CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.

Slides:



Advertisements
Similar presentations
Pixel Cooling System Modifications C. Newsom December 17, 2009 University of Iowa.
Advertisements

CMS Pixel Technical Board Meeting – Dec. 16, Forward Pixel Cooling System Information Joe Howell.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Data Center & IT Monitoring Use Cases Regional Seminar Series Carolyn.
Maintenance and Engineering Procedures and Tools at Soreq Applied Research Accelerator Facility I. Gertz, Y. Buzaglo, A. Grin, R. Michael, R. Raizman,
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
P. Tropea for the PH-DT CO 2 team CO 2 CERN 11 March 2015 CO 2 cooling activities in PH-DT.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
The SPD cooling plant: status and plan of upgrades Rosario Turrisi.
RP PROCEDURE FOR FLUID ANALYSIS Detector Cooling Project - 16 th June 2011 Heinz Vincke, Nadine Conan DGS/RP..... based on EDMS document # prepared.
EN/CV/DC Fluid analyses and Radiation Protection monitoring Presentation done by Elena Perez Rodriguez For further information contact
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
M. Battistin – 8 th April 2009 DC Project 1 M. Battistin 8 th April 2009 Detector Cooling Project - The present M&O Agreement.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
TK Dry Gas System Operation  System overview  Dry Gas Consumption  Interlocks and thresholds  Documentation  Operational model  Final comments.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
State of Georgia Release Management Training
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
G. Bolla For the CMS Pixel Group 2/25/20161 Status at P5 and infrastructures (mainly cooling) Status at P5 and infrastructures (mainly cooling)
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Tracker Goals o Main issue is to be able to run cold as more radiation is accumulated. o Due to “uncontrolled” humidity behavior, our present limit is.
CV Industrial Control SystemsJCOV Meeting October 23, 2003 ST/CV ACTIVITY Industrial Automation ST/CV is responsible for the design and implementation.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
S A Griffiths CM42 June 2015 Electrical & Control.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
CO2 ON-CALL SERVICE ORGANISATION
Gas System Commissioning
Tracker cooling loop “check out” draft for discussion
How SCADA Systems Work?.
M. Battistin CERN EN/CV/DC 9th July 2009
Pixel Cooling System Modifications
Low temperature chiller Market Survey
Office 365 Security Assessment Workshop
Across the entire value chain
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment

21 April 09P. Tropea2 Main requirements & outline This document collects the wishes of CMS for what concerns the operation and maintenance of the CMS fluorocarbon cooling systems at P5 and TIF. CMS would like to have: A dedicated work package between CMS & EN/CV/DC, independent from other experiments. The cost shall be discussed on the base of the service provided and the spares needed for CMS. Annual engagement, to be renewed tacitly or reviewed with at least 6 months notice Structure of the document 1.Limit of responsibility 2.Operation & fine tuning 3.Maintenance 4.Stand-by duty 5.Spare parts 6.Fluid management

21 April 09P. Tropea3 Limits of responsibility EN/CV/DC is in charge of the operation and maintenance of all the systems designed by them (chiller, brine circuit, Preshower, Thermal Screen and TIF cooling plants) and all of the systems (Silicon Strip 1 & 2 and Pixels) for which an official acceptance protocol shall be signed between CMS and EN/CV/DC (done for Pixels plant). This protocol shall be commonly agreed before the signature of the maintenance and operation agreement. The physical limit of responsibility is placed, as in the previous agreement, at the exit of the C6F14 cabinets in UXC55, where copper pipes are laid to the detector, including all the shut-off and manual regulation valves on manifolds. Not covered by this document: commissioning phase and upgrades.

21 April 09P. Tropea4 Operation & fine tuning Two levels of access are required through the PLC touch panel (both password protected). Without password, the PLC touch panel can be used for monitoring purposes only. 1)“Expert CMS user” 2)“EN/CV/DC”: maintenance & operation The “Expert CMS user” actions will be accessible also through DCS, switching of the physical key on the PLC rack (additional 6 keys to be implemented). DCS will develop a “standard user” interface reducing the available actions and parameter ranges. All DCS actions will be traced.

21 April 09P. Tropea5 CMS “expert user” “Expert CMS user” can, either through the PLC or DCS: -read all parameters -Read all set points and alarm thresholds (alarm thresholds: for the time being those values will be given on a spreadsheet, to be updated each time they are modified into the PLC program. By September 09 it will be possible to read them through DCS), -change pressure and temperature set points within the agreed range (to be established at the end of commissioning with EN/CV/DC) -Remotely operate cooling loops (on/off/lock) -Remotely operate the manifold valves, on/off mode of single loops valves -Operate the vacuum pump (this functionality has to be agreed for each cooling plant during commissioning)

21 April 09P. Tropea6 Maintenance EN/CV/DC organizes predictive and corrective maintenance following their standards and internal procedures (CAMMS, etc.). The maintenance plan major points shall be illustrated to CMS and agreed by both parties. All predictive maintenance activities shall be scheduled in common agreement weeks in advance and confirmed in writing few days before the intervention (both from CMS and EN/CV/DC side). As a CMS general traceability policy, CMS requires a written report (logbook or ) after each intervention. A summary report shall be sent to CMS cooling coordinator every three months, including the full list of preventive and corrective maintenance interventions done and the possible extra cost associated (account details). In case of major problems and corrective maintenance operation disrupting the operation of the detector, the solution proposed shall be presented and agreed along with its implications by CMS

21 April 09P. Tropea7 Normal operation support and stand-by duty Interventions shall be guaranteed for corrective actions: -In 1 hour during working hours (8h30/17h30) and 24/7 during beam time or critical detector operation (defined by CMS) -in 2 hours during other time The stand-by duty personnel shall be able to: -Put the system in a safe state (for the detector & the plant) -Make a basic diagnostic of the problem and restart the system in case of minor failure -Contact an EN/CV/DC expert available on a “best effort basis” for major problems -Write a report at the end of his intervention (logbook) A CMS representative shall accompany the “piquet” when intervening in underground areas (2 men rule) In case of multiple requests received by the same piquet, CMS infrastructure manager shall be consulted to define priorities between sub-detectors or to find an agreement in case of different experiments requiring the same service

21 April 09P. Tropea8 Spare parts The list of strategic spare parts shall be approved together with the M&O agreement. This has to contain the number of spares already in hand and the list of purchases suggested for the short and long term. Consumables shall be well defined and listed, in particular to precisely define what is NOT part of consumables. Storage: a fenced area, locked, will be organized in P5 to store: -Any spare part not transportable by a sole person (pumps, motors, compressors) which are not common to any other experiment -Strategic parts and tools dedicated to the cooling systems -Clean fluids and tools for filling/draining

21 April 09P. Tropea9 Fluid management During the first 3 months of run of each cooling plant, an estimate of the leak rate per cooling plant will be done. This value will be used to assess the annual need of coolant for the following year. Any anomalous leak loss (detector disconnecting their cooling loops, maintenance activities, accidents, etc.) shall be justified and recorded on a common logbook. EN/CV/DC is responsible for the monitoring of the fluid levels, leak rates and fluorocarbon quality as well as for the related leak searches and repairs in due time up to the distribution valves on the manifold. Scheduling of leak search activities shall be mutually agreed whenever a derive of the leak rate is discovered.