2-Dec-20051 Offline Report Matthias Schröder Topics: Scientific Linux Fatmen Monte Carlo Production.

Slides:



Advertisements
Similar presentations
Lectures on File Management
Advertisements

ATLAS Tier-3 in Geneva Szymon Gadomski, Uni GE at CSCS, November 2009 S. Gadomski, ”ATLAS T3 in Geneva", CSCS meeting, Nov 091 the Geneva ATLAS Tier-3.
Batch Production and Monte Carlo + CDB work status Janusz Martyniak, Imperial College London MICE CM37 Analysis, Software and Reconstruction.
Multiprocessing Memory Management
MORE ON… MAKING YOUR OUTPUT LOOK NICE! MET 50. Pretty output Recall the more sophisticated PRINT statement: PRINT nn, GRAV nn FORMAT (stuff) We use the.
6 November 2009 Upgrading Your Geant4 Release J. Perl 1 Upgrading Your Geant4 Release Joseph Perl, SLAC Geant4 v9.2p02.
1 Computer Security: Protect your PC and Protect Yourself.
Desktop Security: Worms and Viruses Brian Arkills, C&C NDC-Sysmgt.
Time & Labor & Absence Management Entering Time Worked Classified Employee Timesheet.
Large scale data flow in local and GRID environment V.Kolosov, I.Korolko, S.Makarychev ITEP Moscow.
Study Tips for COP 4531 Ashok Srinivasan Computer Science, Florida State University Aim: To suggest learning techniques that will help you do well in this.
Homework Reading Programming Assignments
Forcing a change into the Global Change Queue A strategy for handling heading changes when there is no matching authority record.
Module 7. Data Backups  Definitions: Protection vs. Backups vs. Archiving  Why plan for and execute data backups?  Considerations  Issues/Concerns.
October, Scientific Linux INFN/Trieste B.Gobbo – Compass R.Gomezel - T.Macorini - L.Strizzolo INFN - Trieste.
Month End/Year End Procedures VENTUS Presenter: Linda Kennedy.
Hands-On Microsoft Windows Server 2008 Chapter 5 Configuring, Managing, and Troubleshooting Resource Access.
03/27/2003CHEP20031 Remote Operation of a Monte Carlo Production Farm Using Globus Dirk Hufnagel, Teela Pulliam, Thomas Allmendinger, Klaus Honscheid (Ohio.
1 Computer and Network Bottlenecks Author: Rodger Burgess 27th October 2008 © Copyright reserved.
Understanding the TigerSHARC ALU pipeline Determining the speed of one stage of IIR filter – Part 3 Understanding the memory pipeline issues.
PPE Web Pages Moved PPE web pages to university supported content management system Staging website for development (Should be) easy enough to add and.
Lecture Topics: 11/17 Page tables TLBs Virtual memory flat page tables
Problem of the Day  Why are manhole covers round?
Write-through Cache System Policies discussion and A introduction to the system.
F. Rademakers - CERN/EPLinux Certification - FOCUS Linux Certification Fons Rademakers.
Setting up and getting going with…. MIT App Inventor.
Silberschatz, Galvin and Gagne ©2009 Operating System Concepts – 8 th Edition, Chapter 3: Processes.
1 LCG-France sites contribution to the LHC activities in 2007 A.Tsaregorodtsev, CPPM, Marseille 14 January 2008, LCG-France Direction.
CERN Using the SAM framework for the CMS specific tests Andrea Sciabà System Analysis WG Meeting 15 November, 2007.
Computer Safety Sid Holder 8k Viruses Hacking Backing Up.
Andrei Gheata, Mihaela Gheata, Andreas Morsch ALICE offline week, 5-9 July 2010.
Analysis trains – Status & experience from operation Mihaela Gheata.
Chapter 7 Object Code Generation. Chapter 7 -- Object Code Generation2  Statements in 3AC are simple enough that it is usually no great problem to map.
Cluster Configuration Update Including LSF Status Thorsten Kleinwort for CERN IT/PDP-IS HEPiX I/2001 LAL Orsay Tuesday, December 08, 2015.
Status of OPAL data Matthias Schröder
CERN – Alice Offline – Thu, 27 Mar 2008 – Marco MEONI - 1 Status of RAW data production (III) ALICE-LCG Task Force weekly.
Introduction What is detector simulation? A detector simulation program must provide the possibility of describing accurately an experimental setup (both.
TB1: Data analysis Antonio Bulgheroni on behalf of the TB24 team.
IT1001 – Personal Computer Hardware & system Operations Week7- Introduction to backup & restore tools Introduction to user account with access rights.
Status of the new NA60 “cluster” Objectives, implementation and utilization NA60 weekly meetings Pedro Martins 03/03/2005.
P51UST: Unix and SoftwareTools Unix and Software Tools (P51UST) Version Control Systems Ruibin Bai (Room AB326) Division of Computer Science The University.
GdI/ICS 1 WS 2009/2010 Telecooperation/RBG Prof. Dr. Max Mühlhäuser Dr. Guido Rößling Dr. Dirk Schnelle-Walka, Stefan Radomski.
11.1 Silberschatz, Galvin and Gagne ©2005 Operating System Principles 11.5 Free-Space Management Bit vector (n blocks) … 012n-1 bit[i] =  1  block[i]
Infrastructure availability and Hardware changes Slides prepared by Niko Neufeld Presented by Rainer Schwemmer for the Online administrators.
Chapter 6 Discovering the Scope of the Incident Spring Incident Response & Computer Forensics.
WLCG Service Report ~~~ WLCG Management Board, 18 th September
CERN IT Department CH-1211 Genève 23 Switzerland t SL(C) 5 Migration at CERN CHEP 2009, Prague Ulrich SCHWICKERATH Ricardo SILVA CERN, IT-FIO-FS.
CASTOR Operations Face to Face 2006 Miguel Coelho dos Santos
Preservation of LEP Data There is still hope Is there? Marcello Maggi, Ulrich Schwickerath, Matthias Schröder, , DPHEP7 1.
20 October 2005 LCG Generator Services monthly meeting, CERN Validation of GENSER & News on GENSER Alexander Toropin LCG Generator Services monthly meeting.
Donor's Choose Starter Instructions by Neely Swygert Teacher-Librarian Gadsden Elementary.
Information Management and the Departing Employee.
2-December Offline Report Matthias Schröder Topics: Monte Carlo Production New Linux Version Tape Handling Desktop Computers.
Pitfalls of your first paper Shu Cai Institute of Computing Technology, Chinese Academy of Sciences
Embedded Real-Time Systems Processing interrupts Lecturer Department University.
How to fix Error code 0x80072ee2 in Windows 8.1? Fix%20%20Update%20Error%200x80072EE2%20in%20Windows%20 8.1,%20Windows%2010!%20-%20Fix%20PC%20Errors.htm.
Availability of ALICE Grid resources in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
File-System Management
How to Contribute to System Testing and Extract Results
Mechanism: Limited Direct Execution
Experiences and Outlook Data Preservation and Long Term Analysis
Chapter 2: System Structures
Spring Cleaning the Software Repositories Matthias Schröder
Luca dell’Agnello INFN-CNAF
Olof Bärring LCG-LHCC Review, 22nd September 2008
Chapter 3: Processes.
Modern PC operating systems
Chapter 3: Processes.
Kanga Tim Adye Rutherford Appleton Laboratory Computing Plenary
Arrays.
Presentation transcript:

2-Dec Offline Report Matthias Schröder Topics: Scientific Linux Fatmen Monte Carlo Production

2-Dec SLC3 & OPAL Environment In production since January –Lxplus on RH7.3 stopped end of August(?) Miminal efforts in providing tools and environment on SLC3 –I just provided what I considered the bare minimum… …and waited that somebody asked for more –Little complains from users –We might still discover missing tools (or variables…) –No serious certification of ROPE, OD and partners done

2-Dec SLC3 & The OPAL PCs All OPAL desktops migrated to SLC3 –Most quattorised at the same time –Systems with little memory VERY slow Use different desktop/window manager? Have a look at Ask your supervisor for a reasonable computer! Still lots of data living on local disks –Hopefully also archived –I had to replace many failed disks on OPAL desktops recently

2-Dec SLC4,5,… The next versions will come for sure –The only question is when Depends on release dates and LHC schedule –SLC4 might be skipped if SLC5 comes early enough (for LHC) Can expect significant problems with completely different fortran compiler –2 bugs in OPAL code detected already –Many problems with SAVEing of variables Might be solved by fixing compiler Hope to be able to keep existing compilers as add-on –Certification of OS and compilers have been decoupled –LHC experiments still need fortran If you develop for LHC don’t forget to sneak in a few fortran routines here and there ;) Trouble to bootstrap patchy –And the old version does not run on SLC4 –And GPHIGS????

2-Dec Fatmen Issues IT continues to migrate (re-pack) our tapes –If registered in fatmen by tape, data becomes inaccessible Fortunately they keep the data available under special castor names I have to –rename files to match our naming convention –update fatmen entries, use only castor name Some MC files have been produced and catalog several times –Have to make sure I convert the correct (best?) entry –I destroy all info about ‘duplicates’

2-Dec Fatmen’s Future

2-Dec Fatmen’s Future IT will stop fatmen service in 2006 –Since NA48 still needs fatmen, the deadline in end 2006 now All data access will have to be done via CASTOR A file catalog would be useful to ensure completeness –But no time to migrate fatmen entries & rewrite ROPE –Migrate fatmen data to keep meta data available? Investigating the options we have MC production system makes heavy use of fatmen for control! Trying to change existing system to decouple it from fatmen not realistic Abandon MC production system and ‘do it by hand’ –But still centrally to avoid complete mess with code, geometry, run numbers and data access –How to arrange for that?

2-Dec Computer Time Allocation The OPAL allocation is a tiny fraction of total capacity –And a very small fraction of what we used to get Usually ok with the little amount of computing we do If you have to run many jobs, please let me know –If urgent I can push them through Don’t run LHC, ILC, CLIC or XXX jobs under your OPAL account –You would use up OPAL quota –Because our allocation is so small, the jobs would wait forever

2-Dec Accounts CERN is getting more active with respect to accounts –Accounts get blocked automatically when people leave CERN / are not registered anymore …and deleted soon after Did a massive exercise of deleting accounts in September –List checked by Pippa and me –We have been rather conservative Unfortunately also deleted accounts we wanted to keep –These have been recreated, also creating some confusion Do we have important files on accounts likely to be deleted? –Make sure that important files are kept OPAL project space is safer than individual accounts

2-Dec Near Future The computer center will be without UPS cover 5th-16th December –No issue as long as there are no power cuts… Two interventions planned during week of December 12th –Provide redundant power for an important router –Will effect AFS, tape access,… –LXBATCH queues will be stopped for these interventions