EGEE is a project funded by the European Union under contract IST-2003-508833 Service Activity 1 M. Cristina Vistoli ROC Coordinator All activity meeting,

Slides:



Advertisements
Similar presentations
Deployment Team. Deployment –Central Management Team Takes care of the deployment of the release, certificates the sites and manages the grid services.
Advertisements

INFN Testbed status report L. Gaido WP6 meeting CERN - October 30th, 2002.
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
EGEE is a project funded by the European Union under contract IST SA1 and NA3 Alistair Mills Grid Deployment Group +41.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Pilot Test-bed Operations and Support Work.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
EGEE is a project funded by the European Union under contract IST The way ahead Alistair Mills Grid Deployment Group
EMI INFSO-RI EMI SA2 Report Quality Assurance Alberto Aimar (CERN) SA2 WP Leader.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
UK DTI Mission – 29 June Grid Deployment Ian Bird LCG Deployment Area Manager & EGEE Operations Manager IT Department, CERN Presentation to UK.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
EGEE is a project funded by the European Union under contract IST Plan for ROC verification Hélène Cordier - Alistair Mills IN2P3, CRNS, France.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
EGEE is a project funded by the European Union under contract INFSO-RI Summary M-E Bégin & B. Jones EGEE Technical Coordination All Activity Meeting,
EGEE is a project funded by the European Union under contract IST JRA1-SA1 requirement gathering Maite Barroso JRA1 Integration and Testing.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST User support in EGEE Alistair Mills Torsten Antoni EGEE-3 Conference 20 April.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
EGEE is a project funded by the European Union under contract IST Support Operation Challenge – 1 SOC-1 Alistair Mills Torsten Antoni ARM-4,
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
EGEE is a project funded by the European Union under contract IST Summary Bob Jones Technical Director AA Meeting, CERN, 18th June
EGEE is a project funded by the European Union under contract IST EGEE Services Ian Bird SA1 Manager Cork Meeting, April
Ian Bird LCG Deployment Area Manager & EGEE Operations Manager IT Department, CERN Presentation to HEPiX 22 nd October 2004 LCG Operations.
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The EGEE User Support Infrastructure Torsten.
NA4 all activity meeting V. Breton on behalf of NA4.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Antonio Retico CERN, Geneva 19 Jan 2009 PPS in EGEEIII: Some Points.
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
EGEE is a project funded by the European Union under contract IST Support in EGEE Ron Trompert SARA NEROC Meeting, 28 October
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
HEP Applications within EGEE - an overview and relations with GAG F Harris (Oxford/CERN) EGEE is proposed as a project funded by the European Union under.
Функции и роль Российского Базового Центра Grid- инфраструктуры в рамках проекта EGEE. А.П.Крюков, А.П.Демичев, Л.В.Шамардин, НИИЯФ МГУ А.Крюков, А.Демичев,
INFSO-RI Enabling Grids for E-sciencE An overview of EGEE operations & support procedures Jules Wolfrat SARA.
Certification and test activity ROC/CIC Deployment Team EGEE-SA1 Conference, CNAF – Bologna 05 Oct
INFSO-RI Enabling Grids for E-sciencE RDIG - Russia in EGEE Viatcheslav Ilyin RDIG Consortium Director, EGEE PMB SINP MSU (48),
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
SA2 : Network Resource Provision All Activity Meeting – 17 March SA2 Execution Plan for the first year Jean-Paul Gautier SA2 Manager CNRS/UREC.
NA4 all activity meeting V. Breton on behalf of NA4.
EGEE is a project funded by the European Union under contract IST Task Breakdown – SA1 Alistair Mills SA1 - CERN SA1 Meeting Cork, 20 April.
INFSO-RI Enabling Grids for E-sciencE gLite Certification and Deployment Process Markus Schulz, SA1, CERN EGEE 1 st EU Review 9-11/02/2005.
M. Cristina Vistoli EGEE SA1 Organization Meeting EGEE is proposed as a project funded by the European Union under contract IST Regional Operations.
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
Operations model Maite Barroso, CERN On behalf of EGEE operations WLCG Service Workshop 11/02/2006.
INFN GRID Production Infrastructure Status and operation organization Cristina Vistoli Cnaf GDB Bologna, 11/10/2005.
INFSO-RI Enabling Grids for E-sciencE Operations Parallel Session Summary Markus Schulz CERN IT/GD Joint OSG and EGEE Operations.
WP3 EGEE Steve Fisher / RAL 14/1/2004. WP3 Steve Fisher/RAL - 14/1/2004EGEE2 Credits My slides have been stolen from many sources including: –Fabrizio.
EGEE is a project funded by the European Union under contract IST New VO Integration Fabio Hernandez ROC Managers Workshop,
EGEE is a project funded by the European Union under contract IST Service Activity 1 M.Cristina Vistoli ROC Coordinator All activity meeting,
EMI INFSO-RI Testbed for project continuous Integration Danilo Dongiovanni (INFN-CNAF) -SA2.6 Task Leader Jozef Cernak(UPJŠ, Kosice, Slovakia)
II EGEE conference Den Haag November, ROC-CIC status in Italy
EGEE is a project funded by the European Union under contract IST Compchem VO's user support EGEE Workshop for VOs Karlsruhe (Germany) March.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Grid is a Bazaar of Resource Providers and.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
INFSO-RI Enabling Grids for E-sciencE GOCDB2 Matt Thorpe / Philippa Strange RAL, UK.
Bob Jones EGEE Technical Director
Regional Operations Centres Core infrastructure Centres
EGEE is a project funded by the European Union
Support Operation Challenge – 1 SOC-1 Alistair Mills Torsten Antoni
EGEE Middleware Activities Overview
SA1 Execution Plan Status and Issues
Ian Bird GDB Meeting CERN 9 September 2003
EGEE/LCG Operation Workshop
INFN – GRID status and activities
Presentation transcript:

EGEE is a project funded by the European Union under contract IST Service Activity 1 M. Cristina Vistoli ROC Coordinator All activity meeting, 18 june

All Activities Meeting, 18 June Contents Summary of work accomplished since First EGEE Conference in Cork State of their deliverables and milestones for M3 State of Execution Plan Overview of current and planned WBSs Overview of products: Deliverables Risk analysis Issues related to other activities Highest priority steps to take between now and the 2nd project conference in Den Haag Hiring status and manpower levels

All Activities Meeting, 18 June Work accomplished Summary of work accomplished since First EGEE Conference in Cork  Clearly defined Roles and Responsibilities of ROC and CIC  ROC Coordination meeting in Milan: Start technical workshop to exchange working experience and technical procedures between ROCs UK: monitoring and accounting tools IT: deployment procedures FR: adding new VO DE: user and operation support systems SEE: Services and testbeds  Discussion to define procedure to integrate National Grids to EGEE

All Activities Meeting, 18 June Work Accomplished:ROC ROC Responsibilities:  Acceptance testing (certification) of the new middleware on a variety of platforms before deployment  Deployment of middleware releases + coordination  SLA negotiation  Development of procedures and capabilities to operate the resources  First-line support in resolving any operational problems originating at the Resource Centres.  First-line user support

All Activities Meeting, 18 June ROC Roles  Middleware release distribution inside the region taking care of integration of ‘Local’ VO  Bring new resources into the infrastructure and support their operation.  Coordination of integration of national grid infrastructures and how they integrate into EGEE.  Source of expert advice and technical support in deploying and operating the middleware in the RCs.  Participate in validating new middleware releases. Organise and operate certification testbeds within the region  Provide resources for pre-production service.  Port middleware to specific regional needs

All Activities Meeting, 18 June ROC management roles Coordinate the operational management RCs Collect and Monitor Service Level Agreements (SLA) Negotiate application access to resources within the region. Organise CAs within the region. Coordinate activity reporting to SA1 management.

All Activities Meeting, 18 June CIC roles Operate core services  VO-specific services Database services for replica services for a VO (or set of VOs) Other database services Resource Brokers, User Interface, Information services.  General GRID Services covering whole EGEE scope  Collaborate with ROC to operate core services for region specific VO and National Grids Development of new management tools Act as GOC  Proactively monitor core services and provide support to the Regional Operations Centres  Deploy, operate and monitor grid-wide and Virtual Organization-specific grid services  Monitor infrastructure components and services  Publish usage figures and accounting  Performing monitoring and troubleshooting. Second-level support for ROCs Produce Project Deliverables

All Activities Meeting, 18 June Deliverable list: products MonthDeliverable / Milestone ItemLead M03DSA1.1 Detailed execution plan for first 15 months of infrastructure operation CERN M06MSA1.1 Initial pilot production grid operational M06DSA1.2 Release notes corresponding to the initial pilot Grid infrastructure operational INFN M09DSA1.3 Accounting and reporting web site publicly available CCLRC M09MSA1.2 First review M12DSA1.4 Assessment of initial infrastructure operation and plan for next 12 months IN2P3 M14DSA1.5 First release of EGEE Infrastructure Planning Guide (“cook-book”), CERN M14MSA1.3 Full production grid infrastructure operational M14DSA1.6 Release notes corresponding to the full production Grid infrastructure operational CCLRC M18MSA1.4 Second review M22DSA1.7 Updated EGEE Infrastructure Planning Guide CERN M24DSA1.8 Assessment of production infrastructure operation and outline of how sustained operation of EGEE might be addressed. IN2P3 M24MSA1.5 Third review and expanded production grid operational M24DSA1.9 Release notes corresponding to expanded production Grid infrastructure operational INFN

All Activities Meeting, 18 June Deployment status on going: Production service-increasing number of resource centers based on LCG-2 Germany: FZH, Karlsruhe, Wuppertal, CSCS….. Italy: CNAF, LNL, Milano, Torino, Roma1 and INFN-GRID sites: Roma2, Padova, Trieste, Napoli, Bari, Catania, Bologna, Ferrara, Lecce, Perugia, Pavia, Pisa… UK/Ireland: RAL, UCL, Manchester, ScotGrid, GridPP, Imperial college, CAMBRIDGE, LANCS, QMUL, RALPP, ScotGRID, UCL-HEP, University of Sheffield and UK-NGS sites France: Lyon, Clermont SEE: HellasGrid-GRnet, Wiezman (Israel)… CE: Cyfronet-Cracow, Cesnet, Prague, Hep-At, Budapest… SW: PIC,IFAE, Ciemat, IFIC, Valencia, Barcelona, IFCA, LIP/Pt NE: Nikhef, Sara RU: Sinp

All Activities Meeting, 18 June deployment of non-HEP applications Activity already in place in several national Grids At EGEE level started with BIOMED VO VO server configured in IN2P3-Lyon EGEE-Resource broker in INFN-CNAF Resource centers provided by France, Clermont Lyon ROC are investigating possibility to have more resource centers availble to run Biomed Application

All Activities Meeting, 18 June Services and testbeds M/W Certification testbed:  The certification testbed is currently at CERN part of CERN OMC team.  It is expected that this testbed extended in a dynamic way to include testbed and verification activities coordinated in each region through the ROCs.  This activites includes certification of improvement to the current EGEE-0/LCG-2  ROCs should provide these resources  Express interest in the certification activity, up to now, IT and SEE ROC Need resources for porting  E.g. If a region has particular need – port to their favourite OS and certify middleware

All Activities Meeting, 18 June Pre-production service In parallel with the production service, there will be a pre-production service in operation. This service will run the next version of the middleware It will start with running LCG-2, waiting for JRA1 components ROCs should provide resources for this services. Not yet defined ROCs commitment to take part of Pre-production services Backwards compatibility is a general requirements ROCs requirements on hw, sw, grid expertise for the candidate RC Experienced users need to be involved as well Nick Thackray (CERN-OMC) will coordinate the service and send to ROCs execution plan

All Activities Meeting, 18 June M3 Deliverable: Execution Plan(1) Made of  General series documents  Federation series documents: Defined table of content Received most of the contributions Delay from the federation with several countries involved with different expertise Progress followed in the weekly phone meetings

All Activities Meeting, 18 June M3 Deliverable: Execution Plan(2) Prepared the core of the plan Prepared the individual federation plans Prepared the training plans Prepared the risk assessment and management plans Prepared a scope document with key dates for delivery Held a kick off meeting with the moderation team Next stage is integration, and further detailed information Plan will enter moderation phase on 1st July Plan will be ready by 31st July

All Activities Meeting, 18 June M3 Deliverable: Execution Plan(3) Successes from the preparation of the execution plan: - Good co-operation between the ROCs - Good teamwork - Given us a chance to know one another better Concerns for the execution plan: - The process for the moderation takes 1 month - Most of the work of the moderation process occurs in the first two weeks - The moderation time occurs at the beginning of the holiday season - If we run into any serious moderation objections either: o the plan will be late in delivery o the concerns of the moderator will be shelved to avoid delay

All Activities Meeting, 18 June M3 Deliverable: Risk Assessment - Uses the QinetiQ methodology - Conducted with the ROC managers in May - Asks 13 objective questions, and accepts one of five answers with scores from 2^0.. 2^4 - Answers multiplied by a read-only weighting factor for its importance - Sum of the product of the scores with the weighting factor give overall risk score - Biggest risk areas are (all of similar importance): 1 Total cost of the project - this project is bigger than usual for ROCs 2 Project team diversity - all of the ROCs are dealing with many RCs 3 Impact of failure - impact on reputation of ROC for failure 4 Clarity of objectives – what are they being asked to do 5 Complexity of reporting procedures – how complex and frequent is the reporting - Conclusion o We can do little about risk areas 1-3 o We can do something about risk areas 4-5

All Activities Meeting, 18 June WBS

All Activities Meeting, 18 June WBS

All Activities Meeting, 18 June Highest priority steps  Simplified procedure for bringing in the infrastructure: new VO, sites, and national grids  Build Operating ROCs and CIC Define and agree on a support system which incorporates both user and operation support with common user interface Dispatching ticketing system to ROCs able to collect up to date info from RC, incorporating regional defined support structure A dedicated team with representatives from each ROC has been defined Define the meaning of ‘SLA’ for Grid Services and resource centers and develop management tools to measure and report Define the system architecture in term of Grid services (CE,SE, RB, etc) able to fulfill VO requirements

All Activities Meeting, 18 June Manpower level and hiring status CERN:  OMC and CIC: 38 FTE – 8 Funded based on LCG project operation teams IT:  Distributed ROC and CIC 33 FTE 44 people - partners INFN, UniLE, UniNa, UniCz,Enea, hiring plan almost complete NE  Distributed ROC 10 FTE 21 people, deviation 2.5, Partners: Nikhef, Sara, PDC, HPD2N, NSC FR  Distributed ROC and CIC: 26 FTE 40 people, 4 partners CNRS, CGG, CSSI ECP UK/Ireland  Distributedd ROC and CIC: UK 17 FTE 21 people providing 17 FTE against a plan of 19 in SA1 (all funded) Ireland 2 FTE 2-3 people against a plan of 2

All Activities Meeting, 18 June Manpower level and hiring status DE/CH:  Distributed ROC 19 FTE, 22 persons CE  Distributed ROC 2FTE 6 people Cyfronet Russia  ROC 7,6 FTE 16 people - partners IHEP, SINP-MSU, JINR, PNPI, RRC KI, ITEP  CIC 4,5 FTE 7 people - partners SINP-MSU, JINR, KIAM RAS, RRC KI SW SEE  Distributed ROC: 18 FTE 58 people – parteners: GRNET, Israel, Bulgaria, Cyprus