Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.

Slides:



Advertisements
Similar presentations
1 Brevi Notizie dal Commissioning di CMS… November Global Run (GREN): will last 2 weeks: 26 Nov-7 December (Dec Cosmic Run cancelled, Tracker will probably.
Advertisements

Primo (e ultimo ?) giorno di fascio a LHC Nuovo Logo di CMS valido almeno fino alla prossima primavera:
Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
CMS ECAL Prompt Feedback Group Toyoko J. Orimoto, California Institute of Technology A Brief History: From GRUMM to First BeamThe Future of the ECAL PFG.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
US FAST site EMU CSC test results – a global view from ROOT N. Terentiev (Carnegie Mellon University) Fermilab July 23, 2004.
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
The Large Hadron Collider -Exploring a New Energy Frontier
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
The LHC Machine and Experiments
5-Jan-2010 XEB Meeting at CERN 1 Debriefing from first data: CSC muons n Lessons learned u LHC is a quiet machine  CSC HV can remain on at all times,
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
Status of CMS and the road to first physics results Jordan Nash For the CMS Collaboration – ICFA Seminar – SLAC October 2008.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
The Large Hadron Collider at CERN: Entering a new era in unravelling the mystery of matter, space and time Tsinghua, Beijing April 2009 Felicitas Pauss.
Paolo Rumerio, University of Maryland On Behalf of the CMS Collaboration The LHC and Dark Matter Ann Arbor, Michigan, January 6 th -9 th, 2009 Status of.
Approved Plots from CMS First Beam Runs 2-October-2008.
Toward Assessing HF with Beam Halo Muons & Beam-Gas Events …tuning HF when beam returns excerpts from US-CMS presentation 9/26/08 Michael Schmitt, NWU.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Status of the CSC Track-Finder Darin Acosta University of Florida.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
CMS Muon System Guenakh Mitselmakher University of Florida
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Pierluigi Paolucci - INFN of Napoli 1 Official Muon talks at 2006 Conferences 1.10th Topical Seminar on Innovative Particle and Radiation Detectors – 1-5.
Fermilab Annual DOE Program Review May 16-18, 2005 JF1 CMS M&O at FNAL Jim Freeman US CMS M&O Manager May 17, 2006.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
First CMS Results with LHC Beam
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
Approved Plots from CRAFT
The CMS Experiment at LHC
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Commissioning of the MUON Spectrometers in ATLAS and CMS
The Compact Muon Solenoid Detector
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
CSC Electronics Installation and Commissioning CSCE I&C
Regional Cal. Trigger Milestone: Production & Testing Complete
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
The CMS muon system performance
Equipment Management DB Rack Wizard USC55 Underground Counting Room
Plans for the 2004 CSC Beam Test
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
19-April-05 CSC ME1/1 Meeting
Presentation transcript:

Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов

LHC

Lyn Evans QQBI.27R3 4

CMS Last CMS Disk lowered into the underground cavern 22 Jan ‘08

CMS

End-Cap Muon System 468 CSCs, not counting ME4/2 144 Large CSCs (3.4x1.5 m 2 ): 72 ME2/2 chambers 72 ME3/2 chambers Small CSCs (1.8x1.1 m 2 ): 72 ME1/2 chambers 72 ME1/3 chambers 72 ME1/1 chambers 20 o CSCs (1.9x1.5 m 2 ): 36 ME2/1 chambers 36 ME3/1 chambers 36 ME4/1 chambers Frontend Electronics: 170K Cathode channels 140K Anode channels Trigger&DAQ (on-chamber part) Alignment&Services

CMS Week Sep089 Minus End before Closure

CMS Week Sep0810 Minus End & Closure

CMS Week Sep0811 Final Closure

LHC

30 cathode bytes /BX/chamber 7 anode bytes /BX/chamber bytes /BX/sector 12 bytes /BX/sector 16 bytes /BX/CSC Chambers, On-detector Electronics Global Muon Trigger 700 GByte/s 30 Gbyte/s 640 Mbyte/s Peripheral Crate Track Finder Crate FQPFMP 1 CMS TF Потоки Данных 7 anode bytes /BX/chamber cathode bytes /BX/chamber 1 АLCT - модулиAFE - карты ТМВ- модулиMPC- модуль SP05- модулиMS- модуль TTC- модуль

HV system

Alignment

CMS Week Sep0817 First Events: Beam going through CMS Beam Pickup (ch1) CMS Beam Condition Monitors (ch 3, 4) Point 5 Control Room CMS Centre Meyrin Halo Muons in CSCs and HB

CMS Week Sep0818 First Events: Collimators Closed ~ protons on collimator ~150 m upstream of CMS ECAL- pink; HB,HE - light blue; HO,HF - dark blue; Muon DT - green; Tracker Off

In the Beginning… MTCC “Magnet Test Cosmic Commissioning” Above-ground Magnet at 4T Single trigger sector Summer ‘06Autumn ‘08 CommissioningCRUZETCRAFT Moved underground Magnet off Scale up to full detector operation “Cosmic RUn at ZEro Tesla” Magnet off Full detector “Cosmic Run At Four Tesla” Magnet at 4T Full detector BEAM!

LHC

IGUANA (CRAFT) CMS EMU

IGUANA (Beam Halo) December 7, 2008CMS Week EMU Meeting22 CMS EMU

Infrastructure Voltage Cooling Gas Cabling All of this had to be in place before we could even begin commissioning… Without this, there is no experiment!

CSC Shifts: The People Behind the Data CSCs began official, institution-based shifts on 1 September 2008 Each subdetector manages its own shifts CSC shifts organization: – 3 time slots (day/swing/owl) – 2 people per shift – Institutions assigned a shift slot for 7 days – Shifters are responsible for preparing for their shifts by shadowing the previous week’s shift

Winter Shutdown Estimated time-window: 1 Dec 2008 to 1 May Aim to close CMS in early April (?) and perform cosmic runs at 3.8T Known activities:Open detector Repair of any major fault found during 2008 run