Proposed Analytical Approach - Modeling Phase 3 - Formation of new team December 9, 2003 Steering Committee Presentation.

Slides:



Advertisements
Similar presentations
Evaluation at NRCan: Information for Program Managers Strategic Evaluation Division Science & Policy Integration July 2012.
Advertisements

Phase 0 Pilot Program Jay Robinson Manager, Capital Programs (407)
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
1 Capacity mechanisms - IFIEC position June 12 th 2012.
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 GDMP Overview.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
SM Policy Objectives for Energy Storage Procurement CPUC Energy Storage OIR January 14, 2013.
The European Union’s CARDS programme for the Balkan region – Contract No This project is funded by the European Union Regional Electricity Balkan.
2007 Annual Meeting ● Assemblée annuelle 2007 Vancouver 2007 Annual Meeting ● Assemblée annuelle 2007 Vancouver Canadian Institute of Actuaries Canadian.
Queue Reform at the Midwest ISO NARUC February, 2008.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Project Detailed Business Case
Transmission Barriers to Wind Energy in the West Presented by: Pamela Jacklin Stoel Rives LLP POWER-GEN Renewable Energy & Fuels 2007 Conference Mandalay.
Economic Transmission Case Study: Champlain Wind Link Vermont System Planning Committee March 10, 2010.
Project Planning and Capital Budgeting
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Rocky Mountain Area Transmission Study Connecting the Region Today for the Energy Needs of the Future Rocky Mountain Area Transmission Study Recommendations.
ISO Exhibit 13 Federal Energy Regulatory Commission Technical Conference on Connecticut Infrastructure Reliability and Operability Committee Update Hartford,
Regional Flood Plain Management Council April 15, 2015 H-GAC December 2nd.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
1 Phases in Software Development Lecture Software Development Lifecycle Let us review the main steps –Problem Definition –Feasibility Study –Analysis.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
 Utilization of a timeline  Defining influence  Establishing members  Meet and network  ORGANIZATION!
Chapter 13: Developing and Implementing Effective Accounting Information Systems
An Asset/Liability Management Overview
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Designing Utility Regulation to Promote Investment in Cost-Effective Energy Efficiency Dale S. Bryk Natural Resources Defense Council Pennsylvania.
Federal Energy Regulatory Commission Role Of The Market Monitor: ISO New England Dr. Hung-po Chao Director, Market Monitoring FERC Open Meeting Washington,
HYDROPOWER. Objective: The student will be become familiar with the Corps policy for hydropower development. The student will be have a basic understanding.
Chapter 15 Introduction to Systems Development. Learning Objectives Learn how information systems are developed Understand importance of managing SD process.
Combined Heat and Power Workshop Report and Next Steps Power Committee Briefing 7/15/03.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Rocky Mountain Area Transmission Study Steering Committee Meeting January 13, 2003 RAWG proposed Alternatives.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
Forming a Cost Assignment/ Cost Recovery Team RMATS Steering Committee January 13, 2004.
Feasibility Study.
The Business Plan: Creating and Starting the Venture
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Atlantic Innovation Fund Round VIII February 5, 2008.
Investment decision making
Rocky Mountain States Sub-Regional Transmission Study December 9, 2003 Generation Additions Strawman.
Your Financial Toolkit: Who can provide the right financial tools for your charter school? presented by SEFCU.
The NEKIA Business Development Initiative Overview Annual Retreat Scottsdale, Arizona November 19-21, 2003.
TEXAS NODAL Market Design Structure and Process August 19, 2003.
Rocky Mountain Area Transmission Study Overall Economics of Alternatives Steering Committee Meeting April 29, SLC.
Systems Analysis and Design 5th Edition Chapter1: The Systems Analyst and Information Systems Development Prof. Salim Arfaoui 1-0© Copyright 2011 John.
FINANCIAL ANALYSIS. What is Financial Analysis? The process of evaluating businesses, projects, budgets and other finance- related entities to determine.
Value Sharing in Queensland 21 March Page 2 Copyright © 2016 Ernst & Young Australia. All Rights Reserved. Liability limited by a scheme approved.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
Future directions for recycling OzWater 2014 Paul Smith.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Operations Start-up Manager
Systems Analysis and Design in a Changing World, 4th Edition
Capital Project / Infrastructure Renewal – Making the Business Case
Reliability Assessment Committee Proposal TSS Meeting
Massachusetts Electric Restructuring Roundtable
Chapter 4 Systems Planning and Selection
Project Ideation Agile Down-to-Earth © 2016.
NEPAL ADMINISTRATIVE STAFF COLLEGE Project Appraisal: Group Works
Costing and Finance P R Upadhyay.
Evaluation by Best Value for Money Methodology
Stakeholder Engagement
Presentation transcript:

Proposed Analytical Approach - Modeling Phase 3 - Formation of new team December 9, 2003 Steering Committee Presentation

RMATS S:\MIPoffice\Strategic Analysis\WorkInProgress\RMATS\Transmission Alternatives 2 Draft Proposal RMATS Goals RMATS Deliverable: Commercially Viable Alternatives Clarify Phases 2 and 3 Scope and Approach to Modeling Form Team Cost Assignment/Recovery Issues Economically sound and technically feasible transmission alternatives Criteria and alternatives: Benefits determination Cost Assignment Cost Recovery Need Benefits/beneficiary criteria

RMATS S:\MIPoffice\Strategic Analysis\WorkInProgress\RMATS\Transmission Alternatives 3 Draft Proposal “Commercially Viable” means...  Serves the load  Technically feasible  Maintains or increases reliability/security and price stability  Adds flexibility and robustness to the RMATS network to facilitate competitive wholesale markets  Cost-effective; benefits are commensurate with risks  High probability of cost recovery; investment community is likely to look favorably upon  Likely to pass muster with state regulatory bodies  Likely to pass muster with FERC -- Draft --

Modeling phases 2 and 3

RMATS S:\MIPoffice\Strategic Analysis\WorkInProgress\RMATS\Transmission Alternatives 5 Draft Proposal To meet the RMATS deliverable, Phase 2 of the modeling should include...  Production cost modeling for the system as a whole, using ABB Market Simulator  Focus on variable costs and nodal prices of the system as whole  Two modeling steps: Step 1: Three resource/transmission alternatives to serve load, two alternatives for export. Includes two gas price sensitivities Step 2: Refined alternatives from Step 1. Includes five gas/hydro/load sensitivities  Objective: Arrive at 2-4 alternatives that appear technically feasible and economic from a variable cost/locational marginal price standpoint

RMATS S:\MIPoffice\Strategic Analysis\WorkInProgress\RMATS\Transmission Alternatives 6 Draft Proposal And Phase 3 of the modeling should include...  First-pass cost/benefit analyses for Phase 2 alternatives  Regional economic perspective  Takes into account investment and other fixed costs, as well as variable costs  Should also includes more thorough technical assessment  Sensitivities: –  Emissions/CO2 adders –  Loads –  Gas prices –  Coal prices –  Market prices –  Capex & financing costs

RMATS S:\MIPoffice\Strategic Analysis\WorkInProgress\RMATS\Transmission Alternatives 7 Draft Proposal Phase 3 continued --  Uses 2013 as analysis year; No multi-year cash flows and discounting as a full-fledged cost/benefit study would require  Approximates the beneficiaries  Takes into account findings from cost assignment/recovery team, as available Objective: Arrive at 2-4 alternatives that are “commercially viable” -- that merit detailed planning and financial consideration

Form a cost assignment/recovery team

RMATS S:\MIPoffice\Strategic Analysis\WorkInProgress\RMATS\Transmission Alternatives 9 Draft Proposal To meet the RMATS deliverable, the Steering Committee should also...  Form a cost assignment/cost recovery team  Participants: State Regulators Utilities Developer Representatives FERC staff (consultation)  Purpose: Research, develop, and evaluate cost assignment/recovery alternatives  Scope: Transmission alternatives coming out of RMATS  Reporting relationship: to RMATS Steering Team (at least initially)  Life of team may extend beyond RMATS Recommendation

RMATS S:\MIPoffice\Strategic Analysis\WorkInProgress\RMATS\Transmission Alternatives 10 Draft Proposal Issues the new team would address  Benefits Define “benefits” and “beneficiaries” for this purpose How benefits should be measured How modeling should be conducted  Cost Assignment Current regulatory policies (Federal and State) What other regions are doing Principles/criteria that should apply Methodological alternatives  Cost Recovery Issues Role and policy issues – FERC and States Regulatory impediments and risks to cost recovery What investors require Potential solutions Recommendation