, not yet tested and characterized 11 spare boards available, 4 of which will be assigned to 4 th cryostat. 2 more boards possibly available 23 (or 25) AFE IIt boards available for MICE Malcolm is preparing document with board testing/characterization procedures for Bill, Kwame, and me since Michael and Ben will be starting the new school year at IIT this week. Russ Rucinski indicated that cryostat to be ready in ~ 2 weeks. Terry Hart, MICE Tracker Phone Conference, September 5, 2007

6 AFE IIt/VLSB Test Full integrated test planning has started. Likely to use cryostat/LED pulser/AFE IIt/VLSB test stand at D0 Assembly Building For scheduling estimate, need to find out –Estimated firmware completion times –Necessary hardware ISIS clock and trigger emulation Pulse generator Terry Hart, MICE Tracker Phone Conference, September 5, 2007

7 Summary AFE IIt firmware now in testing stage on test board. VLSB firmware modifications tests being set up. VLSB board construction underway AFE IIt board testing/characterization ongoing Planning for full AFE IIt/VLSB integration tests underway AFE IIt and VLSB data format documentation being updated. Terry Hart, MICE Tracker Phone Conference, September 5, 2007