HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.

Slides:



Advertisements
Similar presentations
SNS Spallation Neutrino Source 1 SNS layout GeV proton linear accelerator Accumulator ring Main target Stripping foil.
Advertisements

Tony Gabriel University of Tennessee April 19, 2013
Thomas Parker, Head of Energy Division Responsible Renewable Recyclable Thomas Parker October 2013.
ISIS Accelerator Division
CW neutron source Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus Alonso, Lali Tchelidze 6/30/11 Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Ion Accelerator Complex for MEIC January 28, 2010.
An Advanced Linear Accelerator Facility for Microelectronic Dose Rate Studies P.E. Sokol and S.Y.Lee Indiana University.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
Spallation Neutron Source Safety Program Overview
Space Charge Issues in the SNS Linac and Ring
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
HYBRIS: R. Keller Page 1 A Hybrid Ion Source Concept for a Proton Driver Front-End R. Keller, P. Luft, M. Regis, J. Wallig M. Monroy, A. Ratti, and.
R.G. – 17/03/2003 MORIOND Workshop The SPL* at CERN OUTLINE  Why ?  How ?  Roadmap  Summary * SPL = Superconducting Proton Linac A concept for.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Tuning an Accelerator for 1 MW C. Peters WAO 12 August 8 th, 2012.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
Managed by UT-Battelle for the Department of Energy Overview of Beam Instrumentations for High-Power Operation of the Spallation Neutron Source Saeed Assadi.
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
F Project X Overview Dave McGinnis October 12, 2007.
Dave McGinnis Chief Engineer – Accelerator Division
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
ISIS operational update David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC DL-RAL Joint Accelerator Workshop, RAL.
Managed by UT-Battelle for the Department of Energy SNS BLM System Overview Detectors, Measurements, Simulations Alexander Zhukov Saeed Assadi SNS/ORNL.
OFFICE OF SCIENCE The Making of the Spallation Neutron Source A 25-Year Journey Patricia Dehmer Deputy Director for Science Programs & Acting Director.
Alexander Aleksandrov Oak Ridge National Laboratory
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
Managed by UT-Battelle for the Department of Energy Residual Does Rate Analyses for the SNS Accelerator Facility I. Popova, J. Galambos HB2008 August 25-29,
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Managed by UT-Battelle for the Department of Energy Using Online Single Particle Model for SNS Accelerator Tuning Andrei Shishlo, Alexander Aleksandrov.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
SNS Operating Modes and Reliability Studies Presented at the 4 th Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-4),
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
ESS Linac Modifications for ESSnuSB Dave McGinnis Chief Engineer / Accelerator Division August 27, 2014.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
1Managed by UT-Battelle for the U.S. Department of Energy LCWA 2009, September 29, 2009 The Spallation Neutron Source Linac: Performance and Operational.
SNS Beam Diagnostics A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Beam losses and collimation at the Oak Ridge Spallation Neutron Source by Mike Plum Beam losses and collimators in transfer lines workshop Lund May 13-14,
SNS chopper - Approach to the problem, past experience at SNS and proposal for ESS specific conditions. A. Aleksandrov Spallation Neutron Source Oak Ridge,
SNS linac beam commissioning By Michael Plum Spallation Neutron Source Oak Ridge National Laboratory ESS Workshop on beam commissioning April 8-9, 2014.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
ISIS operational update
UK Neutrino Factory Conceptual Design
Alexander Aleksandrov Spallation Neutron Source Oak Ridge, USA
Uppsala Commitment to ESS and FREIA Planning
Overview and System Design for ESS LLRF Systems
Operating Experiences at SNS
1- Short pulse neutron source
Progress towards Pulsed Multi-MW CERN Proton Drivers
A Superconducting Proton/Electron Linac
EPICS Meeting March 12 – 14, 2008, Shanghai, China
HiPoSpaNS High Power Spallation Neutron Source
SNS Commissioning Mike Plum
General Issues for a Multi-MW driver
SNS-PPU upgrades the existing accelerator structure
Roger Ruber for the FREIA team 11 June 2013, Uppsala
Presentation transcript:

HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

2Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 Outline Facility overview Organization Shift schedule Operating schedule Availability

3Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 Where is SNS? Eastern Tennessee as part of Oak Ridge National Lab

4Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 What is SNS? World’s highest power pulsed spallation neutron source Consists of a 1 GeV superconducting linear accelerator, accumulator ring, and a flowing liquid mercury target Operates as a National User Facility for conducting neutron scattering research – 13 instruments in User Program – 6 in commissioning or under construction Funded by the Department of Energy’s Office of Basic Energy Sciences (~$181M/year)

5Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 Ring Instrument hall / Target building Klystron gallery Support buildings - CHL -RFTF -CUB Main office building -CCR Linac tunnel

6Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 SNS Accelerator Complex H- stripped to protons Front-End: Produce a 1- msec long, chopped, H- beam LINAC: Accelerates the beam to 1 GeV Accumulator Ring: Compress 1 msec long pulse to 700 nsec Deliver beam to Target Ion Source 2.5 MeV 1000 MeV 87 MeV CCL SRF,  =0.61 SRF,  = MeV 387 MeV DTL RFQ MHz805 MHz Recent 1 MW operating parameters  925 MeV beam energy  1.14E14 protons per pulse  60 Hz pulse rep rate  1.1 mA average current to target

7Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 SNS Accelerator Complex H- stripped to protons Front-End: Produce a 1- msec long, chopped, H- beam LINAC: Accelerates the beam to 1 GeV Accumulator Ring: Compress 1 msec long pulse to 700 nsec Deliver beam to Target Ion Source 2.5 MeV 1000 MeV 87 MeV CCL SRF,  =0.61 SRF,  = MeV 387 MeV DTL RFQ MHz805 MHz Recent 1 MW operating parameters  925 MeV beam energy  1.14E14 protons per pulse  60 Hz pulse rep rate  1.1 mA average current to target

8Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 SNS Accelerator Complex H- stripped to protons Front-End: Produce a 1- msec long, chopped, H- beam LINAC: Accelerates the beam to 1 GeV Accumulator Ring: Compress 1 msec long pulse to 700 nsec Deliver beam to Target Ion Source 2.5 MeV 1000 MeV 87 MeV CCL SRF,  =0.61 SRF,  = MeV 387 MeV DTL RFQ MHz805 MHz Recent 1 MW operating parameters  925 MeV beam energy  1.14E14 protons per pulse  60 Hz pulse rep rate  1.1 mA average current to target

9Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 SNS Accelerator Complex H- stripped to protons Front-End: Produce a 1- msec long, chopped, H- beam LINAC: Accelerates the beam to 1 GeV Accumulator Ring: Compress 1 msec long pulse to 700 nsec Deliver beam to Target Ion Source 2.5 MeV 1000 MeV 87 MeV CCL SRF,  =0.61 SRF,  = MeV 387 MeV DTL RFQ MHz805 MHz Recent 1 MW operating parameters  925 MeV beam energy  1.14E14 protons per pulse  60 Hz pulse rep rate  1.1 mA average current to target

10Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 SNS Accelerator Complex H- stripped to protons Front-End: Produce a 1- msec long, chopped, H- beam LINAC: Accelerates the beam to 1 GeV Accumulator Ring: Compress 1 msec long pulse to 700 nsec Deliver beam to Target Ion Source 2.5 MeV 1000 MeV 87 MeV CCL SRF,  =0.61 SRF,  = MeV 387 MeV DTL RFQ MHz805 MHz Recent 1 MW operating parameters  925 MeV beam energy  1.14E14 protons per pulse  60 Hz pulse rep rate  1.1 mA average current to target

11Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 Research Accelerator Division (~370) Facility Operations (70) Facility Maintenance Site Services Radiological Control Data Operations (72) Control Systems Instrument Data Acquisition and Controls Information Technology Instrument Operations (46) Instrument Support Scientific Support Sample Environment Accelerator and Target Operations (157) Electrical and RF Superconducting Linac Systems Accelerator Physics, Beam Instrumentation, Ion Source Mechanical Systems and Operations Accelerator Operations

12Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 Accelerator Operations Group (18) Operations Manager Machine Specialist Operations Coordinator Control Room Shift Supervisor (10) Control Room Accelerator Specialist (4) Maintenance & Operability Coordinator

13Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 Shift Schedules

14Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 FY12 Operating Schedule

15Managed by UT-Battelle for the U.S. Department of Energy G. Johns, WAO, Aug. 6-10, 2012 Presentation_name How are we doing? 93.6%92.1% 80.7%