OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006.

Slides:



Advertisements
Similar presentations
A proposal for a polarized 3 He ++ ion source with the EBIS ionizer for RHIC. A.Zelenski, J,Alessi, E.Beebe, A.Pikin BNL M.Farkhondeh, W.Franklin, A. Kocoloski,
Advertisements

Polarized 3He ++ ion source development for RHIC. Check the Bjorken Spin Sum Rule (the difference between the 1st moments of the proton and neutron spin.
5 MeV Mott Measurement for CEBAF Operations group Joe Grames, Marcy Stutzman February 14 th, 2007 Sir Nevill F. Mott at the ceremony with his Nobel Prize.
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
K.T. McDonald DoE Review July 29, E-166 Experiment E-166 is a demonstration of undulator-based polarized positron production for linear colliders.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
TOF Mass Spectrometer &
MCTF C. Johnstone All Exp. Meeting 14 Mar First Beam to Muon Test Area Description and commissioning of beam to MTA Experimental Hall C. Johnstone,
Feasibility Check / How to test EquipmentsStatusCostDateCommentsContact Polarized 3 He atomsCell for transfer design / LKB, Paris/MainzSspm.e. optical.
September 12, 2013 PSTP 2013 G. Atoian a *, V. Klenov b, J. Ritter a, D. Steski a, A. Zelenski a, V. Zubets b a Brookhaven National Laboratory, Upton,
Polarized beams in RHIC A.Zelenski, BNL PSTP 2011, September 12, St.Petersburg.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
The Relativistic Heavy Ion Collider high-intensity polarized H - ion source The Relativistic Heavy Ion Collider high-intensity polarized H - ion source.
Thomas Roser 2 nd Electron-Ion Collider Workshop March 15-17, 2004 Ion Polarization in RHIC/eRHIC M. Bai, W. MacKay, V. Ptitsyn, T. Roser, A. Zelenski.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
» Absolute Polarimetry of Proton Beams at RHIC« Oleg Eyser for the RHIC Polarimetry Group International Workshop on Polarized Sources, Targets and Polarimetry.
Indiana University Cyclotron Facility March, 2004 EIC WorkshopV.P.Derenchuk 1 Polarized Ion Sources V.Derenchuk, Ya.Derbenev, V.Dudnikov Second Electron-Ion.
High-Intensity Polarized H - Beam production in Charge-exchange Collisions A.Zelenski, BNL PSTP 2011, September 14, St.Petersburg.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
The Stripping Foil Test Stand in the Linac4 Transfer Line
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Polarized source upgrade. Source upgrade project Main component delivery: Atomic Beam Source- August 2011 Superconducting solenoid- March-2012.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
A. Zelenski a, G. Atoian a *, A. Bogdanov b, D.Raparia a, M.Runtso b, D. Steski a, V. Zajic a a Brookhaven National Laboratory, Upton, NY, 11973, USA b.
The RHIC C-CNI polarimeter upgrade for 2009 Run. RSC Meeting, December 16, 2008 Anatoli Zelenski for polarimeter upgrade group. T.Russo, T.Curcio, D.Lehn,
SONA Transition Optimization in the Brookhaven OPPIS A. Kponou, A. Zelenski, S. Kokhanovski, V. Zubets & T. Lehn B. N. L.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.
RHIC polarized source upgrade. A.Zelenski, BNL. Workshop on high–energy spin physics, IHEP, Protvino, September 1983 Workshop on high–energy spin physics,
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
The RHIC Optically-Pumped Polarized Ion Source. The OPPIS polarization technique. Sona-transition studies. OPPIS performance in Runs. Pulsed OPPIS.
P-Carbon CNI polarimeter upgrades. Vacuum system. Target drives. Targets. Polarimetry Workshop, July 31, 2009 A.Zelenski for polarimetry group.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- THERMAL STEPS ANALYSIS Goals & Means : –apply a “step function” on the cooling water –look at : APD response.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
1 1/15 Status of the Nuclotron-NICA G.Trubnikov MAC, June 7, 2011.
11/12/20151 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
MLL Workshop on Future Science 2019 and beyond, 16.Dec.2015 The accelerator, as seen by.. 1 From LBNL Image Library Collection by Dave Judd and Ronn MacKenzie.
Preinjectors Status D. Raparia March 22, 2016 Time Meeting.
JLEIC ion source: specifications, design, and R&D prospects
Test of Optical Stochastic Cooling in CESR
SPARC RF gun status by P. Musumeci Review committee
Acceleration of Polarized Protons and Deuterons at HESR/FAIR
WG2 Summary: Diagnostics, measurements, and commissioning
5 MeV Mott Measurement for CEBAF Operations group
eRHIC with Self-Polarizing Electron Ring
The design of interaction region
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
Linac Diagnostics Commissioning Experience
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Polarized He3 Target Upgrade (Stage I) for A1n/d2n
Presentation transcript:

OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006

A new semiconductor probe laser for Faraday rotation polarimeter. 40 kW Ar-ion laser “Toptica” laser 150 mW at 780 nm 300 W power supply.

Polarized H - ion current pulse out of 200 MeV linac. Faradey rotation polarization sinal. 500 uA cuurent At 200 MeV. 85-hole ECR Source for the maximum polarization. 400 uS 12· polarized H - /pulse.

Rb-vapor thickness measurement by Faraday rotation technique.

SONA-TRANSITION. Sona- transition ECR-zone Polarization transfer from electrons to protons. Correction coil

Magnetic field gradient in the Sona-region. Longitudinal Bz field in the Sona region at different correction coil current settings.

Correction coil scan. Ionizer coil current – 220 A

A new (short 230 mm) optically-pumped Rb-vapor cell assembly. A new vacuum chamber. A new cooling system. A new water cooled deflecting plates.

Proton polarization vs Rb vapor thickness. Long Rb cell A new short Rb cell

200 MeV polarization measurements (raw). 121 hole ECR Probe laser Failure. 55 hole ECR Jan16 Febr.6

A new APD detectors at 200 MeV polarimeter.

Signals from Avalanche Photo Diodes from LED and Ru-106 beta-source.

Upgrade status. A new semiconductor laser for the Faraday rotation polarimeter was installed, aligned and tuned. This reduced total souce power consumption from 65 kW to 15 kW. The cause of laser diode failures was identified and fixed. A new Rb-cell assembly was built and tested. It should improve the polarization (slightly). The old Rb-cell will be a spare. There are still considerable polarization losses at the Sona-transition. The ECR source upgrades improved the reproducibility and reliable long term operation at high bem intensity. A new APD-based proton detectors for 200 MeV polarimeter were built and tested.

Conclusions. BNL OPPIS reliably delivered polarized H - ion beam (P= 80-82%) in the 2005 run for the RHIC spin program. A beam intensity exceeds RHIC limit, which allowed strong beam collimation in the Booster, to reduce longitudinal and transverse beam emittances. In the 2006 run we will try to revitalize the p-D polarimeter for the absolute polarization value measurements After upgrade the OPPIS provides sufficient intensity and higher polarization for the Spin 2006 run in RHIC.