Overview and Status of the ATLAS Pixel Detector Claudia Gemme, CERN/INFN-Genova on behalf of the ATLAS Pixel Community 10th ICATPP Conference, Como, Oct.

Slides:



Advertisements
Similar presentations
Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
Advertisements

The ATLAS Pixel Detector
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
MWPC Commissioning: A Status Report What the MWPC’s do and how Data taking Jan-Feb 2000 Results from the Analysis.
The ATLAS Pixel Detector - Introduction -
May 14, 2015Pavel Řezníček, IPNP Charles University, Prague1 Tests of ATLAS strip detector modules: beam, source, G4 simulations.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
ATLAS SCT module performance: beam test results José E. García.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
STS Simulations Anna Kotynia 15 th CBM Collaboration Meeting April , 2010, GSI 1.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
The ATLAS Pixel Detector - Running Experience – Markus Keil – University of Geneva on behalf of the ATLAS Collaboration Vertex 2009 Putten, Netherlands,
STATUS OF VCSEL BASED OPTO-LINKS JOSHUA MOSS, JENS DOPKE AUGUST 19, 2010 On-going analysis for the on-detector Pixel VCSELs TEMPERATURE MEASUREMENTS OPTICAL.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
1 Digital Active Pixel Array (DAPA) for Vertex and Tracking Silicon Systems PROJECT G.Bashindzhagyan 1, N.Korotkova 1, R.Roeder 2, Chr.Schmidt 3, N.Sinev.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 A brief overview of the ATLAS Pixel Detector.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
Operation of the CMS Tracker at the Large Hadron Collider
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
Michał Dwużnik, for the SCT collaboration
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
CERN, CT Workshop, ID Week, July 2 nd, 2007 Problems and solutions during the integration. Unconformities in the detector Claudia Gemme, CERN - INFN Genova.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
Peter Fischer, Bonn UniversityPixel 2000, Genova, June 5-8, 2000 Pixel electronics for ATLAS Peter Fischer, Bonn university for the ATLAS pixel collaboration.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Nick Sinev, ALCPG March 2011, Eugene, Oregon Investigation into Vertex Detector Resolution N. B. Sinev University of Oregon, Eugene.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
CERN, CT Workshop, ID Week, July 2 nd, 2007 Connectivity Workshop Conclusions: Lessons learned C12 Test Next future Claudia Gemme, CERN - INFN Genova Connectivity.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Operation & Performance of the ATLAS SemiConductor Tracker Dr. Petra Haefner Max-Planck-Institut für Physik.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
`` ATLAS inner detector JV Els KoffemanAtlas - Inner Detector1 Tracking in solenoid 2 Tesla field – 3 pixel layers with 50 um x 400 um cells – 4.
TRTViewer: the ATLAS TRT detector monitoring and diagnostics tool 4 th Workshop on Advanced Transition Radiation Detectors for Accelerator and Space Applications.
Pixel Sensors for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Technical Design for the Mu3e Detector
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Overview and status of the ATLAS Pixel Detector Attilio Andreazza Università di Milano and I.N.F.N. for the ATLAS Pixel Collaboration Layout of the ATLAS.
Integration and alignment of ATLAS SCT
5% The CMS all silicon tracker simulation
ATLAS Silicon Tracker commissioning
Niels Tuning (Outer Tracker Group LHCb)
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Operational Experience with the ATLAS Pixel Detector at the LHC
The CMS Tracking Readout and Front End Driver Testing
Setup for testing LHCb Inner Tracker Modules
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Overview and Status of the ATLAS Pixel Detector Claudia Gemme, CERN/INFN-Genova on behalf of the ATLAS Pixel Community 10th ICATPP Conference, Como, Oct 8 th 2007

ATLAS: A Toroidal LHC ApparatuS

The ATLAS Pixel Detector The Pixel Detector is the innermost part of the tracking system for the ATLAS experiment. It consists of three barrel layers and six disks, covering with three precise measurement points the region up to  =2.5. Innermost layer (B-layer) at R=5 cm. A total of 80 million channels and a sensitive area of 1.6 m 2. Modules will operate in an environment temperature below 0ºC and inside a 2T solenoidal magnetic field. Components have been tested to be rad-hard up to: NIEL > MeV n/cm 2 dose > 500 kGy B-Layer Layer-1 Disks Beampipe

Module concept Modules are the building block of the Pixel Detector. There will be 1456 barrel modules and 288 forward modules. Each module has pixels in an area of ~10 cm 2 Module are placed on cooling/support structure (staves in the barrel, sectors for the endcaps). Modules components: Sensors are n + pixels on n substrate, 60.8mm×16.4 mm × 250  m active silicon volume. Pixel size 50  m (R  ) × 400  m (  ). Bump bonds between Si sensor and 16 front-end electronics chips (both SnPb and In bumps used). Module Controller Chip on flex hybrid to perform distribution of commands and event building Micro-cable (~1m) connected to service panel (PP0)

Front-End Electronics I Each FE connected to 2880 pixels FE receive commands, clock, Level-1 trigger from controller chip at 40 Mbit/s rate Charge injection circuitry allows to measure/calibrate relevant parameters. Pixel-level control logic (14-bits) to adjust e.g. Threshold and Time-over-Threshold (ToT). Each channel can be individually tuned, to get uniform response: threshold: 4000 e - threshold dispersion: e - noise: e -

Ideal pulse shape is almost triangular with fast rise and slow return to baseline. Timing of this signal is critical 1. Timewalk: low pulse height signals arrive later than high pulse height; if delay is too high, the pulse is associated to the subsequent bunch crossing. uniform efficiency requires good synchronization. 2. Time over Threshold (ToT) used to interpolate position of multi-hit clusters as a function of  =Q 2 /(Q 1 +Q 2 ) Time over Threshold for a m.i.p. tuned to 30 clock cycles timewalk ToT 20 ns In-time threshold 1 m.i.p. Front-End Electronics II

Service Panels and Optoboard 272 Optoboards: Data-out: 8-VCSEL array (40 to 160 Mbit/s) to off-detector electronics (RODs) Data-in: PiN diode receives commands, clock, Lv1 Service panels bring services out of inner detector volume (~7m) Active part: optoboards that provide electrical/optical data conversion

8 Commissioning of End-Cap (Fall 06) In fall 2006 – before final detector integration: performed a 10% system test One end-cap (144 modules) Scintillators for cosmics trigger One prototype service panel Services close to final version operation at -10 ºC, using evaporative cooling; connection to off-detector readout electronics via optical fibres Achievements: Commission services Commission DAQ and offline with cosmic and random triggers. Pixel endcap A Service quarter panel

9 More on Optoboards Three problems affects the optoboard’s VCSELs: Temperature dependence Low optical power at low T, but optoboards coupled to cooling Forced the use of heaters to keep the optoboards at room temperature. Common-Series-Resistance Symptom: VCSEL dying during production (aging process?) No dead VCSEL observed since Oct Slow-Turn-On: Shown later not to affect operation after tuning of optical threshold 10C 5C -5C -10C -15C -20C -25C Optical power (uW) Channel

Cosmics run I Timewalk spreads hits through different “bunch crossings” The LVL1 distribution is sensitive to module timing and has been used to Check module relative synchronization with resolution better than 1 ns. Delay VS module number ns Disk 0 Disk 1 Disk 2 ns Hits in time with trigger Flat noise distributio n 10 ns

Cosmics run II Occupancy: hit probability per bunch crossing of a pixel. True random occupancy is order of Efficiency can be computed using particles which cross overlapping modules in the same disk ( 24% of tracks) Average efficiency ~99% After masking 89 (out of 1.6×10 6 ) pixels with occupancy greater than Signal Noise *

12 Pixel Package Integration (Mar-Jun07) End-cap Beampipe Service panel Connection of cooling pipes Permanent connection of micro-cables

SQP integration and Connectivity Test Connectivity test to check Permanent module connection to services Last chance to repair before installation in the pit! The first time the full detector is readout using the full readout chain Connectivity test setup: Use cosmic test hardware (can only test ~10% of pixel at a time) No cooling available: possible switching on only a reduced part of the detector at a time. 1 module 2 modules on 3 modules on Hardware T interlock

Results of the Connectivity Test Check optical and electrical connections: LV, HV, Env sensors Micro-cables mapping Optical fiber mapping Optoboard tunability Results: Only 2 module failures: One broken HV cable LV short problem 1 PiN and 1 VCSEL single channel dead Every optoboard tunable Required DCS/DAQ development As built detector quality: Localised inefficiencies ~0.12% –2 unusable modules –3 dead FE chips –None of these in the B-layer! Individual bad pixels ~0.2% Layer 2:0.29% Layer 1:0.20% B-Layer:0.07% Disks:0.15% Most relevant failures: disconnected bumps noisy channels reduced charge collection

... and then diving June 25 June 29

Pixel Commissioning plans Atlas combined run M5 (22 Oct – 5 Nov): Data taking with off-detector electronics, few modules and Simulated ROD events. Connection of the detector (Dec/Jan): Test/commissioning of electrical/optical/cooling connections Sign-off of the detector (Feb/March): Commissioning of the cooling system with detector powered Calibration and noise measurements Data taking Combined run with ID sub-systems for ID sign-off Cosmics run with Atlas (Mar/April)

Conclusions The ATLAS Pixel detector construction has been completed and the detector has been installed on June 29! Detailed information of each of the 80M channels: the fraction of defective pixels is below 0.4% One endcap has been used for system commissioning: matching of optical components proved to be critical reconstruction and simulation software validated using cosmics rays: noise occupancy O( ) efficiency >99% resolution matches MC expectation. Unfortunately final connection to the services will not be possible until December: operation only in March. As Sleeping Beauty waiting for Prince Charming...to be awakened by a cosmics’ kiss

Backup

Common Serial Resistance (CSR) Symptom: like a dead VCSEL Some “failed” boards recovered A procedure is developed to measure the resistance of the inaccessible CSR and the worst boards are rejected.(~7% ) The reason is not understood yet Conductive epoxy thickness? Time dependent ?

Optical Power Ratios (H/R) Suspicious STO # of channels Optical Power Ratio (High/Random)

Connections at PP1 A Quadrant at PP1 Type 2 cables (connectors only) Type 1 cables Optofibers faceplate Corrugated panels (Outer/Inner)