1-Day of 2-D How Are The Results Of Hydraulic Models Used To Manage Floodplain Development Under The NFIP? Eric Simmons, FEMA Region IX.

Slides:



Advertisements
Similar presentations
Flood Map Modernization in North Dakota North Dakota State Water Commission FLOOD MAP MODERNIZATION.
Advertisements

Regulations and Processes for Floodway/Non-Encroachment Area Encroachments. What to look for and what to require. Robert Billings, PE, PH, CFM Mecklenburg.
FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
IV. 1 IV. Overview Of State Standards A.SS1-97: Requirement for Flood Study Technical Documentation.
Modeling to Revise Coastal Inundation and Flooding Estimates in Georgia and Northeast Florida Association of State Flood Plain Managers Conference May.
Dynamic Floodways: Accounting for Both Storage and Conveyance José María Guzmán, P.E. Gaston Cabanilla, P.E., CFM May 2010, National ASFPM Conference,
FEMA’s Flood Risk Review Meeting: Building Confidence in Risk MAP Products 2012 ASFPM National Conference San Antonio, Texas May 24, :00 pm.
Use of a hydrodynamic model to
ADRICOSM-EXT PROJECT (ADRIatic sea integrated COastal areaS and river basin Management system pilot project - EXTension) WP2 – INTEGRATED CATCHMENT SIMULATOR.
Reinaldo Garcia, PhD A proposal for testing two-dimensional models to use in the National Flood Insurance Program.
Springettsbury Township STORMWATER AND HOW IT AFFECTS YOU February 19, 2013.
The New FIS Report: What Has Changed and What Does the Future Hold? May 17, 2011 Andy Bonner, PE, CFM – BakerAECOM Scott McAfee, CFM, GISP – FEMA Turgay.
Update on Use of Hazus for FEMA Risk MAP Flood Risk Products Shane Parson – RAMPP PTS (URS)
Duval County: Using the power of SWMM unsteady modeling for CLOMR applications May , Louisville KY José Maria Guzmán, P.E. D.WRE Gaston Cabanilla,
Floodplain Boundary Standard A Coastal Perspective May 23, 2012 Mark Zito, GISP, CFM CDM Smith Alex Sirotek, CFM CDM Smith RSC 1 Lead.
Comparison of Wave Climate Analysis Techniques in Sheltered Waters May 19, 2011 Tim Hillier, P.E., CFM Associate Lauren Klonsky Water Resources Engineer.
Approximate Floodplain Mapping - Procedures and Approaches to Data Challenges Troy Thielen, CFM Brett Addams, CFM May 18, 2010.
Risk Map Early Demonstration Project Lackawanna County, PA CCO Meeting September 13, 2011.
Floodplain Mapping using HEC-RAS and ArcView GIS Eric Tate Francisco Olivera David Maidment
Processing Geospatial Data with HEC-GeoRAS 3.1
North Carolina Neuse River Basin Plan Final Scoping Meetings April 23, 24, and 25, 2001.
Preliminary Flood Insurance Rate Maps. What is a Flood Insurance Rate Map (FIRM) and how do I use it?* A FIRM is a map created by the NFIP for floodplain.
CHAPTER 3 MAPS AND MAP CHANGES
Creating Depth Grid from a DFIRM FEMA Region VIII Mitigation GIS Team Wednesday, February 13, 2013.
David Knipe Engineering Section Manager Automated Zone A Floodplain Mapping.
Flood Risk Review Meeting: [Watershed Name] [LOCATION] [DATE]
Map Modernization Management Support Best Practices Project - FEMA State of Idaho Idaho Department of Water Resources Boise, Idaho November 2008.
Flood Risk Datasets & Products in Greenville County, South Carolina Agenda Greenville Co, SC Overview Process, Examples, Lessons Learned, and Community.
Creating Value … … Delivering Solutions Modeling 72-Miles of the Mississippi on a 2-Mile Budget Mohamed A. Bagha, P.E., CFM Dong Nguyen, P.E., CFM Pradeepa.
1 US Army Engineer Research and Development Center FEMA REGION III COASTAL MAPPING PROJECT May 19, 2011 Coastal Analyses and Outreach Robin Danforth, FEMA.
National Flood Insurance Program (NFIP) and Map Modernization History and Overview Bill Massey and Sam Crampton Dewberry South Florida Water Management.
Watershed Management Program Topographic Information Watershed Evaluation Watershed Management Plan Implementation of Best Management Practices Maintenance.
National Flood Conference April 22, 2009 Victor Hom Hydrologic Services Division Office of Climate, Water and Weather NOAA’s National Weather Service National.
Advances in Alluvial Fan Floodplain Delineation & Modeling A Call For Action ASFPM Arid Regions Committee May 2010.
North Carolina White Oak River Basin Plan December 19, 2000.
Wave Height Estimate for Multi- Frequency Flooding Events Elena Drei-Horgan, PhD, CFM Darryl Hatheway, CFM Paul Carroll, PE May 24, 2012.
Office for Information Resources GIS Services Flood Map Modernization and the Tennessee Base Mapping Program Dennis Pedersen, Director F&A, OIR – GIS Services.
Behind The Curtain: GIS and Floodplain Mapping Adam Daily, Bradford Hartley, & Adam Pooler GIS Analysts Stantec Consulting Services Inc Ohio GIS.
North Carolina Tar-Pamlico River Basin Plan Final Scoping Meetings January 30 and 31, 2001.
Assessment of Economic Benefits of the North Carolina Floodplain Mapping Program Hydrologic and Hydraulic Case Studies Adapted from a Presentation to NRC.
Risk MAP and Resilience Mari Radford, CFM, Mitigation Planner Alison Kearns, CFM, Community Planner FEMA Region III.
Flood Map Modernization and North Dakota Julie Prescott, ND Map Modernization Coordinator North Dakota State Water Commission And Brian Fischer, CFM, GIS.
CRWR-FloodMap ArcView Digital Elevation Model HEC-HMS Flood discharge HEC-RAS Water surface profiles ArcView Flood plain maps CRWR-PreProAvRAS Digital.
National Consultation with TNMC 3 May 2005, Bangkok WUP-FIN Phase II – Bank erosion study.
North Carolina Pasquotank River Basin Plan Final Scoping Meetings May 17 and 18, 2001.
DFIRM Prototypes State of North Carolina March 20, 2001 North Carolina Floodplain Mapping State of North Carolina.
Dynamic Channel Routing Preissmann Scheme. Dynamic Channel Routing Preissmann Scheme unconditionally stable for  >=0.5 second-order accurate if 
A Great L-EAP Forward: Successes and Challenges in Implementing FEMA’s Expanded Appeals Process Todd Steiner FEMA Maggie Mathis, CFM RAMPP.
Hydrologic Hazards at the Earth’s Surface
Discovery Meeting FEMA Region [#]. 2 Introductions.
FLOOD MAPPING Menaxhimi i rezikut te permbytjeve Objektivat Gjenerale.
Land Subject to Coastal Storm Flowage Rebecca Haney Coastal Geologist Massachusetts Office of Coastal Zone Management.
HEC-RAS Version 3.1 Overview
FEMA Terms (Last updated July 25, 2006) The Acronyms  NFIP – National Flood Insurance Program  FIRM – Flood Insurance Rate Map  SFHA – Special Flood.
Sally McConkey, P.E., D.WRE., CFM Illinois State Water Survey ASFPM Chair USACE Silver Jackets Workshop – August 2012.
Northwest Florida Water Management District Monday, August 22, 2011.
Floodplain Mapping using TINs Triangulated Irregular Networks (TINs) Representation of stream channels using TINs Floodplain delineation using HEC-HMS,
Talavera Floodplain Delineation Study Technical Review Noah’s Ark Group Study Las Cruces, New Mexico September 17, 2008.
1 Byung Sik, Kim Kangwon National University Advanced Hydrology and Water Resources Management.
Oregon Statewide Flood Hazard Framework Geodatabase and Web Library, version 1.0 Seamless statewide GIS floodplain element that conforms to standards adopted.
Development of a High-Resolution Flood Inundation Model of Charles City, Iowa Nathan Young Associate Research Engineer Larry Weber.
Flood Damage Prevention Code Update
Flood Hazard Area, Flood Insurance and Stormwater Management
Map-Based Flood Hydrology and Hydraulics
North Carolina Lumber River Basin Plan
Map-Based Hydrology and Hydraulics
Hydraulic Routing in Rivers
Hydraulic Routing in Rivers
Flood Plain Regulations
Automated Zone A Floodplain Mapping
Presentation transcript:

1-Day of 2-D How Are The Results Of Hydraulic Models Used To Manage Floodplain Development Under The NFIP? Eric Simmons, FEMA Region IX

2 Idealized Schematic of Floodplain Mapping Final Flood Maps Digital Base Mapping Flood Data / Database Hydraulic Modeling Streamflow & Meterological Data Flood FlowsHydrologic Analysis + = Field Data & Surveys Topographic Data & Ground Elevations    -   -  Initial DataInitial Outputs Input AnalysesFinal Products  Floodplain Boundaries Floodway Stations Water Surface Elevations 

3 Considerations For The NFIP  Model Results Are Used For Floodplain Management: Flood hazard areas Flood elevations Regulatory floodways  Differences between 1-D and 2-D Computer Programs?

4 Considerations For The NFIP  Model Results Are Used For Floodplain Management: Flood hazard areas Flood elevations Regulatory floodways  Differences between 1-D and 2-D Computer Programs? Momentum, velocity averaging, vertical variations, etc. Riverine, coastal and alluvial floodplains Cross sections (with prescribed flow direction) vs. nodes Steady vs. unsteady (peak discharge vs. hydrograph) Ability to perform automated encroachment analysis Model setup time, costs, equipment, run times, industry expertise, stakeholder acceptance, etc. Cross section spacing and mesh resolution

5 Considerations For The NFIP  Model Results Are Used For Floodplain Management: Flood hazard areas Flood elevations Regulatory floodways  Differences between 1-D and 2-D Computer Programs? Momentum, velocity averaging, vertical variations, etc. Riverine, coastal and alluvial floodplains Cross sections (with prescribed flow direction) vs. nodes Steady vs. unsteady (peak discharge vs. hydrograph) Ability to perform automated encroachment analysis Model setup time, costs, equipment, run times, industry expertise, stakeholder acceptance, etc. Cross section spacing and mesh resolution

6 Advantages of 2-D Computer Programs  Flow Splits  Very Wide Floodplain  Braided Channels  Scour Analysis  Sediment and Pollutant Transport  Estuary Dynamics  Other?

7 1-D Model Links: Profile, Baseline & SFHA  1% Annual Chance Water-Surface Elevations (for development/new building and flood insurance purposes) determined from Flood Profile along profile baseline (or table in the FIS) Flood Insurance Study (FIS) (digital & hard-copy) Mapped Floodplain (SFHA) on FIRM Panels (digital & hard-copy) ● Baseline ► Model ► Flood Profile ► Floodplain. Hydraulic Model Hydraulic Baseline in Floodplain

8 Floodplain Management  Floodplain Management is a Decision Making Process That Aims to Achieve Wise Use or Nonuse of the Floodplain  With the National Flood Insurance Program over 21,000 communities nationwide have adopted a floodplain management process based on, at least, a Flood Insurance Rate Map  Flood Insurance Rate Maps: High Hazard Areas (flood zone boundary) Base Flood Elevations (flood profile & profile baseline) or Depths Regulatory Floodways (in riverine areas)

9 My Questions For Today What issues does FEMA face in using 2-D and unsteady models? What underlying assumptions of each model are valid/invalid? When do the benefits outweigh costs for another analysis type? Should we let a 2-D hydraulic model delineate the mapped floodplain boundaries (or a separate GIS application as typically done with 1-D analyses)? How can/should 1% annual chance flood elevations be recorded for individual structures (to the nearest tenth of a foot) using 2-D models? Can 2-D programs efficiently model floodways? If not, should NFIP floodplain management and mapping criteria be changed? For which analyses should 1-D and 2-D modeling be linked?