Template Update on Progress of FY12-13 Work Plan Activities Presentation to the NETAC Policy and Technical Committees Sue Kemball-Cook and Greg Yarwood.

Slides:



Advertisements
Similar presentations
State Implementation Plan (SIP) Development Process Presentation to: Centralina Nonattainment Area Elected Officials and City and County Managers and Planners.
Advertisements

Clean Smokestacks Act Benefits Update Division of Air Quality March 17, /17/2010.
Rider 8 Technical Workgroup Development. Introduction - Rider 8 Program for Ozone 74 th State Legislative Session authorized and budgeted to assist areas.
Status of 8-Hour Ozone NAAQS Program in Clark County Presentation to Air Quality Forum May 10, 2005.
Ozone Modeling over the Western U.S. -- Impact of National Controls on Ozone Trends in the Future Rural/Urban Ozone in the Western United States -- March.
Transportation Conformity and Development of Emission Budgets.
Template Evaluating NOx Emission Inventories for Regulatory Air Quality Modeling using Satellite and Model Data Greg Yarwood, Sue Kemball-Cook and Jeremiah.
 Two proposals were submitted to EPA under Recovery Act Funding for National Clean Diesel Campaign (NCDC)  Both for demonstrating “EPA Emerging Technology”
Template Update on Results of FY11-12 Work Plan Activities Presentation to the NETAC Policy and Technical Committees Sue Kemball-Cook and Greg Yarwood.
Template Summary of FY12-13 Work Plan Technical Activities Sue Kemball-Cook and Greg Yarwood NETAC Technical Committee Meeting April 22, 2014.
CONGESTION MITIGATION & AIR QUALITY(CMAQ) 1.  FY2013 = $9.8 million for NE  New CMAQ Guidance, November 12, 2013  Purpose of the CMAQ Program is to.
CARBON FRACTIONS & Southern Nevada Air Quality Study (SNAQS) Judith Chow Desert Research Institute, Reno, NV February 5, 2002.
PM 2.5 Advance Path Forward Transportation Advisory Committee June 12, 2014.
Template Emission Controls Affecting Northeast Texas Presentation to the NETAC Policy and Technical Committees Sue Kemball-Cook, Krish Vijayaraghavan,
ADEQ Uses of ICF Modeling Analysis Tony Davis, Branch Manager – Air Planning Arkansas Department of Environmental Quality Criteria Pollutant Modeling Analysis.
PM Control Strategies for Mobile Sources Presentation for PM2.5 Implementation Workshop June 21, 2007 Gary Dolce U.S. EPA Office of Transportation and.
Control Measures for the 8-hour Ozone SIP Metropolitan Washington Air Quality Committee April 27, 2005.
Issues on Ozone Planning in the Western United States Prepared by the WESTAR Planning Committee for the Fall Business Meeting, Tempe, AZ October 31, 2011.
SCAP April 29, 2014 Cleaning The Air That We Breathe… Update on 2016 Air Quality Management Plan (AQMP)
1 Air Quality: Potential Impacts of Shale Development in Ohio Kevin Crist, PhD Director & Professor, Center for Air Quality Department of Chemical and.
Ozone Overview John Koswan July 11, OZONE SIP DEVELOPMENT: TASKS COMPLETED TO DATE.
Air Quality and Conformity Issues James M. Shrouds, Director Office of Natural and Human Environment Federal Highway Administration AASHTO SCOE Meeting.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
OTC Mobile Source Committee OTC Committee Meeting September 2009 Buffalo, New York 1.
Developing a Workplan for Implementing the Strategic Plan for the WRAP Board October 1, 2008.
CENRAP’s RPO Meeting Ileana Isern-Flecha, et.al March 31, 2004 Technical Analysis Division Texas Air Quality Study (TexAQS) II ( )
Oil and Gas Workgroup Summary October 21-23, 2009 Denver.
Template Improving Sources of Stratospheric Ozone and NOy and Evaluating Upper Level Transport in CAMx Chris Emery, Sue Kemball-Cook, Jaegun Jung, Jeremiah.
1 MOBILE6 -Input and Modeling Guidance -SIP and Conformity Policy North American Vehicle Emission Control Conference Atlanta, April 4, 2001 Gary Dolce.
Early Action Compacts Presented by Karen Borel EPA Region 4 March 25, 2003.
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
1 CCOS Update November 3, 2006 PC Meeting Project Status –Completed Projects Results –On-Going Projects Status Plan for CCOS Final Phase –Guiding Principles.
WRAP Regional Modeling Center April 25-26, 2006 AoH Work Group Meeting Regional Modeling Center Status Report AoH Workgroup Meeting Seattle, WA April 25-26,
St. Louis PM 2.5 SIP Modeling Update Calvin Ku, Ph.D. Missouri Department of Natural Resources Air Pollution Control Program Air Quality Advisory Committee.
1 DISCLAIMER Please note that this is a summary of a draft report of TERC Research Project H60. In order to fully respond to comments on the draft report.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
Template Briefing on FY14-15 Work Plan Technical Activities Sue Kemball-Cook and Greg Yarwood NETAC Technical Committee Meeting April 22, 2014.
Air Resources Board California Environmental Protection Agency Ozone SIP Schedule and CCOS Products Policy Committee Meeting John DaMassa April 18, 2002.
Item 14 Re view of Budget and Outline for the FY2015 Unified Planning Work Program (UPWP) 1 Gerald Miller Acting Co-Director Department of Transportation.
Conceptual Design of an Enhanced Multipurpose Aerometric Monitoring Network in Central California NOV. 15, 2002 AWMA SYMPOSIUM ON AIR QUALITY MEASUREMENT.
Mobile Source Committee Update OTC Committee Meeting September 13 th, 2012 Washington, DC 1.
Area Source Emissions Inventory Improvement Update Michael Ege, Emissions Inventory Specialist Air Quality Division Texas Commission on Environmental Quality.
1 Status Report on Greenhouse Gas (GHG) Emissions Analysis Erin Morrow & Daivamani Sivasailam TPB Technical Committee April 3, 2009 Item # 11 TPB Tech.
MWAQC Work Program and Budget FY 2006 Joan Rohlfs, Chief, AQ Planning MWAQC April 27, 2005 ITEM 7.
January 24, Update to CCAQS PC Final Projects for CCOS & CRPAQS.
Repository Design Overview Presented to: NSNFP Meeting Presented by: Joe Price Office of Repository Development April 13, 2005 Bethesda, MD.
2005 WRAP Work Plan WRAP Board Meeting Salt Lake City, UT November 10, 2004.
Technical Projects Update WRAP Board Meeting Salt Lake City, UT November 10, 2004.
SJV PM10 SIP Modeling & Data Analysis December 5, 2002 Policy Committee Meeting.
Template Photochemical Modeling of June 2012 for the HOTCOG Area Sue Kemball-Cook, Jeremiah Johnson, John Grant and Greg Yarwood November 20, 2015 Presentation.
Putting the Pieces Together OTC Fall Meeting November 2-3, 2005 Planning to Meet the SIP Submittal Deadlines.
WRAP 2003 Work Plan: Overview and IOC Elements WRAP 2003 Work Plan: Overview and IOC Elements WRAP Board Meeting November 12, 2003 Tempe, AZ Rick Sprott.
Template Summary of FY12-13 Work Plan Technical Activities Sue Kemball-Cook and Greg Yarwood NETAC Policy Committee Meeting April 22, 2014.
July 21, Today’s Proposed Action Approve ozone SIP revisions for South Coast and San Joaquin Valley Reasonable Further Progress Transportation.
CALGRID Modeling Overview A First Look A Modeling Effort by the OTC Modeling Committee Presented by: Jeffrey Underhill, Ph.D. NHDES OTC/MANE-VU Annual.
Western Regional Technical Air Quality Studies: support for Ozone and other Air Quality Planning in the West Tom Moore Air Quality Program Manager Western.
Work Items for §309 SIPs WESTAR Fall Technical Conference September 19, 2002 Tom Moore & Brian Finneran.
Air Resources Board California Environmental Protection Agency CCOS STATUS REPORT Policy Committee Meeting Saffet Tanrikulu, Ph.D. October 25, 2002.
1 Mobile Sources Work Group Final Report - PM 2.5 SIP Brian Newbacher Dir. of Public Affairs, AAA Chair, Mobile Sources Work Group June 12, 2007 NOACA.
Regional Haze SIP Template: Mobile Sources Edie Chang California Air Resources Board WESTAR Fall Technical Conference September 2002.
Next Steps: Air Quality Planning In the AACOG Region Air Improvement Resources Advisory Committee Meeting Alamo Area Council of Governments January 17,
Proposed Research Plan Fiscal Year Today’s Proposed Action Approve Fiscal Year Research Plan Allocate $6 million in four research.
1 National Standards Set for Criteria Pollutants  Particulate Matter  Sulfur Dioxide  Nitrogen Dioxide  Carbon Monoxide  Lead  Ozone.
RECOMMENDATIONS TO ENHANCE TERP PARTICIPATION IN THE NETAC AREA John Grant, Sue Kemball-Cook, Greg Yarwood 1.
Significance of Mobile Source Emissions for the Purposes of Section 309 of the Regional Haze Rule Patrick Cummins Western Governors’ Association WRAP Board.
Technical Task Update FY16-17
Ozone Transport Analysis Using Back-Trajectories and CAMx Probing Tools Sue Kemball-Cook, Greg Yarwood, Bonyoung Koo and Jeremiah Johnson, ENVIRON Jim.
Emission Control Strategy Evaluation
Daily Screening for Wildfire Impacts on Ozone using a Photochemical Model A Proposal to the Texas Near-Nonattainment Areas Greg Yarwood
Mobile Source Contributions to Ambient PM2.5 and Ozone in 2025
Presentation transcript:

Template Update on Progress of FY12-13 Work Plan Activities Presentation to the NETAC Policy and Technical Committees Sue Kemball-Cook and Greg Yarwood June 13, 2013

Haynesville Shale Mobile Source Emission Inventory Heavy-duty diesel trucks transporting water and materials to and from Haynesville well sites may be an important source of NOx emissions –Not included in NETAC’s Haynesville emission inventories Trips can occur on rural public roads and on private roads –Trips may not be fully accounted for in current on-road mobile source emission inventories Study aims to characterize the magnitude of these emissions by developing a new Haynesville Shale mobile source inventory –Is this a significant source of emissions? 2

Method and Status 2012 emission inventory year Survey developed, approved by NETAC Technical Committee, and sent to 14 producers in April, 2013 – /phone followup –1 survey has been returned Now reviewing other studies to provide additional information on truck traffic associated with natural gas production Develop emission inventory –Assess significance of on-road mobile in relation to other Haynesville sources Incorporate inventory into NETAC’s ozone modeling 3

Control Strategy Evaluation Develop a list of potential emissions control measures to be evaluated with NETAC’s ozone models To be creditable in a SIP, emissions reductions must be: –Permanent –Federally enforceable –Surplus –Quantifiable Voluntary local measures that do not meet these criteria can be considered Request that operators of large EGU/industrial sources contribute description of potential emission controls for their facilities Ozone Advance Path Forward Document 4

Ozone Modeling Reduce high bias in modeled ozone –More accurate simulation of transported versus local contribution –Sensitivity tests –AQRP project Re-run episodes using source apportionment to confirm relative importance of source regions and emission source categories Use modeling and emissions study results to develop control strategy evaluation report that can inform NETAC’s Ozone Advance Path Forward Letter –CAMx runs to guide control strategy development  What is the effect of reducing emissions from a particular emissions category on Northeast Texas ozone? Final report 5

Other Tasks Conceptual model update through the 2012 ozone season –Analysis underway, report completed by fall 2013 Review of TCEQ point, area, off-road emission inventories for 2008 –Analysis completed, report in progress 6