July 22, 2009 Sunflower Project Monthly Conversion Meeting – July.

Slides:



Advertisements
Similar presentations
RP Designs Semi-Custom e-Commerce Package. Overview RP Designs semi- custom e-commerce package is a complete website solution. Visitors can browse a catalog.
Advertisements

AmeriCorps is introducing a new online payment system for the processing of AmeriCorps forms
Module 2.4 Workforce Transition Planning and Tool March
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
Kansas SMART (Statewide Management, Accounting, and Reporting Tool) Workflow for General Ledger.
Office of Procurement February 2014 SPCC Online Reconciliation(OLR)
November 17, 2009 Sunflower Project Monthly Conversion Meeting – November.
1 Asset Management: Preparing for Fiscal Year-End Presented by Christa Hodgson.
Electronic Compliance Program-Ex-Im Online Training Overview Disbursement Request Submission October 2013.
The Act Tab (Project). Please select a button to learn more. Welcome to the Project Act Tab. Here you can Add Team Members, provide and receive Feedback,
Civil Rights Data Collection
July Interface Monthly Meeting Sunflower Project Statewide Management and Reporting Tool Update July 14, 2009.
TCRS Concord Project Employer Training. Agenda 2 Topic Objectives Why Are You Here? Project Overview What’s New Your Resources Questions Demonstration.
September 5, 2015 Office Setup. Lesson Overview: Office Setup  In this lesson we will cover:  Adding new offices to COM  Individual office setup 
FUPLOAD Training Tuesday, May 15, 2012 Mary Ward, Financial Data Administration Laura Demski, Controller’s Office.
State of Kansas INF50 Excel Voucher Upload Statewide Management, Accounting and Reporting Tool The following Desk Aid instructs users on overall functionality.
Creating a Web Site to Gather Data and Conduct Research.
State of Kansas INF50 Excel Voucher Upload Statewide Management, Accounting and Reporting Tool The following Desk Aid instructs users on overall functionality.
Agency Budget Analyst Workshop State of Indiana. 2 Instructor Theresa Anderson IOT GMIS.
RemoteNet Presented By The Systems House Inc.. Enhancements Order by multiple selling units of measure Updated the webpage’s look and feel –Style sheets.
1 Welcome to HSPA Online. 2 Measurement Incorporated Partnering with NJDOE & New Jersey School Districts.
2 Session 26 EDExpress Pell Update: What’s New in EDExpress 9.1 Pell for 2003–2004.
Sunflower Project Accounts Receivable Conversion Workshop June 16, 2009.
Identifying/Removing Obstacles Sunflower Project Statewide Financial Management System Update May 13, 2009.
MyFloridaMarketPlace Vendor Performance Tracking Overview: Requestor Interface February 23, 2006.
January 27, 2010 Sunflower Project Monthly Conversion Meeting – January.
Greta Robertson Kathy Hoffman /11/2011 SCEIS Finance Automated Interfaces.
WEBINAR Presentation for Fleet Coordinators October 3, 2006.
Sunflower Project Data Conversion Workshop May 5, 2009.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) May 14, 2009.
Home NEW INNOVATIONS Resident/Fellow Introduction NEW INNOVATIONS Resident/Fellow Introduction This presentation includes the following topics: Login Notifications.
December 17, 2009 Sunflower Project Monthly Conversion Meeting – December.
Drinking Water Infrastructure Needs Survey and Assessment 2007 Website.
1 SMART Training Update – May 2011 Michaela Butterworth.
September 23, 2009 Sunflower Project Monthly Conversion Meeting – September.
ENCOMPASS Voucher Build Process
Sunflower Project Interfaces March 25, Copyright © 2009 Accenture All Rights Reserved. Welcome.
PearsonAccess April 14, PearsonAccess – Agenda Order Tracking Additional Orders Student Data Upload (SDU) files New Student Wizard Online Testing.
MyFloridaMarketPlace MyFloridaMarketPlace User Meeting July 20, 2004.
September Interface Kickoff Sunflower Project Statewide Management and Reporting Tool Update September 02, 2009.
October 21, 2009 Sunflower Project Monthly Conversion Meeting – October.
November Interface Monthly Meeting Sunflower Project Statewide Management and Reporting Tool Update November 10, 2009.
June 11, 2009 Small Agency Meeting SMART and SH A RP Update.
Small Agency Meeting June 24, 2008 Sunflower Project Statewide Financial Management System.
Statewide Financial System Program 1 Accounts Receivable: Refresher Training Key Points Accounts Receivable: Refresher Training Key Points Welcome.
Blackboard 8: Grade Center This workshop is for existing users of Blackboard interested in keeping track of student grades online. Blackboard replaced.
April 21, 2010 Sunflower Project Monthly Conversion Meeting – April.
Vendor Bid System (VBS) Seminar. Agenda Vendor Bid System Overview Step-by-Step Advertisement Posting Editing Active Advertisements Recommended Practices.
March 24, 2010 Sunflower Project Monthly Conversion Meeting – March.
P-Card Ledger Tutorial P-Card Ledger & Reconciliation.
1 Agency Implementation Guide Walkthrough Session Maintaining Interface / COA Profiles & Reports September 28, 2009.
June 14, 2010 Sunflower Project Monthly Conversion Meeting – June.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
August 26, 2009 Sunflower Project Monthly Conversion Meeting – August.
AR350: Maintaining Customers Welcome to AR350: Maintaining Customers.
September Interface Monthly Meeting Sunflower Project Statewide Management and Reporting Tool Update September 8, 2009.
February Interface Monthly Meeting Sunflower Project Statewide Management, Accounting, and Reporting Tool Update February 10, 2010.
Sunflower Project Asset Management Conversion Workshop June 18, 2009.
January Interface Monthly Meeting Sunflower Project Statewide Management, Accounting, and Reporting Tool Update January 12, 2010.
NIMAC for Accessible Media Producers: February 2013 NIMAC 2.0 for AMPs.
Rev. May 2016 cuResearch User’s Manual. What is cuResearch? Introduction to cuResearch More information is available on the CURO website:
Financial System Upgrade Agency Change Champion Deployment Session March 16 th, 2006.
Department Impacts Workshop
P-Card Ledger Tutorial
Cindi Stinebaugh Procurement Clean-up Effort Melissa Guinn
Unit4 Customer Portal Submitting & Managing Cases.
Unit4 Partner Portal for Case Creator
Orders & Shipment Tracking
Quick reference: entering a requisition In escape RECEIVING AN ITEM
Presentation transcript:

July 22, 2009 Sunflower Project Monthly Conversion Meeting – July

2 Welcome & Introductions Fred Barnes – Data Conversion and Interfaces Lead, State Jenny Brately – Data Conversion Coordinator, Accenture Dean Arzoian – SMART Technical Team Manager, State Bruce Myers – SMART Technical Team Manager, Accenture

3 Meeting Objectives Provide information about the SMART conversion process. Explain agency conversion tasks. Communicate updates on project decisions related to conversion. Address agency questions.

4 Today’s Topics Converting into SMART Data Conversion Timeline General Conversion Updates Conversion File Layout Updates Conversion Support

5 What Is Data Conversion? One-time transition of data from an existing source (e.g., agency system, Excel spreadsheet maintained by an agency, central system) into SMART. How Is Data Converted? The Sunflower Project is using three different conversion methods: 1.Flat File Upload 2.Excel File Upload 3.Online Entry The options that are available for a particular type of data conversion vary by SMART module and data type. Converting into SMART

6 * New decision, based on results of data conversion survey (Task 215). ** TBD, based on results of data conversion survey (Task 215). SMART ModuleConversion ObjectAvailable Options Flat File Upload Excel File Upload Online Entry Accounts ReceivableCustomersYesNoYes Accounts ReceivableOpen Receivables (a.k.a. – Pending Items) YesNoYes Project CostingProjectsYesNoYes Asset ManagementAssets, except for leases*Yes No Asset ManagementLeased Assets*No Yes PurchasingOpen Purchasing Contracts not in Procurement Manager Plus TBD**NoYes Grants/Contracts No Yes Converting into SMART Agency Conversions

7 Flat File Upload How does this work? Existing agency system produces a flat file (text file) containing the data. Flat file must be in the required format, as outlined in the SMART file layout. Agencies will load the file to a secure location on the DISC mainframe for processing by SMART. Agencies will need to modify their existing system in order to transform the data and export it into a flat file. What do I need to be doing? The data mapping task, which was due 7/16, is applicable for flat file upload conversions (Task ID 37). Agencies will need to modify their system in order to transform/export the data into the required flat file format. Agencies will be required to participate in conversion connectivity testing in August. Agencies will be required to participate in iterative conversion testing cycles. The first test file is due 9/18 (Task ID 23). Converting into SMART Agency Conversions

8 Excel File Upload How does this work? Agency data is put into an Excel spreadsheet. The data entry template spreadsheet provided by the Sunflower Project needs to be used. Columns can NOT be added, removed, or moved around in the spreadsheet. Agencies will the file to SMART for processing. How will I create my Excel spreadsheet? This will differ depending on your current data source! If you have an existing “system” from which you are going to generate an Excel spreadsheet, you may need to modify that system so that it transforms/exports the data into the correct format. This could be the case if you currently track your assets in an Access database. If you currently track your assets in an Excel spreadsheet, you would need to transfer the data from that spreadsheet into the SMART data entry template spreadsheet (e.g., by copying/pasting). If you currently track your assets on paper, you would type the asset information into the data entry template spreadsheet. What do I need to be doing? The data mapping task, which was due 7/16, is applicable for excel file upload conversions (Task ID 37). Agencies will be required to participate in iterative conversion testing cycles. The first test file is due 9/18 (Task ID 23). Converting into SMART Agency Conversions

9 Online Entry How does this work? Agency enters the data directly online in SMART. The data mapping task (Task 37) is not applicable for this conversion method. Agency does not need to participate in iterative testing cycles. Guidance for data entry will be provided by the Sunflower Project at a later time. What do I need to be doing? Identify the agency resources that will perform your data entry. Converting into SMART Agency Conversions

10 Interfacing agencies are currently participating in “connectivity testing.” Agencies that are not interfacing but are converting data into SMART via a flat file upload will need to participate in a “connectivity test” in August to make sure that they can deposit/retrieve files on the DISC mainframe. We will reach out to the applicable agencies in August and ask them to complete this testing. The agencies that will be asked to complete this are those that did not complete the interface connectivity testing (the Sunflower Project has record of this) AND that have responded that they are performing flat file upload conversion(s) in the data conversion survey (Task 215). Converting into SMART Connectivity Testing

11 Data Conversion Timeline

12 General Conversion Updates Asset Management Leased Assets Leased assets will not be loaded by the flat file upload or Excel spreadsheet upload. Agencies must exclude leased assets from the flat file or spreadsheet that is provided to the Sunflower Project for loading into SMART. These assets will be entered online by agencies into SMART prior to go- live. Guidance for data entry will be provided by the Sunflower Project at a later date. The reason for this is the low volume of leases that need to be converted into SMART by agencies (as gathered in the data conversion survey, Task 215) relative to the complexity of loading leased data via a flat file upload or Excel spreadsheet upload. Timing of Asset Conversions Assets will be converted into SMART prior to go-live. This applies for all agencies, except Regents institutions.

13 General Conversion Update Purchasing Encumbrances/Purchase Orders Outstanding encumbrances will be converted from STARS to SMART by the Department of Administration. Affected encumbrances will be converted in one of two ways, determined by the original document used to record the encumbrance in STARS. Encumbrances originally recorded using a DA 118 and having no known vendor will be recorded as GL encumbrances. All other STARS encumbrances will be converted to purchase orders in SMART. The STARS encumbrance # will be converted into the PO Ref field on the SMART purchase order. Purchasing Contracts SMART Conversion Team is using results of data conversion survey (Task 215) to determine need for an Agency Conversion Workshop for purchasing contracts.

14 General Conversion Update Accounts Receivable All State agencies will be loaded as customers for each Business Unit in Accounts Receivable by the Sunflower Project. Agencies do not need to include other State agencies in their conversion effort.

15 Conversion File Layout Updates General Information Conversion file layouts have been updated and posted on the secure SMART website: How will conversion file layout changes be communicated? Bi-weekly updates Monthly Conversion Meetings – Next meetings: 8/26 and 9/23.

16 Conversion File Layout Updates Date Format The format for date fields has been changed to: MM/DD/YYYY The format for date/time stamp fields has been changed to MM/DD/YYYY HH:MM:SS: This applies to date fields on all conversion file layouts: Customers Conversion AR Pending Items Conversion Projects Conversion Assets Conversion

17 Conversion File Layout Updates Asset Management For agencies submitting a flat file, the required file format is now a pipe-delimited flat file (delimiting character: |). Tag Number no longer has to be unique within your agency/Business Unit. following fields are now optional for the conversion and are not “required”: Department ID (DEPTID) Fund (FUND_CODE) Budget Unit (BUDGET_REF) Program Code (PROGRAM_CODE) Acquisition Description field can be used to track explanatory information about the acquisition of the asset. It can also be used to track the asset's purchase order/voucher number using the following format: V########;PO:XXXXXXXX (where V######## is the voucher number and XXXXXXXX is the purchase order number).

18 Conversion File Layout Updates Asset Management – continued Detailed Description (DESCR_LONG) was added to the file layout. This field is 254 characters long and can be used to load a comment or additional information about an asset. The following fields were removed from the file layout: Color, Weight, Weight Unit of Measure, Height, Height Unit of Measure, Width, Width Unit of Measure, Length, Length Unit of Measure, Capacity, Capacity Unit of Measure, Asset Comments, Agency ID. The Short Description field (DESCRSHORT) and the Area ID field (AREA_ID) were changed so that they are not required on the conversion file The valid values for the Asset Category field (CATEGORY) were updated. The length of the Condition Code field (AM_AST_UD_CHAR1) was changed from 10 to 4 characters.

19 Conversion Support with  Include ‘Conversion’ in the Subject line of all s to us. Schedule Office Hours with the SMART Conversion Team.  to schedule an Attend Monthly Conversion Meetings. Next meetings: 8/26 and 9/23. Visit secure SMART website to obtain file layouts:  Look for ‘Click to View Documents’ link on the Technical Resources tab.  Don’t have access? Provide feedback on how we’re doing by completing the evaluation sent to you after this meeting. Refer to Questions & Answers from this meeting, posted on the SMART website  Look for ‘Questions & Answers’ under the ‘Recent updates or additions’ section of the home page.