C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.

Slides:



Advertisements
Similar presentations
Handling of grid losses of HVDC cables in NWE Market Coupling - EMCC proposal for compensation of grid losses – NWE day-ahead meeting, Copenhagen, 22/08/2012.
Advertisements

Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
How to do intraday capacity pricing in a continuous trade environment? 10 October 2011 NRA-TSO-PX meeting (Informal minutes, made during workshop, of the.
Coordinated Market Coupling for GB. 2 Service Provision specified to create a GB Hub with open access to : All GB connected ICs to coordinate XB Capacity.
TITRE 28/03/2012 NWE IG meeting – Amsterdam Schiphol NWE day-ahead price coupling – cost issues.
NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.
Common FUI Portal FUI IG Meeting Ofgem, 30 th September 2011.
Assessment of differences in market designs in the CS region Milan 18 July 2008.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
FUI Feedback on PCG Target Model and roadmap propositions FUI Stakeholder Group Meeting Paris, 4 th November 2009 These comments reflect the general views.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
15 th September 2013 Enagás and TIGF Information to NRAs.
Progress with coupling FUI and CWE region
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Dr. Frank-Peter Hansen Bundesnetzagentur.
Update on Coordination of long term auctions in the FUI region FUI IG, London, 13 th September.
EU Developments Transmission Workgroup 6th October 2011.
Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012.
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Project Status Update 2 nd IG meeting NRA meeting October 26 th Joint Presentation from.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting March 28 th 2012 Amsterdam Joint Presentation from TSOs and PXs.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation.
What questions would you like to ask?. From which country does the UK import the most services? (1) Germany To which country does the UK export the most.
Loss Reserving in Argentina, Brazil and Mexico Eduardo Esteva New Orleans, Louisiana September 11, 2001.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
PCR Status report AESAG, September Supported by:
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Cross Border Balancing - 2Hr Product NGET and RTE Paper.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
PCR Status Date: 5 December Content Achievements Revised planning outlook Reasons for delays Remaining risks.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Cross Border TSO Balancing Procurement - a Generator/Trader Perspective Malcolm Taylor Head of Electricity Trading Association of Electricity Producers.
General support to Northern Europe ERI priorities. Urges the Northern Europe RCC to proceed – not only with - Optimizing the use of interconnectors - Transparency.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
1 GTE Transparency Platform GIE Annual Conference Madrid, 22/23 November 2007 Paolo Mosa GTE Vice President.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
Loss Reserving in Mexico
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Handling of grid losses of HVDC cables in NWE Market Coupling - EMCC proposal for compensation of grid losses – NWE day-ahead meeting, Copenhagen, 22/08/2012.
Supported by: PCR Status report AESAG, September
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Coordinated Market Coupling for GB
IG meeting, December 5th, 2012, DERA premises, Copenhagen
IFA Market Coupling Update
EUROPEAN ENERGY MARKET SUMMIT 30 January 2007
IG meeting, December 5th, 2012, DERA premises, Copenhagen
NWE Day-Ahead Price Coupling
Public workshop: CBA 3.0 –come and improve with us the transmission and storage assessment methodology Brussels 07 November 2017.
Shadow opinion on the Pricing Proposal
26. January 2013 Erik Skjelbred, Snr VP Statnett
Changes to Reserve Level Declaration Guidelines
Presentation transcript:

C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen

C O U P L E D Background The NWE Project presented how losses will be implemented in the algorithm at the IG meeting of September 19 th in Copenhagen NRAs agreed to post several questions to the TSOs to asses the consequences of implementing losses The TSOs received a request including 10 questions from the NRAs on October 1 st. The NRAs have asked for answers by the following IG meeting, i.e. December 5 th. TSOs have responded that this would not be possible due to time constraints and lack of simulation tools. The response will be provided by first IG meeting in 2013 (assumed by end February)

C O U P L E D Losses modelling in PCR Algorithm Possibility for the algorithm Linear losses are allowed, i.e. the losses are a fixed percentage of the flow. Deciding the loss factor Based on a technical analysis the percentage is defined. TSOs specify losses percentage based on actual losses for individual DC line (e.g. IFA ~2%, NorNed~4%) Price Properties mcp to (1-loss) - mcp from = 0 when no congestion (no congestion rent), mcp to (1-loss) - mcp from > 0 when line is congested The price difference will always be sufficient to cover the costs of losses when the cable is uncongested Energy Balance The sum of net positions plus losses is equal to zero 1040 MW 1000 MW F exp=1040 MW F imp = F exp - losses= 1000 MW HVDC Losses ~ 4 %

C O U P L E D Impact assessment on losses Following simulations have been agreed between TSO and PXs Run #1 – No losses at all - The output is the reference result in terms of social welfare, prices and flow pattern Run #2 – Harmonised Loss Factor (say 2%) on all existing DC cables (harmonized case) / No loss on AC interconnectors Run #3 – Individual Loss Factor (2.34% IFA, 2.5% Kontek, 3.6% Skagerrak…) on all existing DC cables / No loss on AC interconnectors Run #4 – Individual Loss Factor on some DC cables (BritNed, IFA and Baltic) / No loss on AC interconnectors Run #5 – Harmonised Loss Factor in some DC cables (BritNed, IFA and Baltic) / No loss on AC interconnectors Run #6 – Loss factor on all DC cables / Including losses on AC interconnectors (average loss value) The outcome in terms of flow patterns might need additional simulations with the flow calculation prototype (3- step approach including pro-rata rule for UK) where there are flow indeterminacies Indicators: Overall social welfare and breakdown of welfare to individual countries for consumer and producer surplus. Congestion revenue per border. Results compared to reference case (Run 1, which excludes any losses) Interconnector flows (commercial flows as calculated by the algorithm) compared to reference case. Changes of losses in the AC network Market clearing prices compared to reference case

C O U P L E D Further work The release #1 and #2 of Euphemia include the loss functionality. The flow calculation will not be included until release #3 which is final tested by end December. The TSOs propose therefore that simulations are done based on release #3 of the algorithm and including of flow calculations. Simulations can start early January if the test has been successful The TSOs will hire an external consultant to write a report/answer the questions. A more detailed plan for this work will be sent to the NRAs when it has been agreed among TSOs and PXs