Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.

Slides:



Advertisements
Similar presentations
By Chris Ford and James Hughes ( ) ( )
Advertisements

Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
1 Midland Community Meeting Michigan Department of Environmental Quality Steven Chester, Director Jim Sygo, Deputy Director.
DEQ Waste and Remediation Division Programs Michael McCurdy Ground Water and Remediation Section Manager Boise Regional Office.
BoRit Superfund Site Timeline
Environmental Protection Commission Overview Vision: Environmental Excellence in a Changing World.
 Site Assessment and Mitigation Program Department of Environmental Health – County of San Diego.
California EPA Dept. of Toxic Substances Control Brownfields & Environmental Restoration Program Sam V. Martinez, Jr.
Keith Bentley Land Protection Branch Chief 1 Georgia EPD Update Land Protection Branch Air and Waste Management Association Annual Meeting April 2013.
What is NPDES? “National Pollutant Discharge Elimination System”
Craig L. Carlisle Senior Engineering Geologist San Diego Water Board Update.
1 Indiana Department of Environmental Management Budget Presentation FY
Federal Mogul Department for Environmental Protection Kentucky Division of Waste Management February 10, 2015 Presented by Chris Jung To Protect and Enhance.
Resource Conservation and Recovery Act
Environmental Issues for Rural Communities STATE FUNDING AND TECHNICAL SUPPORT Sandy Karinen Cal/EPA Department of Toxic Substances Control Site Mitigation.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
Assessing Your School An Environmental Investigation You have been hired by Eagle Environmental, Inc. to perform an Environmental Assessment of South Hunterdon.
COMPLIANCE ASSISTANCE OFFICE Giving small businesses a helping hand to overcome hurdles in Environment Regulations Genevieve Salmonson Compliance Assistance.
Emergency Response: Preparing for Disasters & Emergency Incidents June 2, 2015 Guest Secured Password: rangers!
Phase I Environmental Assessment By: Robert M. Senga, Section Chief Tiered Permitting Corrective Action Branch DTSC, Cypress Office (714)
Tier II: Module 1C CERCLA 128(a): Tribal Response Program.
DTSC VAPOR INTRUSION GUIDANCE California Industrial Hygiene Council 16 th Annual Conference Dan Gallagher Department of Toxic Substances Control California.
Solid Waste Laws. Federal Legislation RCRA (1976)- The Resource Conservation and Recovery Act) CERCLA (1980) –The Comprehensive Environmental Response,
Contaminated Land Management Framework in Malaysia
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
Overview of the Land Recycling Program (Voluntary Cleanup Program)
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
A PROGRAM THAT OFFERS CUSTOMIZED ASSISTANCE TO PROPERTY OWNERS & INTERESTED PARTIES WITH THEIR ENVIRONMENTAL ISSUES Voluntary Assistance Program (VAP)
Underground Storage Tank Compliance Act of 2005 Bill Torrey UST/LUST Regional Program Manager US EPA – New England EBCNE April 19, 2006.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Italy: the new legislation on the remediation of contaminated sites F. Quercia, APAT Tour de Table NATO CCMS Pilot Study Meeting 5-7th June 2006, Athens,
October Mary Louise Hendrickson Solid Waste Section – Technical Lead
Web Resources Michael Gage New Jersey Department of Environmental Protection County Environmental and Waste Enforcement Special Investigations and Oversight.
Tier I: Module 5 CERCLA 128(a): Tribal Response Program Element 4: Verification & Certification.
The Superfund ERA Process. What is Superfund? Superfund was created on December 11, 1980 when Congress enacted the Comprehensive Environmental Response,
COMPLIANCE MONITORING and INSPECTIONS Or, how to run an effective program through an adequate field presence.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Regulatory Framework for Uranium Production Facilities in the U.S.
Congratulations! It’s a Burn Dump. What Do You Do Now? LEA/CIWMB PARTNERSHIP CONFERENCE Anaheim, California May , 2005 California Environmental.
By Mitch Cooper & Haley Herbert January 1987 Vertac site manufactured herbicides 1978 National Dioxin Survey 1983 Site placed on the National.
California Integrated Waste Management Board 1 Committee Items C-D (Board Items 2-3) November 5, 2007 Consideration Of: Item C/2: The Scope Of Work For.
Environmental Regulation.  Complex set of laws  Constantly changing  Cover: Release, treatment, storage and disposal of Hazardous materials Into air,
Outreach for the On-Call Hazardous Waste Site Investigation and Design Services Contract Caltrans D9 February 17, 2016.
1 Indiana Department of Environmental Management Budget Presentation FY
NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Pete Doorn Special Remediation Branch Superfund Section Division of Waste Management
The Resource Conservation and Recovery Act of 1976 and 1989 (RCRA) Alex Chenault Period 4.
Division of Waste Management Dexter R. Matthews, Director Mission: to prevent harmful releases of waste to the environment and clean up existing contamination.
Sustain Noblesville Committee September 19, 2011 Thomas W. Easterly, P.E., DEE, QEP Commissioner, Indiana Department of Environmental Management.
David K. Paylor Virginia State Board of Health March 17, 2016.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
Department of Toxic Substances Control “IT’S ELEMENTARY!” School Brownfields and Institutional Controls Hamid Saebfar Acting Assistant Deputy Director.
Slide 1 California Implementation Water Board Policies.
Omaha Riverfront Redevelopment Project Brownfields 2004 C. Dale Jacobson, P.E., DEE.
Leon Wirschem, REHS/HMS County of San Diego Department of Environmental Health Hazardous Materials Division
Proposed Plan for No Further Action
Minnesota CLE June Webcast Extravaganza Environmental Law Basics for the Business and Real Estate Practitioner Joseph G. Maternowski, Hessian & McKasy,
EPA Options for the Federal Regulation of Coal Combustion Waste Lisa Evans Earthjustice October 22, 2010.
Chemical Metals Industries, Inc. (CMI)
Welcome.
RESTORING CONTAMINATED SITES TO PRODUCTIVE USE
Timothy Veatch, Section Chief
CERCLA 128(a) Tribal Response Program Site Specific Work: Introduction
Georgia Update Jeff Cown Land Protection Branch
Solano County Department of Environmental Management Environmental Health Services Division Hazardous Materials.
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
Branch Organization Chuck Mueller, Branch Chief
Chemical Metals Industries, Inc. (CMI)
Cupa violation Review BAESG Meeting May 20, 2019 Matthew Burge
Presentation transcript:

Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site Assessment & Mitigation Program

Corrective Action Designation O On February 28, 2014, the Department of Toxic Substances Control (DTSC) delegated authority to DEH, as the local Certified Unified Program Agency (CUPA), to oversee Corrective Action at permitted facilities in the County of San Diego. O Application submission and acceptance was a multi- year process.

What is Corrective Action? O Corrective Action is the term used in federal (RCRA) and state (HSC Ch. 6.5) law for the cleanup of hazardous waste or constituents at a facility engaged in the management of hazardous waste. O Corrective Action is all the activities taken to investigate, characterize, evaluate, remove, or remediate a release of a hazardous waste or constituents to a level of human health and environmental protection compatible with the use of the property.

Corrective Action cont. Corrective Action does not apply to: 1. The cleanup of waste residue during closure of a hazardous waste management unit 2. Small spills and releases that are cleaned up as part of routine housekeeping 3. Emergency response actions

Corrective Action Delegation to CUPA O A two Tier delegation approach was adopted based on CUPA qualifications and the complexity of the site requiring corrective action. O A qualified CUPA and DTSC are the only agencies authorized to implement the corrective action requirements of the Unified Program (HSC ).

CA Delegation cont. Tier 1 delegation authority allows a UPA to: O Oversee Preliminary Endangerment Assessments O Issue orders requiring corrective action at less complex sites O Oversee corrective action at less complex sites

Less Complex Site O Contaminants of Concern limited to those for which cleanup screening numbers have been developed (CHHSLs) O Cleanup will consist of removing less than 60 cubic yards of contaminated material O Cleanup will achieve 10-6 risk screening levels for all contaminants

CA Delegation cont. Tier 2 delegation authority allows a UPA to: O Implement and enforce all Tier 1 activities O Enforce corrective action at all facilities within the jurisdiction of the CUPA O Oversee corrective action at complex sites

When is Corrective Action Required? Corrective Action Required Phase II Environmental Assessment Inspections PBR/CA Closure Suspected Release No Further Investigation Required Further Investigation Required Clean Closure

Title 22 CCR Section Requires a corrective action process that fulfills the following: O Meaningful public involvement O Site screening using Preliminary Endangerment Assessment (PEA) manual O Adequate site characterization of release and risk assessment that evaluates risk O Cleanup that is protective of human health and environment (10-6 risk level)

Title 22 CCR Section cont. O Adequate oversight to ensure corrective action is completed appropriately O Enforcement to ensure corrective action is performed O Financial assurance for long term implementation of corrective action remedies O Requirement for land use covenants for residual contamination left in place that is not suitable for unrestricted land use

Sources for Corrective Action Cases O Referrals from Hazardous Materials Division, including routine inspections and PBR/CA closures O Recalcitrant Voluntary Assistance Program cases that are or were CUPA permitted facilities O Analytical data submitted in compliance with Monitoring Well Program permits at sites that are were CUPA permitted facilities

Case Study Symcoat Metal Processing, Inc Thornmint Road, San Diego, CA 92127

Symcoat Metal Processing, Inc. O Sampling required in accordance with PBR closure plan requirements of Title 22 CCR (c)(11)(B) for fixed treatment units O Operated on property since 1992 O Conducted parts plating, anodizing and painting operations

Symcoat Metal Processing, Inc. O Liquid waste stream was treated onsite under PBR guidance O Waste stream processed by flocculation and precipitation which is then filter pressed into a solid filter cake O Discharge of liquids under permit into San Diego County Publically Operated Treatment Works (POTW)

Symcoat Metal Processing, Inc. O On April 10, 2014, DEH staff conducted a site inspection of the former Symcoat Metal Processing, Inc. facility. O Based on the site inspection, DEH identified five areas of concern (AOCs) that may have had releases of hazardous waste or hazardous constituents into the environment.

Symcoat Metal Processing, Inc. O AOC #1: Paint Storage Area O AOC #2: Plating Lines O AOC #3: Waste Treatment Equipment Area O AOC #4: Dedicated Sewer Line Sampling Port Area O AOC #5: Chem Film Room

Plating Lines

Nickel Plating Line

Anodizing Line

Symcoat Metal Processing, Inc. O 19 soil sample locations proposed. Samples to be collected by Geoprobe direct push drill rig. O The samples will be collected with an Encore sampler from the retracted Geoprobe push sampler. O Sample analysis will be for pH by EPA Method 9045, CAM 17 metals by EPA Method 6010B, and semi-volatile analysis for select samples by EPA method 8270 O Groundwater estimated to be >100 feet below ground surface

Symcoat Metal Processing, Inc. O Symcoat’s December 16, 2005 Closure Plan proposed: O Soil and/or groundwater sampling and, if necessary, remediation O Sampling of the concrete in the upper inch of the containment areas and the analysis of the samples for metals. O Sampling of areas where the concrete is visibly deteriorated or cracked, will be sampled and tested for contamination The proposal for the evaluation and sampling of the impacted areas of concrete will need to be addressed in the forthcoming PEA.

Thank You Questions? James Clay: (858)