Congestion Management Working Group WMS update 11/7/2012.

Slides:



Advertisements
Similar presentations
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Advertisements

March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
MISUG Meeting Materials ERCOT 10/16/ Agenda 10/16/ Antitrust AdmonitionJ. Lavas 9:30 a.m. 2.Introduction/Agenda OverviewJ. Lavas 9:35 a.m.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010.
1 CRR Credit Policy Task Force Update TPTF July 21, 2008.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Kenan Ogelman TAC Chair Tab 8.2: 2013 Competitive Constraints Board of Directors Meeting ERCOT Public September 18, 2012.
Commercial Operations Subcommittee (COPS) January 2014 Update to TAC 1/29/2015.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
1 CRR Credit Policy Task Force Update WMS April 16, 2008.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Lead from the front Texas Nodal 1 Texas Nodal Congestion Revenue Rights (CRR) EDS 3 Release 7 - Overview EDS 3 Phase 2 MP Planning.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Protocol Revision Subcommittee Tom Burke June 7, 2012.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
CMWG Update WMS September 2015 Meeting. CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap.
1 WMS Report To TAC May In Brief One Working Group Reports One Working Group Reports Two Task Force Reports Two Task Force Reports One Staff report.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
CMWG Update to WMS Report of CMWG Meetings of &
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
Congestion Revenue Rights 1 Texas Nodal Market Implementation Program CRR Requirements Updates CRR Project Team – Presented by Beth.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG October 23, 2015.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
Congestion Management Work Group Update WMS I Flores, S Reedy—ERCOT M Wagner--PSEG TX.
Lead from the front Texas Nodal 1 Resource Node Locations WMS Subgroup Meeting.
1 WMS Report TO TAC April 2007 (which is in March)
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
Constraints Competitiveness Tests (CCT) Results Analysis of 2010 SSWG Peak Summer Case Presented to CMWG 1/27/2010.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
CMWG Update to WMS M Wagner Edison Mission Marketing & Trading.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
CMWG Update to WMS Report of CMWG Meeting of
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
1 WMS Report To TAC October In Brief One Working Group Report One Working Group Report One Task Force Report One Task Force Report Three Staff.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.
1 Market Trials Update NATF January 5, 2010.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Market Trials Update NATF March 2,
Presentation transcript:

Congestion Management Working Group WMS update 11/7/2012

CRR Annual Auction The CRR transaction limit of 2,500 for year 1 of CRR Annual Auction avoided the bid rationing process. Matt Mereness reported 133,540 transactions were submitted (168,552 were available). Active CRR Account Holders has risen to 145 from 97 as in the 2011 annual auction Year-one of the CRR Annual Auction is finished running Peak Week Day took 210 hours to solve.

Over-mitigation Mitigation is being applied to broadly – Mitigating resources in step 2 that are meeting load balance, however have no impact on non competitive constraint – “Tie breaking” logic QGSRs tied with the marginal Step 1 resources receive small base point requiring them to come online at LSL when they are not really needed by system, which in turn causes price depression. ERCOT will draft their proposed solution in the form of a Nodal Protocol Revision Request to be reviewed at the December 14 th CMWG meeting. – Includes running the CCT every 5-minutes in real-time to determine which resources impact a constraint – Add a feature in the Energy Offer Curve cap logic that would differentiate QGSRs offers – Key items for the Constraint Competitiveness Test being discussed: Eliminate ECI on export side and price floors; 3-player test (Shams); consider concentration of the MWs needed (Clayton)