IBIS Specification Direction Michael Mirmak Intel Corp. Chair, EIA IBIS Open Forum.

Slides:



Advertisements
Similar presentations
FpML Versioning An AWG Discusion Document. Namespace URIs & Versions An XML parser locates the schema for a document based on its namespace URI To be.
Advertisements

E-Strategy Open House, January Kuali Student CDM Presentation.
Art of Delegation in a USPS Setting Page 1 Accountable Inform Responsible Consult.
Data Structures: A Pseudocode Approach with C 1 Chapter 5 Contd... Objectives Explain the design, use, and operation of a linear list Implement a linear.
Introduction to Databases
IEC Substation Configuration Language and Its Impact on the Engineering of Distribution Substation Systems Notes Dr. Alexander Apostolov.
1 Introducing IBIS Michael Mirmak Chair, IBIS Open Forum IEEE DASC Meeting October 6, 2011.
Recall The Team Skills 1. Analyzing the Problem 2. Understanding User and Stakeholder Needs 3. Defining the System 4. Managing Scope 5. Refining the System.
Design Flexibility Interactive Report Viewing.
IBIS Interconnect BIRD Draft 3 Walter Katz Signal Integrity Software, Inc. IBIS Summit, DesignCon Santa Clara, CA January 30, 2015.
ISO Standards: Status, Tools, Implementations, and Training Standards/David Danko.
TM Freescale™ and the Freescale logo are trademarks of Freescale Semiconductor, Inc. All other product or service names are the property of their respective.
Copyright GoldSim Technology Group LLC, 2005 Slide 1 Introduction to the GoldSim Reliability Module GoldSim Technology Group Issaquah, Washington USA.
01/30/04 *Other brands and names are the property of their respective owners Page 1 Futures Subcommittee Proposed “New” Futures Subcommittee To create,
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
© 2007 Cisco Systems, Inc. All rights reserved. 1 IBIS Quality Review A status review of the IBIS Quality specification Mike LaBonte, Cisco Systems.
Personalizing the web for multilingual web sources Anil Goud V Lalith Krishna L Dinesh Kumar D.R.
WebDAV Issues Munich IETF August 11, Property URL encoding At present, spec. allows encoding of the name of a property so it can be appended to.
Student Learning Objectives Assessment Guidance for LEAs Student Learning Objectives Training Series.
IMIC DISCUSSION Bob Ross Interconnectix Business Unit Mentor Graphics Corporation IBIS Summit Meeting, San Diego, CA December 7, 1998.
03/05/04 *Other brands and names are the property of their respective owners Intel Confidential Page 1 Original Cookbook Objectives Triage to find keywords.
Mind Mapping Mind mapping, whole brain note taking, uses both sides of your brain to study subjects usually only studied with your left brain. Using both.
IBIS-AMI and Direction Indication February 17, 2015 Michael Mirmak.
Signal Integrity Software, Inc. IBIS Advanced Technology Modeling Group (IBIS-ATM) * Status Report Todd Westerhoff, SiSoft (Chief Troublemaker) DesignCon.
Summary of Timeline Discussion: The three timeline options in the following slides reflect opportunities to evaluate progress on the draft and potential.
11/09/04 *Other brands and names are the property of their respective owners Page 1 The IBIS Specification and IEEE DASC Michael.
The Patient Pro Main Form This is the form (window) from which you access all of Patient Pro’s features, and from which you close the program. The message.
Simulation Vendors Ansoft Cadence HyperLynx / Pads Innoveda Mentor Connector Companies AMP / Tyco Berg / FCI Molex Teradyne End Users EMC IBM Compaq.
IBIS Specification Direction Michael Mirmak Intel Corp. Chair, EIA IBIS Open Forum.
Copyright © 2006, Intel Corporation. All rights reserved. Intel® Teach Program Thinking with Technology Course © 2007 Intel Corporation. All rights reserved.
Lead from the front Texas Nodal 1 Texas Nodal Critical Path Update TPTF Date xxx.
Intel Confidential IBIS & ICM Interfacing: A New Proposal Michael Mirmak Signal Integrity Engineering Intel Corp. Chair,
IBIS & ICM Interfacing: Three Options Michael Mirmak Intel Corporation December 4, 2007.
I N V E N T I V EI N V E N T I V E Algorithmic Modeling (AMI) Parameter Syntax Discussion August 14, 2007.
Quick Failover Algorithm in SCTP draft-ietf-tsvwg-sctp-failover Y. Nishida, P. Natarajan, A. Caro, P. Amer, K. Nielsen IETF92, Dallas.
BEHAVIOR DRIVEN TEST DEVELOPMENT Specification by Example.
User defined measurements and test loads in IBIS Arpad Muranyi Signal Integrity Engineering Intel Corporation IBIS Cookbook / Futures.
06/02/04 *Other brands and names are the property of their respective owners Page 1 New IBIS Cookbook 1.0 Introduction.
Modeling Formats and Procedures at Intel Michael Mirmak Intel Corp. JEITA IBIS Conference March 24, 2005 マイケル マ一マク インテル コ一ポレ一ション.
1 MSTE Visual SourceSafe For more information, see:
Module 9 User Profiles and Social Networking. Module Overview Configuring User Profiles Implementing SharePoint 2010 Social Networking Features.
HARQ Processing Time (AWD ) Document Number: IEEE C802.16m-09/1459 Date Submitted: Source: Aran
Software Project Management Iterative Model & Spiral Model.
Win with Technology Leadership. Leap Ahead IBIS Enhancement Priorities: Differential Pins and Measurements as an Example Michael Mirmak Intel Corp. Chair,
VERSION 12.5 HIHGLIGHTS Lead Developer - Rob Nikkel.
IBIS FUTURES COMMITTEE MULTILINGUAL MODEL: [Circuit Call] REFERENCES John Angulo 8 th April 2004.
A Design Flow for Optimal Circuit Design Using Resource and Timing Estimation Farnaz Gharibian and Kenneth B. Kent {f.gharibian, unb.ca Faculty.
Why Cryptosystems Fail R. Anderson, Proceedings of the 1st ACM Conference on Computer and Communications Security, 1993 Reviewed by Yunkyu Sung
10/07/04 *Other brands and names are the property of their respective owners Page 1 IBIS & ICM Interfacing Options Alternative.
Fountain Incident Management (FIM)
IBIS & ICM Interfacing: Simple Link Michael Mirmak September 21, 2005.
IBIS Status and Future Direction Michael Mirmak Intel Corp. Chair, EIA IBIS Open Forum マイケル マ一マク インテル コ一ポレ一 ション 会長,アイビス JEITA IBIS Conference March 24,
Chapter 7 Preliminary Construction The broad scope of implementation Preliminary construction in the SDLC Preliminary construction activities Preliminary.
09/27/04 *Other brands and names are the property of their respective owners Page 1 Objective: match FD response of IBIS to transistor buffer IBIS and.
Confidential Information Notice: This document and the information it contains are the exclusive property of Healthcare Regional Marketing LLC (HRM) and.
References in IBIS Bob Ross, Teraspeed Labs IBIS ATM Meeting January 12, 2016 Copyright 2016 Teraspeed Labs 1.
1 MAPPS Software Review Board MAPPS SRB – part II ESAC, Madrid, Spain 3 rd June 2016 ESA-ESTEC - “MAPPS Software Review Board” – MAPPS SRB - Part II, ESAC,
V7.0 Linked BIRDs Bob Ross IBIS Editorial Task Group April 7, 2017
Commercial Operations Sub-Committee Update to RMS
GST Implementation in Miracle
Latches. Flip-Flops. Remember the state. Bistable elements.
REGISTER TRANSFER LANGUAGE AND DESIGN OF CONTROL UNIT
Logical architecture refinement
Simulation of computer system
IBIS Specification Roadmap
WordPress in Multiple Languages
New IBIS Cookbook 1.0 Introduction 2.0 Pre-Modeling Steps
Include your photo, your name, your company name and a logo
GST Implementation in Miracle
Presentation transcript:

IBIS Specification Direction Michael Mirmak Intel Corp. Chair, EIA IBIS Open Forum

10/25/05 *Other brands and names are the property of their respective owners Page 2 IBIS Future Direction The Futures Team needs to recommend a specification direction to the Open Forum Key decisions include Which features should be included in which spec. versions? Which versions should be standardized? Which versions require new parser development?

10/25/05 *Other brands and names are the property of their respective owners Page 3 IBIS BIRD Status Specification Changes Approved BIRD99.1 – AMS Language Versions BIRD96 – [Model Spec] and [Receiver Thresholds] Ordering BIRD95.6 – Power Integrity Analysis using IBIS BIRD94.2 – Clarifications on [Diff Pin] parameters BIRD93.1 – Model and Signal Name Limit Extension BIRD92.1 – Model Termination and Series Elements under [Model] BIRD91.3 – Multi-lingual Logic States Clarification BIRD90.2 – Multiple A_to_D Subparameters Clarification* BIRD89.1 – Keyword Hierarchy Tree BIRD88.3 – Driver Schedule Initialization BIRD87 – Series Pin Mapping Clarifications BIRD74.6 – EMI Parameters Specification Changes Under Discussion BIRD97.2/98 - Gate Modulation Effect ICM-IBIS Linking [External Model] under [Circuit Call] Verilog-A under Multi-lingual extensions User-Defined Measurements Parser change required

10/25/05 *Other brands and names are the property of their respective owners Page 4 Potential Spec Releases 1. IBIS 4.2 then IBIS 5.0 IBIS 4.2 is “cleanup” featuring clarification BIRDs only IBIS 5.0 includes all BIRDs where parser changes required IBIS 5.0 delayed to include BIRDs still under discussion 2. IBIS 4.2, IBIS 4.x… IBIS 5.0 IBIS x are incremental additions of BIRDs BIRD93 and BIRD95 are included in incremental 4.x Standardize on IBIS 4.x; new parsers needed for some 4.x BIRDs still under discussion delayed until IBIS IBIS 5.0 immediately IBIS 5.0 contains ALL pending BIRDs Hold 5.0 release until all BIRDs under discussion completed Standardize on 5.0 or even 5.x

10/25/05 *Other brands and names are the property of their respective owners Page 5 Pros and Cons 1. IBIS 4.2 then IBIS 5.0 Pro: Quick release and standardization on IBIS 4.2 Pro: Parser development paid with new 5.0 licenses Con: IBIS 5.0 development will take significant time Delay of new keywords, features Do we consider re-architecting IBIS in 5.0? 2. IBIS 4.2, IBIS 4.x… IBIS 5.0 Pro: High-priority changes can be included quickly For example, BIRD95.6 Con: No money to support new parser before IBIS 5.0 immediately Pro: Parser funds become available quickly Con: IBIS 5.0 development will take significant time Con: Standardization “stuck” on 3.2 before 5.0 No standard for AMS+IBIS for the next 2+ years

10/25/05 *Other brands and names are the property of their respective owners Page 6 MM’s Personal Recommendation Prepare and Release IBIS 4.2 then IBIS 5.0 Implement IBIS 4.2 immediately, with “cleanup” BIRDs only Standardize IBIS 4.2 immediately on approval Include BIRD74, BIRD88, BIRD93, BIRD95 in IBIS 5.0 Key Questions Remaining Delay IBIS 5.0 for BIRD97/98? (recommend yes) Delay IBIS 5.0 for ICM-IBIS Linking? (recommend yes) One-to-one links in short term ONLY More complex links in 5.x Delay IBIS 5.0 for [Ext. Model]/[CC]? (recommend yes) Delay IBIS 5.0 for Verilog-A? (recommending yes) Delay IBIS 5.0 for user-defined measures? (recommend no) All 5.0 features above should be relatively easily closed