Consult 21 Interconnect Working Group 7 Nov 2005 Ian Self Virtual Interconnect Capacity Product Outline The information in this presentation relates to.

Slides:



Advertisements
Similar presentations
Introduction The pressure on all types of operators to implement cost- based pricing, especially for interconnect services, is growing I will deal with.
Advertisements

Element Based Charging (EBC) used within both BT Basic and BT Transit Telephony Element Based Charging uses switch related elements for charging. This.
C3 – CONFIDENTIALInterconnect Scope & Strategy BT Carrier Price List - Proposed ‘Quick Win’ Improvements presented by Helen Edwards, Vodafone Limited.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect & Portfolio Working Group NGN Interconnect - PSTN Emulation Blended Rate.
©Ofcom Voice – the need to take a long term view on sector evolution Chris Rowsell 18 October 2007.
Towards Virtual Routers as a Service 6th GI/ITG KuVS Workshop on “Future Internet” November 22, 2010 Hannover Zdravko Bozakov.
Thank you.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Click to edit Master title style TDM Access & TDM Backhaul PPC Forum June 12 th 2008 Ian Boothman Spyros Christou.
Standard Contract Forum 20 July Customer Suite, BT Centre, London.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
I&P: Contracts Clinic 24/02/06 1 Minutes Table Derivation & Application of Overflow The focus of the presentation is on principles: How it works how we.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Computerised Business Systems, Inc. Charlie G. Hinders President Softwar e Solutions FOR THE TELECOMMUNICATIONS INDUSTRY.
NGN Multi-Service Interconnect Link (NGN-MSIL) Robin Charles.
RMDCN Workshop, Jan 99 ECMWF/WZ-1 RMDCN Contract & Accession Agreements Walter Zwieflhofer Head of Computer Division ECMWF.
Operation of vDLE concept Revised C&W proposal. Background C&W continue to believe that in the “virtualised” situation CPs should pay connection & rental.
Issue 3.2 (1 st June 2012)Author: Zack Thompson1 NCC Carrier Price List (CPL) Guidance Slides CONVEYANCE TELEPHONY These slides are provided as a ‘rough.
STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 11 – 24 September 2007 Information.
Anthony Stephens 21CN Customer Engagement 1 21CN High Level Consultation Plan The following plan provides a four month view of key consultation themes.
Consult21 IMWG Pre-Migration Scheduling Consultation Summary & Approach The purpose of this presentation is to share the summary and.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
One Marketplace Access Exchange.
Narrowband & IP Strategy Steve Wickenden & Dave Hughes 12 November 1999.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1 ART approves France Telecom's 2002 interconnection catalogue 30 November 2001.
21CN Legacy Interconnection Working Group 17 th December 2004 Auditorium City Place, Gatwick.
CER Update Industry Governance Group 21 st September 2011.
Othman Othman M.M., Koji Okamura Kyushu University 1.
IMPLEMENTATION & MIGRATION WORKING GROUP PROVISIONING EXPERTS MEETING Wednesday 1st March 2006.
Interconnect Policy & Contract
1 1Page Interconnection and Facilities Leasing Discussion 1. Introduction and Objectives 2. Chapter 10 Market Review Process - Overview 3. Relevant markets,
1 EBC Workshop Introduction and Welcome.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
Call Detail Records for UNI 1.0 Dan Spears Director – Applications Marketing CIENA Corporation.
STAR Integrated Environment An integrated tool for pricing, routing, billing, traffic analysis and other customer / internal related issues Urs Loosli,
State of Illinois General Notice for Pending Request for Proposal Statewide Telecom Network Voice & Data Services Contract(s) RFP Request ID #
COSTING PRINCIPLES FOR UNMETERED INTERCONNECTION PETER CULHAM CHIEF ECONOMIST OFTEL.
Networking Devices.
Implementation & Migration Working Group 18 th January 2006 Kevin Young Interconnect & Numbering Services The information in this presentation relates.
1 FRIACO OFTEL INTERNET FORUM - 11 December 2000 Geoff Brighton JanWillem van den Bos.
Partial Private Circuits Kalpesh Brahmbhatt 31 October 02.
Structure of Charges Year-end review for DCMF 22 November 2007.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
MSIL TECHNICAL CONSULTATION 28 February 2006 Steve Wright The information in this presentation relates to plans currently under development and subject.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
1 DLE to NGS Migration: Contracts Clinic 24 th February 2006 The information in this presentation relates to plans currently under development and subject.
Suppliers without a Contract Purchase Order for Services.
Ensieea Rizwani An energy-efficient management mechanism for large-scale server clusters By: Zhenghua Xue, Dong, Ma, Fan, Mei 1.
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
1 EBC Conference Introduction and Welcome.
12 September Billing Meeting Summary. Objectives Review of EBC concepts Establish how EBC will be calculated for the following BT terminating BT Originating.
For discussion purposes. No implementation assurances Interconnect Links and Congruent Call pricing Robin Charles, Clive Feather and Ian Self The information.
INTERCONNECT WORKING GROUP 28 JANUARY 2005 BT’s Thinking about Next Generation Interconnect in 21CN DARYL DUNBAR HEAD OF 21CN CUSTOMER SOLUTIONS The information.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
A complete small office communication solution.. 2Phone 2Phone has been designed to meet the communication needs of small offices in a managed and cost.
Mainline Service and Pricing Settlement Presentation to the TTF April 6, 2001.
Digital Asset Management & Storage Program Program Summary
Comprehensive Route Network Analysis
Number portability Dr. ZOUAKIA Rochdi ANRT
Energy Storage Settlements Consistent with PUCT Project & NPRR461
ESB Networks AIP Programme
KCOM HEY Wholesale FibreLine Services
Mod 0621 Amendments to Gas Transmission Charging Regime
Mod 0621 Amendments to Gas Transmission Charging Regime
Requirements Definition
PRESENTATION OF MONTENEGRO
NCC Carrier Price List (CPL) Guidance Slides
Presentation transcript:

Consult 21 Interconnect Working Group 7 Nov 2005 Ian Self Virtual Interconnect Capacity Product Outline The information in this presentation relates to plans currently under development and subject to consultation, and may be subject to change. Detailed implementation depends upon a number of factors including the capabilities of suppliers and the final 21CN network design.

Brief Recap Provide continuity of LES rate through the DLE migration to 21CN Maintain the competitive status quo Pricing replicates physical products As simple as possible

Consultation open to all Thank you to the CPs who contributed questions and proposals:

Decision Making process 1.Start with principle of current world replication 2.If unanimity on a change to current world this has been adopted 3.If no unanimity then the consensus view has been adopted providing it is consistent with point 1. e.g:  Excess circuits v.s. excess ST p.p.m.  Virtual ports v.s. port charge savings from consolidation of tandem minutes

Going Forward Strong demand from several CPs for early launch of VIEC product to meet expansion plans Product Description drafted – moving to solution design Further consultation on numbers in monthly minutes table Solution Design Consultation on monthly minutes table Product Structure Consultation Concluded

Product Outline The information in this presentation relates to plans currently under development and subject to consultation, and may be subject to change. Detailed implementation depends upon a number of factors including the capabilities of suppliers and the final 21CN network design.

Routing Options (CP selects one option across the board) Both options refer to:  Individual NGS  Specified set of traffic types Little demand for third option 1. Segregated LES Route NGS CP Switch Tandem Calls DLE A DLE B DLE A DLE B LES rate applies to specific Route ID NGS 2. Consolidated NGS Route CP Switch CP Switch LES rate ignores Route ID oror

Circuit Provision (Both Options) CP pre-selects the capacity to each virtual destination Connection and rental charges the same as physical equivalents ISI Mux at NGS Sites, CSI Mux at customer site If Mux/NGS/DLE co-located then IBC charge only Either physical or virtual port for each E1 of virtual capacity No Mix of Friaco and other traffic MUXMUX NGSNGS Tandem* DLE 1 DLE 2 DLE 3 DLE 4 5 E1 Virtual Capacity Virtual Capacity Distance 3 Physical IBCs 2 Virtual IBCs * For consolidated NGS option only

Call Billing Calls to/from Virtual DLE destinations at LES rate Selectable by traffic type Specific Route ID if CP has segregated DLE partition Call Bill format unchanged (excess bill separate) Standard EBC unchanged – applies to tandem routes Custom EBC file applies to consolidated and segregated DLE routes

Circuit Ordering Lead times Capacity provided in whole calendar months to align with call billing. Lead times driven by EBC and physical provisioning processes. To be determined during solution design and likely to change from current. Order New Reconfigure Cease EBC cut off Physical port / circuit lead times Circuit billing cut off Routing plan lead times

Capacity Management Monthly calculations – all respondents requested Pence per Minute Excess – only 1 CP wanted excess cct charge  Excess based on ST except DT for long distance IECs and tandem capacity overflow Peak Erlangs per destination based on TC4 capacity - no objections Separate Day/Evening/Weekend minutes  Protects CPs with high off peak traffic  Avoids average Day/Evening/Weekend rate for overflow Further analysis / consultation required on ratio of peak to average traffic  this drives the number of monthly minutes per peak hour erlang

Minutes per month Table Further consultation required on table values Figures below illustrate structure and are not a proposal or an offer

End