Madrid, May 21 st 2008 6 th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.

Slides:



Advertisements
Similar presentations
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Advertisements

Open seasons in European Markets: Overview and initial lessons learned Dominique Jamme ERGEGs Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
1 In France, new capacity is developed and allocated via open season procedures The GGPOS establish how an open season should be conducted To compete with.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
15 th September 2013 Enagás and TIGF Information to NRAs.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
1 Open Season Development of new capacities between France and Luxembourg NW-GRI, September - 21 st, 2010.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
9th SG Meeting South Gas Regional Initiative 15th July 2009, Madrid.
French Working Group Evolution of the contractual structure of the gas transportation network South Gas Regional Initiative 8th IG Meeting – 16th February.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Madrid 15 th July 2009 OS for the development of new gas interconnection capacity between Spain and France after th SG meeting.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
Pilot Project on Market Coupling PEG Nord / PEG Sud 3rd Workshop on Gas Target Model London 11 APRIL 2011.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
France – Spain open season Results Lessons learned.
French transport structure SG meeting Madrid – 15 July 2009.
Gas Regional Initiative – North West Region IG meeting The Hague – 25th March, 2009 Open Seasons Coordination Marie-Claire AOUN – CRE
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
2006 December 11th ERGEG South GRI – 2 nd IG Assessment of the capacity at the GRTgaz / TIGF interface South Gas Regional Initiative – 2 nd Implementation.
1 Open season th IG Meeting 26 th March 2010 Paris.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
8th SG Meeting South Gas Regional Initiative 27th April 2009, Paris.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Madrid, 1st April th SG Meeting South Gas Regional Initiative.
OS 2015: Information Memorandum Draft proposal 12 th SG meeting Madrid 7 th May 2010.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
26th IG meeting 23th January 2014
Results of the First Phase of the OS 11th IG meeting
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
26th February 2015 Teleconference
26th February 2015 Teleconference
Work plan of GRI NW for 2011 Three out of four projects are started
Presentation transcript:

Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons

2 Objective An European will: One European Gas market. Development interconnections between France and Spain in order to bring significant market places closer to each other. Favour transits North to South and South to North, connecting different gas sources by pipelines and by ships.

3 Open Seasons: Why? Open Seasons: assessment and contracting of market needs, leading to investment decisions Required in France for decision. Not required in Spain for decision, but jointly conducted by Enagás and Naturgás for coordination. Developments based on binding requests by market participants. Process allowing: Capacity development at existing entry/exit points (Larrau/Biriatou). Creation of new entry / exit point (Midcat).

4 Development of interconnections implies reinforcement of internal transmissions networks in each of the market zones concerned. Difficult exercise: find the best combination with numerous interconnection development projects. Market Structure 4 markets zones. Full entry-exit zones.

5 Projects Different developments are envisaged between Spain and France: Western corridor: increasing existing interconnections (2013). Eastern corridor: building a new interconnection (2015). Additionally, a need of new capacity in the GRTgazNorth GRTgazSouth link. Coordination should be pursued between Open Season Procedures and marketing of existing capacities.

6 Projects: Technical Capacity (I) Note: Incremental capacities in Biriatou, and the infrastructures associated to those incremental capacities, are currently under review. (*) Infrastructures increasing capacity between GRTgaz NORTH and GRTgaz SOUTH are not detailed.

7 Projects: Technical Capacity (II) Note: Incremental capacities in Biriatou, and the infrastructures associated to those incremental capacities, are currently under review. (*) Infrastructures increasing capacity between GRTgaz NORTH and GRTgaz SOUTH are not detailed.

8 Capacities to be marketed Note: Incremental capacities in Biriatou, and the infrastructures associated to those incremental capacities, are currently under review.

9 Notes (1)Currently, from 1st April 2013, the total technical capacity (230GWh/d) is not booked but dedicated to be marketed by short (1 year) to medium (2, 3 or 4 years) term OSP procedures, fixed by CRE. According to these rules, capacities will be marketed 6 months before the beginning of the period in question. The figures here suppose that CRE would adapt this rule in order to allow marketing of a part of existing capacity in coordination with OS. (2)Currently, from 1st April 2013, 142GWh/d is not booked but dedicated to be marketed by short (1year) to medium (2, 3, or 4 years) term OSP procedures, fixed by CRE. According to these rules, capacities will be marketed 6 months before the beginning of the period in question. The figure here supposes that CRE maintains these rules because of congestion North >South. (3)Depending on level of short term capacity decided by CRE, capacity proposed to the market would vary between 210 and 380GWh/d. (4)Capacity at the GRTgazNorth-GRTgazSouth link might be impacted by other entry points to the GRTgazSouth zone, in particular Fos. A detailed description of the different development options should be presented in the Info Memo. No capacity at the GRTgazNorth-GRTgazSouth link should be dedicated to any entry or exit point. Every procedure, OS or OSP, will be open for every shipper and every need.

10 1 process, 1 or 2 phases Information Memorandum in October 2008 will describe the whole process (all proposed capacities). 1 st phase following a provisional 12 month planning. Binding applications for Western corridor & also applications for Eastern corridor (to be defined whether applications will be binding or non-binding). If necessary, 2 nd phase following a provisional 10 to 12 month planning: applicable if applications for Eastern corridor in the 1st phase are non-binding. Binding applications for Eastern corridor.

11 Development Planning Western Corridor (2013). Capacity from/to Spain to/from GRTgaz South. Capacity between GRTgazSouth and GRTgazNorth to be defined by CRE (part of existing capacity). Eastern Corridor & GRTgaz North- South (2015). Development of new interconnection capacity between GRTgazNorth and GRTgazSouth X X

12 Investment Decisions in France Once the capacity has been allocated and the contracts have been signed, global investments (related or not to the OS) will be approved by the French TSO’s boards and the CRE, around December.

13 Provisional timetable of the OS process D Publication of the Information Memorandum: D (2008, October 1 st ). D Publication of the Confidentiality Agreement: D. D Publication of a project of priority and allocation rules: D. D Publication of a project of clauses of the transmission contract relative to the developed capacities: D. Presentation and information meeting with shippers about this consultation. D + 2 months Publication of priority and allocation rules (one document): D + 2 months. D + 2 months Publication of clauses of the transmission contract relative to the developed capacities (four documents): D + 2 months.

14 Provisional timetable from D to D+4 months Individual discussion following signature of a confidentiality agreement with shippers: from D to D+4 months. D+4 months Deadline to receipt : D+4 months. binding applications for the Western corridor binding or non-binding applications for the Eastern corridor binding or non-binding application for GRTgaz North-South link D+5 months TSO’s response on capacity allocations: D+5 months. from D+5 months to D+6 months Deadline for signature of contracts: from D+5 months to D+6 months. D+6 to D+9 2 nd phase (if applicable): to be launched once information from the market has been processed and contracts have been signed: from D+6 to D+9 D+12 months French TSO’s boards approve their global investments programs: D+12 months.

15 Allocation Procedures TSOs are committed to develop transparent allocation procedures. Capacity will be allocated fostering the creation of energy corridors. Consumers’ interest will be protected in each market area.

16 Information Memorandum The main contents of the Information Memorandum will be: Objectives of the OS. Existing and new capacities to be offered under the OS. Marketing of capacities / OS phases. Calendar of the OS. Coordination with other OSs/OSPs in France and Spain. Allocation procedures. Infrastructures associated to incremental capacities. Binding / non-binding application sheet.

Thank you for your attention