DCPR TRANSITION FROM GOES I/M TO GOES N/P: A UNIQUE OPPORTUNITY FOR POWER REDUCTION DCS MANUFACTURERS MEETING NOVEMBER 9, 2006 Peter Woolner Mitretek Systems.

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization/Mitigation Proposal
Advertisements

1 Broadcaster Relocation Fund Workshop Expanded Presentation June 25, 2012 Presented by: Jay Adrick, Vice President Broadcast Technology.
DCPR FREQUENCY PLANS DCS MANUFACTURERS MEETING NOVEMBER 10, 2004 Peter Woolner Mitretek Systems
ECE 5233 Satellite Communications
L.M. McMillin NOAA/NESDIS/ORA Regression Retrieval Overview Larry McMillin Climate Research and Applications Division National Environmental Satellite,
NTIA TRANSMIT SPECTRUM REQUIREMENTS FOR THE REVISED DCPRS CERTIFICATION STANDARDS DCS MANUFACTURERS MEETING NOVEMBER 10, 2004 Peter Woolner Mitretek Systems.
Commuter Rail Vehicle Technology Analysis | 1 May 2007 Commuter Rail Vehicle Technology Analysis May, 2007.
Copyright © 2005 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Own Use Gas Review of Pre-heater.
1 Chapter 6 Low-Noise Design Methodology. 2 Low-noise design from the system designer’s viewpoint is concerned with the following problem: Given a sensor.
Clustered or Multilevel Data
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
NETE 0510 Presented by Dr.Apichan Kanjanavapastit
Doc.: IEEE /160r0 SubmissionSlide 1 Output power management for TVWS network coexistence Notice: This document has been prepared to assist IEEE.
How a Small Change in Labor Rates Leads to A Large Change in Profits.
DCP COMMAND …bringing two-way communications to your DCPs.
DCP COMMAND …bringing two-way communications to your DCPs.
C. Bordoy UWC Maastricht Market Failure Evaluation of policies to correct externalities.
TRANSMIT SPECTRUM ISSUES MANUFACTURERS MEETING AUGUST 2004 Peter Woolner Mitretek Systems
Classification of PP&E
International Civil Aviation Organization Colloquium on Environmental Aspects of Aviation Aircraft Noise - The Way Forward Willard Dodds, Chairman ICCAIA.
1 Responses to Vendor Comments DCS MANUFACTURERS MEETING NOVEMBER 9, 2006 Peter Woolner Mitretek Systems
Conclusions Goal is to determine: –if Bessel or RRC filters better for DCS? –can -25 dBC sidelobe requirement be met? Still a work in progress, found it.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
1 DCPR Power Ranges Proposed for CS v.2.0 DCS Manufacturers Meeting June 13, 2007 Peter Woolner Noblis
1 PETER WOOLNER MITRETEK SYSTEMS KAY METCALF NOAA GOES DCS PROGRAM MANAGER NOAA DECISION BRIEFING STIWG AND TWG NOVEMBER 7-8, 2006 ASHEVILLE, NC.
© 2006 Pearson Addison-Wesley. All rights reserved13 B-1 Chapter 13 (continued) Advanced Implementation of Tables.
1 Proposal for a downscaling procedure for the extra high speed phases of the WLTC for low powered vehicles within a vehicle class Technical justification.
Spectrum Management 2002 Marc Goldburg CTO, Internet Products Group ArrayComm, Inc. Adaptive Antennas (or “doing more with less”)
The 2012 IECC A Rare Opportunity for Major Energy Savings Add AIA.
1 Compiler Construction (CS-636) Muhammad Bilal Bashir UIIT, Rawalpindi.
OBTAINING QUALITY MILL PERFORMANCE Dan Miller
Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission Title: Link Budget for m Date Submitted: 5 March 2012.
1 DCPRS CERTIFICATION STANDARD STATUS DCS MANUFACTURERS MEETING MAY 18, 2006 Peter Woolner Mitretek Systems
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
Unit 5 Lecture 2 Error Control Error Detection & Error Correction.
1 DCS MANUFACTURERS MEETING NOVEMBER 9, 2006 Peter Woolner Mitretek Systems Link Budgets.
Adding Like Fractions. Main Idea/Vocabulary like fractions Add and subtract fractions with like denominators.
SWE-DISH SATELLITE SYSTEMS
Residential Heat Pump Water Heaters: HVAC Interaction Study RTF HPWH Subcommittee May 14, 2015.
1 CS v.2.0 Outstanding Items DCS Manufacturers Meeting June 13, 2007 Peter Woolner Noblis
1 THE GOES N GENERATION SATELLTES April 27, 2004 Peter Woolner, Mitretek Systems.
Options for Data Distribution in the GOES-R Series GOES User Conference SESSION 5 Peter Woolner / Mitretek.
Doc.: IEEE Submission July 2010 Peter Bradley, Zarlink SemiconductorSlide 1 Project: IEEE P Working Group for Wireless Personal.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
1 1 Slide © 2007 Thomson South-Western. All Rights Reserved Chapter 8 Interval Estimation Population Mean:  Known Population Mean:  Known Population.
Sunglasses Sales Excellence Discussion. Sunglasses Identify and describe at least one further feature of this time series data with reasons. – Sunglasses.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
1 THE EMWIN TRANSITION April 27, 2004 Angelo Wade, NESDIS Ground Systems.
GOES Data Collection System Status of Version II Transmitter Implementation Information Brief for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
CS 361 – Chapter 10 “Greedy algorithms” It’s a strategy of solving some problems –Need to make a series of choices –Each choice is made to maximize current.
Certification Standards V.2 Peter Woolner Noblis May 20,
Year 10 New AQA Triple Science What you will be doing.
GOES Data Collection System Status of Version II Transmitter Implementation Information Brief for TWG Kay Metcalf NOAA GOES DCS Program Manager November.
Summary of DCS Manufacturers Meeting March 22/23, 2004 Peter Woolner Mitretek Systems
1 DCS MANUFACTURERS MEETING NOVEMBER 9, 2006 Peter Woolner Mitretek Systems /300 Auto Detect.
The FCC’s Love Triangle with Census Maps and the Illusion of Efficiency (AKA: Analyzing Competitive Overlap/Disaggregation of Costs in Competitive Areas) 
FIXED SATELLITE SERVICE and UAS (22 September 2010)
Flocculator Extras.
IEEE AES Society Proposed ByLaw Change for Board of Governors Election
Progress report by the Chair of the informal group on REC
600 MHz – Proposed TV Transition Objectives and Methodology
FACILITY LAYOUT Facility layout means:
Figure 3: Risk Analysis Model
Informal document GRE-79-04
Submission Title: Link Budget for m
Advanced Implementation of Tables
July 2010 doc.: IEEE xxxx July 2010
Water Directors meeting Warsaw, 8-9 December 2011
Informal document GRE-79-xx
Presentation transcript:

DCPR TRANSITION FROM GOES I/M TO GOES N/P: A UNIQUE OPPORTUNITY FOR POWER REDUCTION DCS MANUFACTURERS MEETING NOVEMBER 9, 2006 Peter Woolner Mitretek Systems

2 CS v.1b to v.2 Transition All changes proposed for Certification Standard v. 2.0 may be mixed with DCPs that comply with v. 1.0b EXCEPT the uplink EIRP limits (at least RF changes) Significant reduction in the required EIRPs for all DCPs is very desirable The transition from GOES I/M series to GOES N/P series provides a unique opportunity that is unlikely to recur

3 SCOPE OF TRANSITION CHANNEL TYPE G-11 & -12 CHANNEL CAPACITY GOES-13 CHANNEL CAPACITY CHANNEL CAPACITY INCREASE 300 bps bps253 CDMA bps (International) 440 Satellite Power (measured PLT) 36.5 dBmi50.5 dBmi14.0 dB NOTE: It is assumed the 100 bps signals have EIRPs between 35 and 50 dBmi and that this will have a negligible effect on the GOES-13 transponder performance

4 Transition Procedure 1.Any v.1.0b DCP can be changed to a v.2 DCP at any time, except for EIRP & FSS 2.They can’t actually operate on the split channels until DAPS and DAMS-NT are upgraded 3.Changing any two adjacent channel (one on each satellite) to new DCPs will give 4 or 5 new channels 4.Changes of any additional adjacent channels (n total) make 2n or 2n+1 new channels available

5 Transition Start: GOES-13 Activated It is assumed the DCPR transponder is loaded to 110% of GOES-11 and -12 capacity for some significant part of each day due to uplink spill-over –96 channels at 300 bps at 47 to 49 dBmi (with some unknown number still at 100 bps plus 4 international channels at 100 bps) –2 channels at 1200 bps and at 50 and 52 dBmi –Uplink equivalent of 113 channels at 48.3 dBmi average It is also assumed the DAPS and DAMS-NT have been upgraded to accommodate CS v.2 changes

6 EIRP Limit Calculation Process Select an EIRP range for 1200 bps signals EIRPs for 300 bps signals is 6 dB less EIRPs for CDMA is 7 dB less Assume bps channels remain in international band in 35 to 50 dBmi range Calculate performance on GOES-13 for: –110% capacity for GOES-11 and GOES-12 –110% capacity for GOES-13 and GOES-O –Capacity throughout transition in 10% steps

7 Requirements for Calculation Results At start of transition, the first DCPRS that changes to CS v.2, even if it is at the specified minimum uplink EIRP, must be able to provide an E B /N 0 of 12.7 dB/Hz to a DRGS w. 15 dB G/T Every new channel to be added will need an old channel to be changed from v.1.0b to v.2 (Remove 1 old channel to add 2 new channels) Include some extra margin for channel flexibility At end of transition, it is desired there be enough margin to allow 20 simultaneous CDMA signals

8

9

10

11 Recommended EIRP Limits If an EIRP range of 2 dB is acceptable: –1200 bps signals at 45 to 47 dBmi –300 bps signals at 39 to 41 dBmi –CDMA signals at 38 to 40 dBmi If an EIRP range of 4 dB is required: –1200 bps signals at 46 to 50 dBmi –300 bps signals at 40 to 44 dBmi –CDMA signals at 39 to 43 dBmi

12 All DCPs would be able to operate with 1 to 3 dB less EIRP and therefore with less input power Narrow range will permit twice as many CDMA channels as the wide range –Number is not known but the ratio will be about 2 for narrow v. wide EIRP limits The EIRP will have to be adjusted on-site Narrow Range Pro and Con

13 Some form of power adjustment is required to achieve the 2 dB EIRP range Must have a step size of 0.5 dB or less Remote control of the power level would be desirable but is not necessary Access by unauthorized persons must be made reasonably difficult DCP Power Adjustment

14 DCP Power Adjustment (2) Recommend management issue of who can control be separated from technical issue of how control is to be applied Recommend: –Manufacturers should answer the “How?” –NOAA/STIWG should answer the “Who?”

15 Schedule Considerations Current estimate for series transition is: –GOES-12 to GOES-13 ~January 2011 –GOES-11 to GOES-O ~June 2011 –(Based on remaining fuel v. consumption) CS cannot be finalized before January 07 Therefore there will be less than four years in which to prepare Resolution of outstanding items is urgent

16 SUMMARY There are three possibilities: –Prev. proposed levels: 300: 47-49, 1200: –Wide EIRP range: 300: 40-44, 1200: –Narrow EIRP range: 300: 39-41, 1200: The change-over could start as soon as new equipment can be built Partly depends on range of EIRP control that is practical Change is easiest when GOES-13 starts operations, or will need close cooperation