Project Management Software Application PRM 705 Lecture 29.

Slides:



Advertisements
Similar presentations
Micro Control Solutions Stability System II rev. 6.4
Advertisements

Service and Dispatch Updates Presented by: Derek Kratz.
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
©2012 Construction Science, LLC 1 Primavera P6 Settings Presented by Karen Reynolds, Partner Construction Science, LLC.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Item Master Creation in Shoper 9 January 2010.
COST MANAGEMENT Movement Management. COST MANAGEMENT Cost Management is accessible on the Movement level from MANAGE MOVEMENT page 2 nd Level Navigation.
Planning Matrix Step-by-Step Guide Office of Institutional Research.
Micro Control Solutions Annual Product Review rev. 6.5 “Click” for next slide Move to the next slide when the request appears.
1 GROUP CATEGORY e.g. Independence High School GROUP e.g. High School Teachers Users GROUP e.g. High School Students Users GROUP e.g. Math Teachers Users.
Project Management Software Application PRM 705 Lecture 27.
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Title Slide without Picture Subtitle Presenter’s Name Presenter’s Title Organization,
Ch9: Software Engineering Tools and Environments.
1 Computing for Todays Lecture 16 Yumei Huo Fall 2006.
Customers Training Where “Lean” principles are considered common sense and are implemented with a passion!
Business Computer Information Systems Microsoft Office XP Access Review Lessons 1 through 5.
Project Management Software Application PRM 705 Lecture 30.
Project Management Software Application PRM 705 Lecture 19.
Create Forms Lesson 5. Software Orientation Creating Forms A form is a database object –enter, edit, or display data from a table or query Providing.
Inti Online Login Page (Lecturer/Student/Administrator View)
Microsoft Access Review for Access Exam. Columns are called FIELDS Rows are called RECORDS Navigation Pane:  On left; used to organize DB objects  Collapsable.
Primavera Highlights During COLLABORATE  Primavera Key Note: Making the Most of Your Oracle Primavera Investment Dick Faris, Primavera Co-Founder & Oracle.
CPSC 203 Introduction to Computers T59 & T64 By Jie (Jeff) Gao.
Web Technologies Website Development Trade & Industrial Education
Access The L Line The Express Line to Learning 2007 L Line L © Wiley Publishing All Rights Reserved.
Planning and Writing Your Documents Chapter 6. Start of the Project Start the project by knowing the software you will write about, but you should try.
CPSC 203 Introduction to Computers T43, T46 & T68 By Jie (Jeff) Gao.
1 Entire Website SITE DIRECTOR Channel Director Section Editor Homepage Editor Section Editor District/Main Site SUBSITE DIRECTOR Channel Director Section.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 CASE Computer-aided software engineering Excerpted from Ian Sommerville’s.
 A database is a collection of data that is organized so that its contents can easily be accessed, managed, and updated. What is Database?
Audio Dial In: or CRM to RM Visual CRM to MS-CRM 2007 Visual User Group Nov 21 st 2007.
Project Management Software Application PRM 705 Lecture 23.
Project Management Software Application PRM 705 Lecture 32 1.
What’s New in SEER-H 7.3 The Galorath Team. New Features Currency and Exchange Rate (with Multi-Currency option) Addin Enhancement Local Quantity, Schedule.
Relational Databases (MS Access)
Computer Literacy BASICS: A Comprehensive Guide to IC 3, 5 th Edition Lesson 24 Managing and Reporting Database Information 1 Morrison / Wells / Ruffolo.
Project Management Software Application PRM 705 Lecture 15 Mian Wasim Irshad.
Unit 5, Lesson 2 Editing Records and Using Forms.
Return to Outline Copyright © 2011 by Maribeth H. Price 3-1 Labeling and annotation.
WikiPlus Configurations Configure WikiPlus elements to your needs.
Project Management Software Application PRM 705 Lecture 16 Mian Wasim Irshad.
Project Management Software Application PRM 705 Lecture 24.
Project Management Software Application PRM 705 Lecture 22.
APPX Design Environment Futures Planned development.
CPSC 203 Introduction to Computers T59 & T64 By Jie (Jeff) Gao.
Hannah Schumacher, PSP, LEED AP, PMI-SP Hill International Charlie Jackson, PSP, Primavera Certified Trainer Project Life Span, LLC Construction CPM Conference.
Special Education: Goals and Progress Reports Amy B. Luchans SPD02.
Academics Management Program Management & Tracking Student Management & Tracking An institution spends a huge amount of time and effort in tracking and.
Adding Reports to a Database. Why do we use Reports? Reports are well-designed printed pages that offer several advantages: Reports are well-designed.
VA Primavera P6: Creating a Project and Work Breakdown Structure (WBS) Department of Veterans Affairs Office of Information and Technology IT Workforce.
VA Primavera P6: Accessing the Program Department of Veterans Affairs Office of Information and Technology IT Workforce Development (ITWD) in collaboration.
Database (Microsoft Access). Database A database is an organized collection of related data about a specific topic or purpose. Examples of databases include:
What’s New – Invoices Comparison of GSCP and the New Supply Chain Platform for Ministry of Defence (SCP-MOD) January 2014.
CHAPTER 7 LESSON B Creating Database Reports. Lesson B Objectives  Describe the components of a report  Modify report components  Modify the format.
Data Virtualization Demoette… Business Directory Custom Properties
Creating & Editing Reports
Exploring Microsoft Access 97
Project Management Software Application PRM 705
Kanban Task Manager SharePoint Editions ‒ Introduction
Project Management Software Application PRM 705
Introduction With TimeCard users can tag SharePoint events with information that converts them into time sheets. This way they can report.
NCS Advertising Enterprise OneView Self-Service
(c) 2004 MCSC Technology Training
Mail Merge April 1, 2004.
Creation and configuration of surveys
Creation and configuration of surveys
GIS Lecture: Data Tables
Cycle 3: Unit 27 Lessons 104 – 111.
Reports Report builder meets the challenge by making it easy to design, publish, and distribute professional, production-quality reports in a variety of.
Presentation transcript:

Project Management Software Application PRM 705 Lecture 29

Recap Printing WBS Creating WBS Dictionary Associating Activities to WBS User defined fields OBS

Today’s Outline Responsible Manager Activity Codes Resources Default Currency Default Costing Unit Material Unit Resource Dictionary Resource Assignment

Assign Responsible Manager Goto WBS mode > add column “responsible manager”

Activity Codes Activity Codes enable you to classify and categorize activities according to you organizational and project needs. You can use activity codes to view and roll-up activities in the Activity Table; build reports in the Report Wizard or Report Editor; organize a layout by grouping activities into specific categories; and select and summarize activities. Examples include Phase, Area, Site, and Division.

Creating activity codes Division wise / city wise / contractor wise Enterprise > activity codes Used for grouping

Creating activity codes

Assigning Activity Codes

Resources

Pre-requisites for resources – Default currency – Costing unit – Material measuring units

Default currency Edit > user preferences PKR won’t be available

Default currency Admin > currencies

Default currency Normally contracts are in USD

Changing defaults of project

Changing costing unit

Defining Material Unit Admin > admin categories

Creating resource dictionary Enterprise > resources

Creating resource dictionary

Thank You