1 FP7 LED Potential program to develop inertial sensors Explore potential to achieve 0.1nm stability scale for the FD above a few Herz A.Jeremie, C.Hauviller.

Slides:



Advertisements
Similar presentations
FINAL FOCUS: COMBINATION OF PRE ISOLATOR AND ACTIVE STABILISATION K. Artoos, C. Collette, R. Leuxe, C.Eymin, P. Fernandez, S. Janssens * The research leading.
Advertisements

Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
1 LAViSta Laboratories in Annecy working on Vibration and Stabilisation Impact of random and determinist acoustic noise on vibrations at high frequencies.
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Pre-isolator Update 18 th MDI Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist December 17, 2010.
Benoit BOLZON Nanobeam 2005 – Kyoto Active mechanical stabilisation LAViSta Laboratories in Annecy working on Vibration Stabilisation Catherine ADLOFF.
Stabilization of the FF quads A.Jeremie B.Bolzon, L.Brunetti, G.Deleglise, N.Geffroy A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
Introduction to seismic sensors (subject 3.2) Peter Novotny PACMAN meeting, CERN, 7 October 2014.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
CLIC MDI Working Group QD0 external reference structure A. Gaddi, H. Gerwig, H. Hervé, N. Siegrist, F. Ramos.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
Slide # 1 Velocity sensor Specifications for electromagnetic velocity sensor Velocity sensors can utilize the same principles of displacement sensor, and.
IN2P3 Les deux infinis G. Balik, B. Caron, L. Brunetti (LAViSta Team) LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry,
Chapter 6 Control Using Wireless Throttling Valves.
Quad-to-quad correlated motion in FLASH Ramila Amirikas, Alessandro Bertolini DESY Hamburg XFEL beam dynamics meeting, February 25 st 2008.
Measurements of stray field in the NLCTA area Josef Frisch, Peter Tenenbaum, Tor Raubenhemier.
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
1 LAPP in ATF2 Extraced from ANR bid A.Jeremie. 2 LAPP in ATF2 Current activities related to accelerators: The LAPP-Annecy team is currently developing.
1 Stabilization Projects at SLAC Eric Doyle, Leif Eriksson, Josef Frisch, Linda Hendrickson, Thomas Himel, Thomas Markiewicz Richard Partridge NLC Project,
CLIC QD0 Stabilization J. Allibe 1, L. Brunetti 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2,C.Hernandez 2 1 : LAPP-IN2P3-CNRS,
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
CLIC MDI stabilization update A.Jeremie G.Balik, B.Bolzon, L.Brunetti, G.Deleglise A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Active Vibration Stabilization for the NLC Final Focus Quads Josef Frisch, Linda Hendrickson, Thomas Himel, Andrei Seryi,
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
CARE / ELAN / EUROTeV Feedback Loop on a large scale quadrupole prototype Laurent Brunetti* Jacques Lottin**
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CARE / ELAN / EUROTeV Active stabilization of a mechanical structure Laurent BRUNETTI LAViSta Team LAPP-IN2P3-CNRS,
Hard or Soft ? C. Collette, K. Artoos, S. Janssens, P. Fernandez-Carmona, A. Kuzmin, M. Guinchard, A. Slaathaug, C. Hauviller The research leading to these.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
How high frequency we care if we need the stabilization of 1nm level?
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Ground Motion spectra status A.Jeremie on behalf of the DESY EUROTeV group which ceased to exist mid-2008 : R.Amirikas, A.Bertolini and W.Bialowons (et.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
Beam Physics Issues of Main Beam Stabilisation A.Jeremie (LAPP) C.Hauviller (CERN)
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
FP7: EuCARD after a year of preparation… A.Jeremie.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
NLC - The Next Linear Collider Project Keeping Nanometer Beams Colliding Vibration Stabilization of the Final Doublet Tom Himel SLAC NLC MAC review October.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
1 A_RD_2A_RD_2 Design of the linear collider machine-detector interface and ATF-2 at KEK Ph.Bambade, J.Brossard, O.Dadoun, C.Rimbault, M.Alabau Pons, A.Jeremie,
FF Stabilisation A.Jeremie (Summary of things learned and work done at LAPP, CERN, SYMME, Oxford, SLAC)
QD0 Stabilisation L. Brunetti 1, J. Allibe 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, A. Badel 2, R. Le Breton.
CARE05 – November Status report on active stabilisation of a linear collider final focus quadrupole mock-up J. Lottin, ESIA
EuroTeV WP7 activities at DESY Group Members: R. Amirikas, A. Bertolini, W. Bialowons, H. Ehrlichmann Total Man Power: 1.5 reaching 2 (maximum)
ESGARD OMIA Sept EUROdrive and LED Motivation Work Packages Partners & resources.
Vibration issues at Linear Colliders:
Active isolation Target : a low cost dedicated table
3: ISI ASCR, Brno University of Technology, Brno, Czech Republic
Topics on Vibration Issues
Laboratories in Annecy working on Vibration Stabilization
ATF2: final doublet support
FP7 LED A.Jeremie, L.Brunetti, N.Geffroy.
What Should We Do?.
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
CLIC-ILC BDS & MDI work.
A.Jeremie Some drawings from different CLIC’08 presentations
A.Jeremie, B.Bolzon, N.Geffroy
IP configuration session
Seismometer Development for the 1TeV Linear Collider
Presentation transcript:

1 FP7 LED Potential program to develop inertial sensors Explore potential to achieve 0.1nm stability scale for the FD above a few Herz A.Jeremie, C.Hauviller

2 2) Potential programme to develop inertial sensors. (Claude+Andrea) : a)State of the art. b) Current limitations that need to be addressed to achieve 1nm above 1Hz and 0.1nm above 5Hz. c) Potential means to overcome these limitations. d) A rough idea of a potential schedule. It would be useful to keep in mind that we would like to use the sensors in the project. e) Resources needs and availability. 4) Potential programme to develop the software for the design of the module and to control the feedback. (Andrea)

3 State of the art inertial sensors NI PCI-6052 Multifunction DAQ Fast cardLow noise card  Compatible Matlab/Simulink (Softwares used for the algorithm) nm stabilisation equipment exists

4 Feedback output: Actuator at the fixed- part of the beam State of the art inertial sensors Free-fixed configuration close to the detector

5  « Passive » rubber: - Enhance the perturbation around a given frequency f c - Damp perturbations above f c  « Active » :- Active isolation in the frequency range enhanced by the passive material Transfer function for passive material frequency fcfc TMC Isolator =>start building a prototype combining Passive and Active isolation

6 Electrochemical motion sensor Special electrolytic solution Four platinum mesh electrodes ( 2 anodes and 2 cathodes ) An external acceleration creates a differential pressure across the channel and forces the liquid to move with velocity V. Ions move to the electrodes. SP500 sensors from EENTEC to 75 Hz Non magnetic 20KV/(m/s)  very sensitive!! Introduction High frequency sensor VE13 Low frequency sensors 1 Tesla testing PMD scientific has promised to send us 2 prototypes; conditions not yet finalised => work together on sensor development

7 Spring Cantilever Electrodes, Test Mass RF IN RF Out SLAC sensor development with Joe Frisch BeCu spring (high tensile strength, non magnetic): Pre-bent; Simulation of creep fluctuations indicate <1 nm noise Thermal effects very large!! ~10 -8 C corresponds to (0.1Hz) noise limit Eddy currents from variations in solenoid field produce non-negligible eddy current forces on these conductors

8 Inertial Sensor Development Develop in lab a new sensor as SLAC did: not us! We don’t have the necessary resources for that at LAPP! Would need an electrical/instrumentation engineer for that Keep an eye on commercial developments and contact companies: -sensors: PMD scientific, PCB scientific -actuators: Cedrat and PI =>Milestones: over the whole period of program =>Human resources: PhD? for 3 years plus supervisor (50%?) =>Financial resources: 2 sensors/year: between euros each actuators: 1000 euros each

9 FD stability Things we don’t know: What is the FD configuration? Saclay? Is it normal or superconducting? (M.Aleksa’s work: Sm 2 Co 17 ) How close to detector? MDI issues=> free-fixed or fixed-fixed configuration? What is needed for CTF3 test: in preliminary proposal text it is said that a mechanical equivalent could be used…FD issues not for CTF3? Needed for a test: -FD (real or mock) -support (what configuration?) -sensors/actuators -feedback loop (see next presentation)

10 Reflections on FD stability for ATF2 (B.Bolzon): Beam repetition rate: 1Hz at beginning=>beam-based feedback 0-0.1Hz (at best!) CLIC Stacis 2000 table works best between 1-50Hz=> even amplifies vibrations below 1Hz! Rigid mount preferred to have coherent movement with Beam-shape Monitor (Shintake)Rigid mount preferred to have coherent movement with Beam-shape Monitor (Shintake) CLIC Stacis 2000 block in free floating configuration (250Hz), but in fixed configuration (60Hz). Still OK.

11 LHC Low ß Quadrupole Vessel socket vs jack base the transverse mode structure already visible at the interface between the jack and the concrete pad, but not in the floor the enlarged contact surface produces significant benefits on the dynamic stability of the module Effect of the support foundation Vessel socket vs floor the results of the measurements on this short quadrupole cryostat look promising for the use of the alignment jacks for the ILC linacs, after suitable modifications R.Amirikas, A.Bertolini

12 Resources needed Human resources: Mechanical engineer for design of support from Europe: 36 months Machine shop: 6 months Automatics engineer (see next presentation) Sensor and actuator, MDI study: PhD? together with module support? Material resources: dedicated sensors: between euros each actuators: 1000 euros each material for support construction: euros Milestones: the two-beam scheme being the main subject to demonstrate for 2009/2010, the FD stability can go over the 5 years of the program. =>construction of test stand until 2009 with specifications well understood =>tests during 2009/2010