US Army Corps of Engineers BUILDING STRONG ® Dynamic PCB Partitioning in Ashtabula Harbor, Ohio Sediments Andrew Lenox Environmental Engineer US Army Corps.

Slides:



Advertisements
Similar presentations
ABSTRACT Background. Sydney Harbour (SH), Nova Scotia has long been subject to effluent and atmospheric inputs of metals, polycyclic aromatic hydrocarbons.
Advertisements

PCBs Total Maximum Daily Loads San Francisco Bay Fred Hetzel SFB-RWQCB May 13, 2003.
Framework for the Ecological Assessment of Impacted Sediments at Mining Sites in Region 7 By Jason Gunter (R7 Life Scientist) and.
IMPROVING ESTIMATES OF SUSPENDED SEDIMENT CONCENTRATION AND FLUX IN THE LITTLE BEAR RIVER Brant Whiting, Jeffery S. Horsburgh and Amber S. Jones Utah Water.
Chemistry, Environmental Fate and Transport, Production and Uses Charge Question 2-1: Please comment on whether the information is used appropriately in.
NASSCO and Southwest Marine Sediment Investigation Preliminary Results Thomas Ginn, Ph.D. Dreas Nielsen June 18, 2002.
RISK e Learning Bioavailability – Metals, Organics, and Use at Hazardous Waste Sites June 11 th, 2008 Session 2: “Bioavailability of Organic Compounds:
Biodegradation of organic pollutants in a composting environment in Mauritius Vijayalaxmi Jumnoodoo PhD Candidate Department of Chemical and Environmental.
Sediment Quality Criteria William Fish Civil Engineering Environmental Sciences And Resources.
IR Site 7 Sediment Remediation
Factors Affecting Water Quality Chapter 6. Introduction  Many types of pollutants and many factors affecting the toxic effect of those pollutants  Factors.
Current and Emerging Paradigms in Environmental Toxicology Lecture 2.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Chemical and Biological Behavior of Carbon Nanotubes in Estuarine Sedimentary Systems P. Lee Ferguson 1, G. Thomas Chandler 2, and Wally A. Scrivens 1.
A Brief Review by: Akbar Tahir Faculty of Marine Science and Fisheries University of Hasanuddin Marine coastal pollution: causes, effects and management.
Pomme de Terre Lake Water Quality Summary Pomme de Terre Lake Water Quality Summary US Army Corps of Engineers Environmental Resources Section.
Radionuclide dispersion modelling
Environmental Processes Partitioning of pollutants 3.i Sorption involving organic matter (between air/soil and water/soil)
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Screening Level Ecological and Human Health Risk Assessment Poplar Point, Washington, DC.
The Chemical Context of Life Elements of Life Atoms, Molecules & Compounds Chemical Bonds Structure and Function Chemical Reactions.
Examining Bioaccumulation & Biomagnification: Implications for Ecosystems and Human Health.
Environmental Processes Partitioning of pollutants 3.iii Sorption in living media (bioavailability)
BACKRIVER TMDL PROJECT Technical Outreach Prepared by MDE/TARSA Prepared for the Baltimore Harbor Stakeholder Advisory Group September 10, 2002.
An Examination of the Factors that Control Methylmercury Production and Bioaccumulation in Maryland Reservoirs Draft Final Report June, 2006 Cynthia C.
Modeling to Understand Stormwater Management Efforts Portland Harbor Superfund Site Dawn Sanders City of Portland Bureau of Environmental Services September.
Geostatistical Modeling as a Quality Management Tool to Address Uncertainty in Decision-making for Large Scale Sediment Assessment and Remediation Projects.
Development of Sediment Quality Objectives for California Bays and Estuaries Scientific Steering Committee Meeting Summary August 3-4, 2004.
I. I.Water Pollution – Sources and Effects B. B.Sources 2. 2.Other factors Factors besides chemical pollutants can degrade water quality a. a.Removal of.
Benefits of the Redesigned RMP to Regional Board Decision Making Karen Taberski Regional Water Quality Control Board San Francisco Bay Region.
Bioremediation Definition: Use of living organisms to transform, destroy or immobilize contaminants Goal: Detoxification of the parent compound(s) and.
Evaluation of Intrinsic Biodegradation and Amendments to Support Enhanced Monitored Natural Recovery of Sediments Tom Krug and David Himmelheber, Geosyntec.
Proposed Lake Michigan Rivers Network NMN proposed 17sites. Lake Michigan group added 3 additional sites that already conduct flow and quality monitoring.
Dredging Contaminated Sediments Should the Ashtabula River be dredged? An Earth Systems Lesson Plan Developed by Jeremy King.
Stable isotopes: can they serve as tracers of fish farm effluents in all environments? Sonja Lojen Department of Environmental Sciences, Jožef Stefan Institute,
Lipids Water. Cwater GILL UPTAKE GILL ELIMINATION Fish-Water Two Compartment Model dC F / dt = k 1.C W – k 2.C F C F : Concentration in Fish C W : Concentration.
SEDIMENT EVALUATION FRAMEWORK: THE APPLICANT EXPERIENCE Jeffrey Peterson, Ph.D.
Polychlorinated Biphenyls (PCBs)
Development of Sediment Quality Objectives for California Bays and Estuaries Project Update Steven Bay Southern California Coastal Water Research Project.
Modelling the PCB bioaccumulation in the hake (Merluccius merluccius) from the Gulf of Lions (Mediterranean sea) X. Bodiguel 1, V. Loizeau 1, C. Mellon.
Partitioning and Bioavailability Assessment for Sediments from South Wilmington Wetlands Huan Xia and Upal Ghosh Department of Chemical, Biochemical,
1 of 27 The EPA 7-Step DQO Process Step 5 - Define Decision Rules (15 minutes) Presenter: Sebastian Tindall Day 2 DQO Training Course Module 5.
Porewater: NJDEP Site Remediation Program regulatory perspective
Management of threats to fish and wildlife from PBTs Scott Redman, Puget Sound Action Team Puget Sound Plankton - The Ultimate Seafood Experience, Jan.
Characterizing the Post-Dredge Surface: Comparison of In-Situ (Pre-dredge) and Post-Dredge Grab Samples at Three Sites in the Willamette River, Portland.
US Army Corps of Engineers BUILDING STRONG ® Dredging with Turbidity Tests and the EPA in Green Bay Harbor Michael Staal, E.I.T. Civil Engineer U.S. Army.
Brian Hitchens and Sam Williams PCBs in the Urban Environment: Implications for Long-Term Sustainability Of Low-Threshold Remediation.
SQO 4/7/05 INCORPORATING MULTIPLE LINES OF EVIDENCE INTO SEDIMENT QUALITY OBJECTIVES Stephen B. Weisberg Southern California Coastal Water Research Project.
B1 Fe(0) and Coke as “Active” Cap Media for PCB Destruction/Sequestration Gregory V. Lowry Kathleen M. Johnson Paul J. Murphy Meghan L. Smith EPA-TIO Anacostia.
Drew A. Carey, Ken Hickey; CoastalVision Christopher Wright; CR Environmental Joe Germano; Germano & Associates Steven Wolf, Tom Fredette; USACE How the.
Katherine von Stackelberg, ScD E Risk Sciences, LLP Bioaccumulation and Potential Risk from Sediment- Associated Contaminants in.
Beneficial Reuse of Sand on the Fox River Sediment Remediation Project Neil Geevers (Stuyvesant/Boskalis) Richard J. Feeney, P.E. (Tetra Tech) Terri L.
Combining prediction and monitoring for reduction of toxics: the Lake Michigan Mass Balance Study Glenn Warren, Russell Kreis, and Paul Horvatin U.S. EPA,
Alternative Evaluation Framework for Managing Dioxins/Furans in Dredged Material Proposed for Open-Water Disposal Tad Deshler Windward Environmental LLC.
Presentation for Office of Surface Mines on Potential Use of the Leaching Environmental Assessment Framework to enhance source terms for use of CCRs in.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Brownfields 2011 Philadelphia, PA – April 5, 2011 Vanessa Steigerwald-Dick, Ohio EPA Amy Yersavich, Ohio EPA Urban Gardens on Brownfields: Making Them.
Same dredger, different location: Environmental impacts of dredging
Gregory J. Cavallo, P.G. Thomas J. Fikslin, Ph.D.
2011& 2012 FISH and SHELLFISH Monitoring Maury Hall and Yong Lao, MWRA Michael Moore, WHOI Outfall Monitoring Science Advisory Panel April.
Polychlorinated Biphenyls (PCBs)
US Environmental Protection Agency
Factors Affecting Water Quality
MAJOLAGBE A.O. AND YUSUF K. A. Lagos State University.
Modelling the PCB bioaccumulation in the hake (Merluccius merluccius) from the Gulf of Lions (Mediterranean sea) X. Bodiguel1, V. Loizeau1, C. Mellon2,
Niagara River Area of Concern
Complex Estuarine Dynamics
Pearce Creek DMCF Baseline Exterior Monitoring Spring 2017 Results
Effect of Aging on Contaminant Bioavailability
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Dynamic PCB Partitioning in Ashtabula Harbor, Ohio Sediments Andrew Lenox Environmental Engineer US Army Corps of Engineers, Buffalo District

BUILDING STRONG ® Introduction  Ashtabula Harbor, Ohio ► Federally (USACE) maintained deep-draft harbor ► USEPA Great Lakes Area of Concern (AOC) Restriction on dredging beneficial use impairment (BUI) Contaminants of Concern (COC) listed as mercury, chromium, lead, zinc, chlorinated organic compounds, polychlorinated biphenyls (PCBs), and low level radionuclides

BUILDING STRONG ® Buffalo Cleveland Ashtabula Lake Erie Erie N

BUILDING STRONG ® Lake Erie Ashtabula Harbor

BUILDING STRONG ® Background  PCBs are main COC with respect to dredged material management ► Evaluation based on tiered assessment of bioaccumulation in benthic organisms (Great Lakes Dredged Material Testing and Evaluation Manual ) Use sediment chemistry data to model bioaccumulation Measure uptake into tissue in lab

BUILDING STRONG ® Theoretical Bioaccumulation Potential (TBP) Model ► Equilibrium partitioning theory-based algorithm for bioaccumulation of sediment associated non-polar organic contaminants in benthic organisms ► BSAF – Biota-Sediment Accumulation Factor, a measure of bioavailability that relates TOC normalized contaminant concentration in sediment to lipid-normalized contaminant concentration in organisms

BUILDING STRONG ® Biota-Sediment Accumulation Factor Site-specific BSAF values encompass unique bioavailability influencing parameters including contaminant and sediment sorption properties, resulting in variability

BUILDING STRONG ® BSAF Variability Within Ashtabula Harbor  Bioaccumulation testing show BSAFs within the harbor differ significantly - ranging from 0.25 to 2.43  Lower BSAFs ► Outer Harbor and Lower River Channel  Higher BSAFs ► Upper limits of Federal Channel

BUILDING STRONG ® Outer Harbor BSAFs range from 0.25 to 0.51 Lower River BSAFs range from 0.54 to 0.91 Upper River BSAFs range from 1.20 to 2.43 Lake Erie N

BUILDING STRONG ® Factors Affecting Bioavailability  Physical ► Contaminant resuspension ► Concentration gradient  Chemical ► Contaminant sorption/desorption  Biological ► Organism lipid content, size, growth rate, gender, diet, metabolism

BUILDING STRONG ® Coal Dock and Stockpiles

BUILDING STRONG ® Black Carbon  Coal dock and stockpiles are located at the head of the Ashtabula River ► Condensed, aromatic carbonaceous material show strong and nonlinear sorption, leading to lower bioaccumulation than assumed for natural organic matter ► PCBs partition onto black carbon over time

BUILDING STRONG ® Strong BC Influence  Outer Harbor provides an accumulation area for black carbon affected sediments, leading to increased contact time between PCBs and sediment

BUILDING STRONG ® Moderate BC Influence  Lower River sediments reflect differing degrees of contact time between PCBs and sediment ► Riverine and lacustrine current-based coal soot deposition ► More stable sediments at depth show bioavailability similar to the Outer Harbor

BUILDING STRONG ® Negligible BC Influence  Upper River sediments receive less lacustrine current-based coal soot deposition  BSAFs of 1.2 to 2.43 are more reflective of PCB bioavailability associated with a predominance of natural TOC in sediments

BUILDING STRONG ® BSAF Compared to BC Content Moving Upstream from Outer Harbor

BUILDING STRONG ® Potential Factors Influencing BSAF Variability Throughout the Harbor BSAF Variability Organic Matter Characteristics Equilibrium Time with Sediment Sediment Resuspension/ Mixing

BUILDING STRONG ®  PCB Sediment Quality Criterion (SQC) needed to model future dredging restrictions ► Should emphasize a bioaccumulation endpoint ► Should be spatially variable (due to spatial changes in PCB bioavailability) Incorporating Variability into Dredged Material Management

BUILDING STRONG ® Incorporating Variability into Dredged Material Management  Develop SQG based on TBP model and site-specific BSAFs  Use Lake reference area tissue data  SQG predicts bioaccumulation from harbor sediment similar to that expected in the open-lake

BUILDING STRONG ® Ashtabula Harbor Total PCB Sediment Quality Guidelines (ug/kg)

BUILDING STRONG ® Dredged Material Management Considerations  PCB bioavailability is key driver in the characterization and management of Ashtabula Harbor dredged material ► Variability results in different conclusions throughout the harbor ► Bioavailability rather than bulk sediment concentrations dictates suitability determinations

BUILDING STRONG ® Conclusions  PCB contamination in harbors can be assessed based on bioavailability  Bioavailability can be variable; use of default BSAFs may be overly conservative or inaccurate in estimating bioavailability  TBP model with site specific, empirical BSAFs can be utilized in dredged material testing and evaluation

US Army Corps of Engineers BUILDING STRONG ® Questions?...