S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:

Slides:



Advertisements
Similar presentations
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
Advertisements

Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
FNAL Emittance Devices Flying Wires (FW) Sync Lite Ion Profile Monitors (IPM) aah,6/20/2000.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
The Tevatron Collider: A Thirty Year Campaign Fermilab Colloquium March 10, 2010 John Peoples 1.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
11 Overview of the Tevatron Collider V.S. Morozov Old Dominion University Muons, Inc. Collider Review Retreat, Jefferson Lab, February 24, 2010.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
Eric Prebys, FNAL. USPAS, Knoxville, TN, January 20-31, 2014 Lecture 20 - Cooling 2 Anti-protons are created by hitting a target with an energetic proton.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
Run II Operational Status and Plans Run II Meeting October 28, 2004 Dave McGinnis.
Jean Slaughter –April 5, 2004 – all experimenters’ meeting Purposes of SDA Store to store monitoring of performance Long term trends Analysis of specific.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Fermilab Run 2 Accelerator Status and Upgrades
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
RECYCLER REQUIREMENTS FOR THE RECYCLER RING & ASSOCIATED TRANSFER LINES BPMs Brajesh Choudhary for the MI Dept.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Overview of Ramp Development Giulio Stancari E-835 Collaboration Meeting Torino, May
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Weekly Pbar Report 10/26 → 11/2. Stacking This Week …
A Survey of the Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Run II Meeting March 24, 2005 Beams-doc-1752-v2.
Beam Transport and Storage Rings Design Review November 17, 2010 J. Morgan.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
SDA- Shot Data Analysis Jean Slaughter DOE Review July 21, 2003.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Beam based measurements
Ben Cerio Office of Science, SULI Program 2006
Large Booster and Collider Ring
Synchrotron Ring Schematic
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
LHC (SSC) Byung Yunn CASA.
Gap Transient Suppression using Increased Bunch Density
Presentation transcript:

S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:

S. Pordes - to part of CD 09/10/032 ABORT (GAP), BATCH (BARRIER) BUCKET, BUMP, BUNCH, COALESCED BEAM UNCOALESCED BEAM COALESCING, COGGING, COOLING, DAMPERS, (REVERSE) INJECTION STACKING, TRANSITION, QUENCH EMITTANCE, LUMINOSITY LOW BETA, DISPERSION LATTICE (MEASUREMENTS),TUNE, ORBIT, HELIX BETATRON OSCILLATION SYNCHROTRON OSCILLATION CHROMATICITY BARN, INVERSE PICOBARN ACCELERATOR NAMES (M.Martens presentation of 9/03) BLT, BLM, BPM, DCCT, FBI, IPM, FLYING WIRES, OTR, SBD, SCHOTTKY, SYNCHLIGHT, TOROID, RESISTIVE WALL CURRENT MONITOR, SEM, SWIC, VSA DIPOLE, QUADRUPOLE SEXTUPOLE, KICKER LAMBERTSON, RF, SEPARATOR, SEPTUM, TEL ACNET, BEAM SYNC,TCLK FAST TIME PLOT SNAPSHOT, DATA LOGGER SDA LOGSLOGS, Beams Document Data Base

S. Pordes - to part of CD 09/10/033 BD Electronic Logs Page

S. Pordes - to part of CD 09/10/034 Average Luminosity = 41.4 e30 MCR display of Proton and Pbar bunch intensities in the Tevatron

S. Pordes - to part of CD 09/10/035 ABORT - rapid removal of beam into beam-dump (can be planned or not). ABORT GAP – region of beam bunch pattern where there is no beam – designed so that particles are not near the kicker magnet while it turns on. bunch pattern of fully loaded Tevatron at F0 – note gaps between trains – large pulses are proton bunches, small pulses are pbar bunches

S. Pordes - to part of CD 09/10/036 Accelerators: Cockroft-Walton (0 – 750 keV (750,000 Volts) LinacLinac (750 keV – 400 MeV (400,000,000 Volts) Booster Booster (400 MeV – 8 GeV (8,000,000,000 Volts) Main Injector Main Injector (8 GeV – 120 GeV (stacking/external beam) 150 GeV (injection to Tevatron) Tevatron (150 GeV – 980 GeV) (no external beams)Tevatron Antiproton Source Debuncher (8 Gev – 8 GeV : 1 st stage of cooling - pulsed) Accumulator ( 8 GeV – 8 GeV – pbar accumulation) - share a tunnel: Recycler (8 GeV – 8 GeV – pbar accumulation) - shares the Main Injector tunnel: 3 of the 8 systems do not ` accelerate’ note: lower case k is correct, upper case for units named after a person energy is in addition to rest energy (ie is amount of energy due to acceleration) (sometimes you’ll see energy of antiproton source as 8.9 GeV, the 0.9 from rest mass) PROTON SOURCE

S. Pordes - to part of CD 09/10/037 View of Pbar Source and Booster/Linac with FCC. AP10 AP30 AP50 A0 L i n a c Booster B0 FCC

S. Pordes - to part of CD 09/10/038 F0 A0 C0 MI60 MI10 D0 Main Injector and Tevatron protons B0

S. Pordes - to part of CD 09/10/039 Intensity Display – 36 by 36 bunches

S. Pordes - to part of CD 09/10/0310 Beam Position Monitor (BPM) device for measuring beam centroid position: AB X = R*(A-B)/(A+B) A B Y = R*(A-B)/(A+B) A and B are pickup plates that see the image charge of the beam R

S. Pordes - to part of CD 09/10/0311 BPM’s ring-round data

S. Pordes - to part of CD 09/10/0312 Emittance – size of beam.. Transverse emittance = angle spread * transverse size (x & y) Longitudinal emittance = time spread * energy spread Emittance is a constant if you don’t monkey with the beam.. `cooling’ – reduces emittance – makes beam more coherent stochastic cooling (sample beam and correct momenta) electron cooling (embed beam in uniform fluid) (relative temperature is reduced, not absolute) heating – increases emittance – makes beam less coherent transfers from one machine to another; acceleration

S. Pordes - to part of CD 09/10/0313 Beam Line Tuner – detects Betatron oscillation – transverse oscillation of the beam wrt the ideal orbit – also see tune (if we get there) purple dots are the beam position on successive turns after injection; purple is fit to oscillation – fractional part of tune is (data taken using Prep LRS 333’s and 234’s)

S. Pordes - to part of CD 09/10/0314 `Bull’s Eye plot’ – showing amplitude and phase of injection oscillation vs some beam-line magnet current

S. Pordes - to part of CD 09/10/0315 Bucket: one cycle of the accelerating RF: a bunch is contained in a bucket the number of RF cycles it takes for a particle to make a revolution of each accelerator is fixed: this number is called `h’ or the `harmonic number’ (at v = c ) for the Booster, the number of buckets around is 84 (7 * 12) (1.6 microseconds) for the Main Injector, the number is 588 (7 * 7 * 12) (11.2 microseconds) for the Tevatron, the number is 1113 (3 * 7 * 53) (21.0 microseconds) the circulation time for the Debuncher matches the Booster the circulation time in the Recycler is 7 times the Accumulator circulation 1 milliamp in the Accumulator = antiprotons = 0.14 mA in the Recycler Bucket period varies with particle speed: Booster buckets vary from 1/30 MHz to 1/52 MHz. Main Injector buckets vary from 1/52 MHz to 1/53 MHz Tevatron buckets vary from 1/ to 1/ MHz (18.83 nanoseconds) Recycler uses `barrier buckets’ –to confine beam without acceleration (dam)

S. Pordes - to part of CD 09/10/0316 SYNCHROTRON OSCILLATION: OSCILLATION IN TIME (WRT TO RF) (period is ~700 turns) measured by time of beam signal at one place

S. Pordes - to part of CD 09/10/0317 Bunch: a slug of beam…contained in a bucket. Coalesced (bunch) - a big bunch that has been assembled from (5 –15) bunches Coalesced beam – a set of coalesced bunches… Coalescing – the actions required to assemble a coalesced bunch.

S. Pordes - to part of CD 09/10/0318 Time structure of a Proton Bunch in the Tevatron at 980 GeV Ditto for a pbar bunch (*10 vertical gain) Signals from RWCM recorded by SBD

S. Pordes - to part of CD 09/10/0319 proton pulse showing `satellites’

S. Pordes - to part of CD 09/10/ pbar batches at different stages of coalescing in the Main Injector

S. Pordes - to part of CD 09/10/0321 coalescing bunches in more detail

S. Pordes - to part of CD 09/10/0322 Luminosity - `rate of interactions of a given cross section (in cm2) Integrated luminosity - `number of interactions of a given cross section’ cross section `equivalent area that particles present to each other for a given reaction’…for a pair of pool balls (of equal size) it’s 4 times the cross sectional area of each ball; for a pair of protons to collide and produce any extra particles, the area is about ( cms) 2 = cms 2. 1 barn = cms 2 ie cm on a side. 1 picobarn (pb) = cm 2, ( cm on a side) 1 femtobarn (fb) = cm 2 (3* cm on a side) Number of events = IL * cross section  To have 10 events of a reaction with a 1 pb cross section  10 = IL * 1 pb  IL = 10 (pb -1 ) or 10 `inverse picobarns’

S. Pordes - to part of CD 09/10/0323 Luminosity is proportional to: total number of antiprotons, number of protons per bunch, and inversely proportional to transverse beam are at interaction region – pack’em in. Beam area is inversely proportional to `beta’ – hence `low beta’ Run II upgrades are aimed almost exclusively at increasing total number of antiprotons available…present antiproton/proton ratio is ~0.1, aim is for a ratio of 0.5. Issues for this are: accumulating antiprotons quicker: slip-stacking in the Main Injector; debuncher cooling, cooling in the Accumulator, transferring to Recycler; maintaining large stacks in Recycler (electron cooling) preserving longitudinal emittance in Main Injector; preserving longitudinal and transverse emittances in Main Injector and in transfer to Tevatron and understanding and controlling orbits and tunes in the Tevatron

S. Pordes - to part of CD 09/10/0324 Beam profiles from flying wires in Main Injector at different energies

S. Pordes - to part of CD 09/10/0325 Forward and Reverse Injection Tune-up between TeV and MI

S. Pordes - to part of CD 09/10/0326 Beam profiles from flying wires in Tevatron at 980 GeV

S. Pordes - to part of CD 09/10/0327 After 10 minutes After 40 minutes After 90 minutes IPM in Recycler during cooling (display shows 60,000 turns)

S. Pordes - to part of CD 09/10/0328 Synclight images of two antiproton bunches

S. Pordes - to part of CD 09/10/