S PIEGEL & M C D IARMID New England’s Forward Capacity Market: How Did We Get Here and Where Are We Going? Scott H. Strauss APPA Legal Seminar Cambridge,

Slides:



Advertisements
Similar presentations
Secondary Market with Transmission Capacities ČEPS, a.s. 11/2006.
Advertisements

Proposal For Improvement to the Current ICAP Market Markets Committee October 12, 2004 Ken Bekman Con Edison Energy.
M A R K E T S D E V E L O P M E N T SWCT LICAP Zone Recommendation FERC Compliance Filing – July 2, 2004 NEPOOL Markets Committee June 23, 2004 Mark Karl.
1 WHY WE NEED AN ICAP MARKET IN NEW ENGLAND Presentation By: Dr. Richard A. Rosen Tellus Institute Boston, MA To: Massachusetts Electric Restructuring.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Update on Demand Resource Participation in New Englands Forward Capacity Market Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
© 2013 Day Pitney LLP Overview and Update on the Ever-Evolving New England Wholesale Capacity Market presentation to Boston Bar Association May 23, 2013.
Summary of Proposed Market Rules For Transition Period Price-Responsive Demand and Active Demand Resources in the Forward Capacity Market Henry Yoshimura,
Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
Better Align Capacity Markets with Policy/Planning Objectives James Daly, VP Energy Supply Restructuring Roundtable Sept 21, 2012.
DECEMBER 17, 2013 | WESTBOROUGH, MA Reliability Committee & Transmission Committee & Markets Committee Capacity Zone Modeling Al McBride MANAGER, AREA.
Procurement and Resource Adequacy Briefing August 2, 2006 Molly Sterkel, California Public Utilities Commission.
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
NOVEMBER 18, 2013 | WESTBOROUGH, MA Administrative Pricing Rules for Forward Capacity Auction #8.
OCTOBER 8, 2014 Bob Laurita INTERNAL MARKET MONITORING New Import Capacity Resource FCM Market Power Mitigation Order to Show Cause Compliance Filing.
Enhancing Capacity Markets to Improve Resource Performance and Investment Pay For Performance: New England’s Capacity Market OPSI 10 TH ANNUAL MEETING.
S PIEGEL & M C D IARMID LLP Wrap up Report on the APPA Wholesale Power Project Robert C. McDiarmid APPA Legal Seminar Seattle, October 15, 2007.
Resource Adequacy in PJM
Status Report: Resource Adequacy (RA) and Long Term Procurement Planning (LTPP) CPUC Energy Division Molly Tirpak Sterkel cpuc.ca.gov; Tel:
1 Resource Adequacy and Market Power Mitigation via Option Contracts Hung-po Chao and Robert Wilson EPRI and Stanford University Presentation at POWER.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
The Convergence of Market Designs for Adequate Generating Capacity Peter Cramton and Steven Stoft 24 March 2006.
1 Colombia Firm Energy Auction Peter Cramton (joint with Steven Stoft) 18 December 2006.
A Capacity Market that Makes Sense Peter Cramton & Steven Stoft 18 March 2005.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Reliability Pricing Model (RPM) Overview Andrew Ott PJM Senior Vice President, Markets.
Economic Demand Response Sheldon Fulton Executive Director, IPCAA November 4, 2008.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
1 Non-Transmission Alternatives to Reduce Local Congestion Costs Bill Bojorquez June 3, 2004.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Retail Competition: Managing a Difficult Transition David L. O’Connor Commissioner Massachusetts Division of Energy Resources (DOER) Presentation to National.
Overview of the Capacity Markets in the United States 2008 APEX Conference in Sydney, Australia October 13-14, 2008 Hung-po Chao Director, Market Strategy.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
1 Colombia Capacity Auction Peter Cramton (with many ideas from Steven Stoft) 9 June 2006.
Colombia’s Forward Energy Market Peter Cramton University of Maryland 5 November 2007.
ERCOT PROGRESS REPORT Board of Directors Austin, Texas October 15, 2002.
Making the Wholesale Market Work for Retail Customers: Connecticut Municipal System Experiences November 11, 2007 Anaheim, California Presented by: Brian.
S PIEGEL & M C D IARMID APPA EEI Contract Project Update APPA Legal Seminar Cambridge, Massachusetts October 10, 2006 Robert C. McDiarmid.
March 6, 2012 ERCOT Public ERCOT CRR Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
What Was Learned From the 2015 Transition and Base Residual Auction Results? October 13, 2015 OPSI Annual Meeting CP Auction results – A DR perspective.
Transmission Rights. The Markets EnergyForwardTransmissionRightsAncillaryServices Must Run Contracts Energy OperatingReserveCapacityReserve Procurement.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
Renewable Energy Act of 2008
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. Southwest Connecticut RFP Markets Committee November 14, 2003.
Todos los derechos reservados para XM S.A E.S.P. October, 2006 Luis Alejandro Camargo S. Wholesale Market Manager XM S.A. E.S.P. THE NEW COLOMBIA FIRM.
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
PJM©2014www.pjm.com State of Demand Response Stu Bresler Vice President- Market Operations PJM Interconnection 10 th OPSI Annual Meeting October 13, 2014.
Overview: California Renewables Portfolio Standard (RPS) Program Presented by Paul Douglas RPS Program Manager California Public Utilities.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Resource Adequacy and Market Power Mitigation via Option Contracts
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
The Future of Demand Response in New England
Locational Installed Capacity Restructuring Roundtable
Benefits of New England’s Proposed Capacity Market
Long-term Capacity Market
FERC Order in Devon Power LLC, et al. ER
Changes to New England’s Forward Capacity Market 120th New England Electricity Restructuring Roundtable Paul Roberti* Commissioner, RIPUC Boston,
Locational ICAP in New England
Market Design in New England
Summer Peak Energy Pricing in New England: The ISO-NE Response
Alternative ICAP Proposal
What Does the Recent LICAP Settlement Mean for New England?
The First FCA: Observations & Thoughts
LICAP Settlement: Demand Resources
Presentation transcript:

S PIEGEL & M C D IARMID New England’s Forward Capacity Market: How Did We Get Here and Where Are We Going? Scott H. Strauss APPA Legal Seminar Cambridge, MA October 2006

S PIEGEL & M C D IARMID Objectives Describe New England’s Multi ‑ Year Effort to Develop a Resource Adequacy Mechanism Review the Key Components of the Resource Adequacy Mechanism Developed Through a FERC- Supervised Settlement Process

S PIEGEL & M C D IARMID How Did We Get Here?

S PIEGEL & M C D IARMID Significant Events On the Road to Resource Adequacy Reliability Must Run or “RMR” Agreement Proliferation and Controversy The “PUSH” Experiment Locational Installed Capacity “Demand Curve” Filing by ISO New England

S PIEGEL & M C D IARMID ISO’s Proposed Demand Curve Capacity P Max PKPK C Min C Max CKCK C Target Locational ICAP Demand Curve C Min = OC C K = 1.038OC C Target = 1.054OC C Max = 1.150OC P K = EBCC P Max = 2EBCC Price d3d knee kink toe

S PIEGEL & M C D IARMID Additional Significant Events on the Road to Resource Adequacy Extensive and Contentious Litigation Over Demand Curve Parameters June 2005: Initial Decision Approving Demand Curve A Congressional Detour FERC Changes Direction All-Day Oral Argument

S PIEGEL & M C D IARMID Even More Additional Significant Events on the Road to Resource Adequacy Last Chance: Supervised Settlement Talks Our Winter of Settlement Discontent: 115 Parties Spend Five Months in Search of a New Market Design March 2006: Settlement Achieved >Strong Supporters >Strong Opponents >Strong Non ‑ Opponents June 2006: FERC Approves Settlement Agreement

S PIEGEL & M C D IARMID Where Are We Going?

S PIEGEL & M C D IARMID Forward Capacity Market (“FCM”) Components Procurement of Needed Capacity Resources in Advance Purchase Only the Amount of Capacity That is Needed Location-Specific Auctions / Capacity Transfer Rights (“CTRs”) Qualified New Resources Compete with Existing Resources

S PIEGEL & M C D IARMID Forward Capacity Auction Mechanics Annual ISO-Administered Auctions “Descending Clock” Format:  Auction Begins with Pre ‑ Determined Starting Price (2 x “CONE”)  Price Lowered Through Each Round  Last Round Sets Capacity Clearing Price  Existing Capacity a Price-Taker

S PIEGEL & M C D IARMID More FCM Components Capacity Payments Linked to Availability De-List / Retirement Bids Peak Energy Rent Deductions

S PIEGEL & M C D IARMID Even More FCM Components Market Power / Market Failure Protections Reconfiguration Auctions Self-Supply Option Transition Period Payments

S PIEGEL & M C D IARMID Self-Supply Option Load Serving Entities may designate owned or contracted resources Self-supplied resources are matched up with corresponding load obligation Both load and supply are cleared through the auction process Self-supplied capacity resources have the same rights and obligations as any FCM capacity resource

S PIEGEL & M C D IARMID Transition Period Necessary Because First Commitment Period Does Not Start Until 2010 Transition Period Provides a Negotiated Level of Capacity Payments

S PIEGEL & M C D IARMID Transition Period Payments All Listed Capacity Resources Receive Fixed Payments Based on Their Seasonal Ratings:  December 1, 2006 to May 31, 2007 $3.05/kW-mo.  June 1, 2007 to May 31, 2008 $3.05/kW-mo.  June 1, 2008 to May 31, 2009 $3.75/kW-mo.  June 1, 2009 to May 31, 2010 $4.10/kW-mo. Transition Payments Are Less Than What Would Have Been Paid Under Proposed LICAP Demand Curve

S PIEGEL & M C D IARMID Status of RMR Agreements  Agreements do not terminate automatically once transition period payments begin  Parties free to challenge individual RMR agreements following implementation of transition payments

S PIEGEL & M C D IARMID Next Steps Market Rule Drafting Commencement of Auctions Continued Litigation