Operations 9 473.31 Fall 2015 Bruce Duggan Providence University College.

Slides:



Advertisements
Similar presentations
PowerPoint Presentation
Advertisements

Strategic Decisions (Part II)
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
IES 371 Engineering Management Chapter 14: Aggregate Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
Aggregate Planning 13 © 2011 Pearson Education, Inc. publishing as Prentice Hall.
PRODUCTION AND OPERATIONS MANAGEMENT
OPSM 301 Operations Management
19–1. 19–2 Chapter Nineteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
ISQA 459 Sales & Operations Planning
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Manufacturing’s Objectives
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Aggregate Planning Operations.
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
Strategic Capacity Planning Defined
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 14 Aggregate Sales and Operations Planning.
Operations Planning Horizons
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 20 1.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Aggregate Planning.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Aggregate Planning This Chapter explores:
Operations Management Aggregate Planning
© The McGraw-Hill Companies, Inc., DOM 511: Operations Mgt Practice Aggregate Planning.
Operations Management For Competitive Advantage 1 Aggregate Planning Operations Management For Competitive Advantage Chapter 12.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Sales and Operations Planning CHAPTER 11.
1 Chapter 13 Production Planning Supplemental Slides.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
Chapter 10 Sales and Operations Planning (Aggregate Planning)
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
© 2007 Pearson Education Sales and Operations Planning.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Chapter 12 With Woodruff Modification Sales and Operations Planning – Aggregate Planning Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights.
© The McGraw-Hill Companies, Inc., OUTPUT PLANNING PROCESS Aggregate Planning.
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Chapter 14 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Beni Asllani University of Tennessee at Chattanooga
Chapter 8 Aggregate Planning in the Supply Chain
Dr Sh Salleh bin Sh Ahmad
Manufacturing’s Objectives
Presentation transcript:

Operations Fall 2015 Bruce Duggan Providence University College

Summary Sales and operations planning and the aggregate plan translate corporate strategic plans into broad categories of workforce size, inventory quantity, and production levels. Demand variations are a fact of life, so the planning system must include sufficient flexibility to cope with such variations. 6-20

Know The Answers To These Questions 1.What exactly is sales and operations planning? 2.What is the difference between the chase, variable hours, and level production planning strategies? 3.What are some things that can be done to avoid laying off full-time employees when demand fluctuates? 4.How is aggregate planning different for services- versus goods- producing organizations? 6-21

Sales and Operations Planning Sales and operations planning the process that helps companies keep demand and supply in balance requires an integrated effort with cooperation from o sales o distribution and logistics o operations o finance o product development

Sales and Operations Planning Long-range planning done annually, focusing on a horizon greater than one year. Intermediate-range planning usually covers a period from 3 to 18 months with weekly, monthly, or quarterly time increments Short-range planning covers a period from 1 day to 6 months with daily or weekly time increments

Sales and Operations Planning

Aggregate Operations Plan translates annual and quarterly business plans into labour and production plans for the intermediate term

Aggregate Operations Plan purpose: to specify the optimal combination of: o production rate :  # of units completed per unit of time. o workforce level  # of people needed for production production = production rate x workforce level inventory on hand unused inventory carried forward from previous period

Production Planning Environment 9-8

Production Planning Strategies 1.chase strategy matches the production rate to the order rate by hiring and laying off employees as the order rate varies. vary workforce size to meet demand 2.stable workforce with variable work hours varies the output by varying the number of hours worked through flexible work schedules or overtime. work overtime and part-time

Production Planning Strategies 3.level strategy maintains a stable workforce at a constant output rate shortages & surpluses absorbed by fluctuating inventory levels 4.subcontracting similar to chase strategy, but hiring and laying off are translated into subcontracting and not subcontracting subcontract to accommodate demand fluctuations

Production Planning Strategies pure strategy a production plan when just 1 of the above strategies are used to absorb demand fluctuations mixed strategy a production plan that combines two or more strategies available for meeting demand

Aggregate Planning Techniques cut and try approach costing out various production planning alternatives selecting the one that is best sophisticated approaches involve linear programming and/or simulation

A Cut-and-Try Example

Formulate alternative production plans for JCBS Company: Plan 1: o produce to exact monthly production requirements o use regular 8-hour day by varying workforce size Plan 2: o produce to meet expected average demand over the next six months o maintain constant workforce

A Cut-and-Try Example Formulate alternative production plans for JCBS Company: Plan 3: o produce to meet minimum expected deman o using a constant workforce on regular time o subcontract out to meet additional output requirements Plan 4: o produce to meet expected demand for all but the first two months o use a constant workforce on regular time o use overtime to meet additional output requirements

A Cut-and-Try Example

Level Scheduling A level schedule holds production constant over a period of time. for each period, it keeps the workforce constant and inventory low depends on demand to pull products through backbone of JIT production o “Just In Time”

Level Scheduling Advantages advantages entire system can be planned to minimize inventory and work-in-process. product modifications are up-to-date because of low amount of work-in- process. a smooth flow throughout the production system purchased items from vendors can be delivered when needed, and, in fact, often to directly to the production line

Aggregate Planning in Practice

Aggregate Planning Applied to Services The City of Calgary's Parks and Recreation Department

Aggregate Planning Applied to Services

End of Chapter 9