Copyright © 2008 Industrial Committee on Program Management. All rights reserved. NDIA PMSC Baseline Stability Working Group May 2009 Neil Albert Pete.

Slides:



Advertisements
Similar presentations
Project Management 6e..
Advertisements

1 ANSI/EIA A STANDARD Earned Value Management Systems Proposed Changes Discussion January 31, 2007 NDIA Program Management Systems Committee.
1 NDIA Earned Value Management Application Guide Status Report May 3, 2005.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
1 Program Management Systems Committee (PMSC) Contract / Subcontract Issues Working Group 04 February 2010.
Copyright © 2008 Industrial Committee on Program Management. All rights reserved. Predictive Measures of Program Performance June 9, 2008 Industrial Committee.
Blues Chapter CSEP 1 Earned Value Management System (EVMS) Ron Fradenburg Blues Chapter President 19 March 2013 For more information visit:
Page 1 National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC). NDIA Earned Value Management Systems Intent Guide Overview.
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Dave Roberts NDIA PMSC.
NDIA Software Industry Experts Panel Paul R. Croll, Chair NDIA Systems Engineering Division Meeting 24 June 2008.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Chapter 3: The Project Management Process Groups
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Estimating Project Times and Costs CHAPTER FIVE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Earned Value Management Guidelines Tony Finefield Finefield Consulting CPM Webinar 5 September
Jeff Sestokas November 10, 2009 ARA Project Manager Course Introduction Project Management for ARA Engineers and Scientists.
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
1 ANSI/EIA A EIA STANDARD Earned Value Management Systems Potential Changes Discussion August 15, 2006 NDIA Program Management Systems Committee.
Presented to: NDIA By: Keith Kratzert Date: May 3, 2006 Federal Aviation Administration Improving Program Performance at FAA.
1 Cost Benefit EVM at DOT Presented to: Joint Industry – Government NDIA PMSC session Presented by: H. Giovanni Carnaroli Associate CIO, IT Policy Oversight.
1 Program Management Systems Committee Joint Industry/Government Meeting May 21, 2009 EVM for Service Contracts Working Group.
2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Gay Infanti Dave Roberts.
Presented to: NDIA PMSC By: Keith Kratzert Date: August 7, 2007 Federal Aviation Administration Improving Program Performance at FAA.
Project Management Course WebEx Introduction Don Cole & Felix Sanchez Project Management for ARA Engineers and Scientists.
© MCR, LLC MCR Proprietary - Distribution Limited Earned Value Management Application, Guidance, and Education Neil F. Albert President/CEO MCR, LLC
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting January 31, 2007 Updated Feb 4, 2007 Prepared by; Joe Houser KM.
Internal Information Services Risk Management Team Gay Infanti Northrop Grumman 8 February 2005.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
NDIA Program Management Systems Committee APM Reciprocity Agreement GEIA Engineering Bulletin Progress Report August 21, 2004 Walt Berkey, Lockheed Martin.
0 Office of Performance Assessments and Root Cause Analyses (PARCA) PARCA EVM PARCA EVM APPROVED FOR PUBLIC RELEASE DISTRIBUTION UNLIMITED : 15 -S-1591,
Presented to: NDIA By: Keith Kratzert Date: August 16, 2006 Federal Aviation Administration Improving Program Performance at FAA.
Copyright © 2008 Industrial Committee on Program Management. All rights reserved. Predictive Measures of Program Performance March 19, 2009 Industrial.
Strength through Industry & Technology Program Management Systems Committee Procurement Division Educational Seminar 31 March 2008 Sarasota, Florida Current.
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
Rational Unified Process Fundamentals Module 3: Disciplines I.
APPLICATION GUIDE January 27, 2006 Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed Martin Telephone ;
NASA Update NDIA PMSC Quarterly Meeting February 4, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis Team)
Estimating Project Times and Costs CHAPTER FIVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Estimating Project Time and Cost
Copyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved. 10/27/07 SJSU - Bus. 286 David Bentley (Gray & Larson)1 Chapter 5 – Estimating.
Internal Information Services Risk Management Working Group Gay Infanti Northrop Grumman 15 August 2006.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
NASA Update NDIA PMSC Quarterly Meeting August 26, 2010 NDIA PMSC Quarterly Meeting August 26, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis.
1 Program Management Systems Committee (PMSC) Contract / Subcontract Issues Working Group 27 August 2009.
Electronic Enterprise Integration Committee Overview of Aerospace Industry IUID Data Exchange Guideline December 14, 2005 Bill Zirkel, Northrop Grumman.
Project Management Process
2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Mary Ann Hale NDIA PMSC.
Presented by: Presented By: MIL-STD 881 Update Neil F. Albert MCR, LLC 26 August 2010.
Presented to: NDIA By: Keith Kratzert Date: February 1, 2006 Federal Aviation Administration Improving Program Performance at FAA.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
Lab-Wide Earned Value Management System Project Core Team Meeting May 28, 2008 Dean A. Hoffer.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting August 7, 2007 Prepared by; NDIA IBR Working Group August 2007.
V. 2. © Copyright and all rights reserved 4. Project Integration Management PMP Prep Course Based on the PMBOK ® Guide 3 rd Edition.
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting April 24, 2007 Prepared by; NDIA IBR Working Group April 15, 2007.
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
NDIA PMSC Baseline Stability Working Group February 2010 Neil Albert Pete Wynne.
ICOTE Meeting October, Chief Developmental Tester Project Status for ICOTE October 2014 Brendan Rhatigan – Lockheed Martin.
Presented to: NDIA PMSC By: Keith Kratzert Date: April 26, 2007 Federal Aviation Administration Improving Program Performance at FAA (and DOT)
NDIA Integrated Program Management Division EVM Practitioners Forum
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Project Management Processes
NDIA Earned Value Management Application Guide
Project Management Processes
NDIA PMSC Baseline Stability Working Group
DoD MAINTENANCE CONTRACTORS
NDIA PMSC Baseline Stability Working Group
Program Management Systems Committee (PMSC)
Presentation transcript:

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. NDIA PMSC Baseline Stability Working Group May 2009 Neil Albert Pete Wynne

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. 2 Baseline Stability Gerald Self - ITT Marty Doucethe – EVM Services Sondra Ewing – Lockheed Martin Tom Tasker – General Atomics Fran Fulton – Northrop Grumman Neil Albert - MCR Pete Wynne – Lockheed Martin Joe Houser – KM Systems Linda Nobel – Raytheon Mary Ann Hale – General Dynamics Walt Berkey – Lockheed Martin Gary Robinson - Raytheon Ed Silvia - Raytheon

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. 3 Baseline Stability Objective Adapt Program Performance Management to efficiently Integrate with the Acquisition Process given that change is inevitable. Goals Integrate Existing Performance Management With Existing Acquisition Processes Eliminate Waste and Reduce Re-Work in maintaining an integrated performance measurement baseline Streamline the Program Performance and Acquisition interfaces Minimize Deconstruction

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. 4 Baseline Stability Deliverables Baseline Stability Definition ANSI/EIA 748 EVMS Guideline Adaptability Assessment Process Interface and Gap Analysis

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. Attributes of Stable Baseline Low Risk Minimal volatility and fully defined requirements Stable funding Minimal changes to the contract Milestones clearly defined Proven/mature technologies Committed resources to execute the plan Predecessors meet their commitments within the boundaries of their schedule margin. Experienced customer Work In Progress DRAFT

Copyright © 2008 Industrial Committee on Program Management. All rights reserved. Guideline Adaptability Assessment G1 WBS – the minimum levels that are extended to identify the product-oriented control account(s). G2 OBS – Adaptable to the needs of the Program life cycle. G3 Integrate planning, scheduling, budgeting, work authorization and cost accumulation processes – Adaptable to the extent G1 and G2 are set. G4 Identify the overhead organization – N/A G5 OBS/WBS Integration– Adaptable to the extent G1 and G2 are set. G6 Schedule – Adaptable from the perspective of rolling wave and/or integration. Work In Progress DRAFT