TITRE Workshop on the Agency’s Work Programme for 2014 Ljubljana, 6 June 2013 Alberto Pototschnig - Director Christophe Gence-Creux - Head of Electricity.

Slides:



Advertisements
Similar presentations
Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)
Advertisements

TITRE Public Workshop on REMIT Ljubljana, 19 July 2012 Issues for the 2 nd edition of the ACER Guidance on the application of REMIT Volker Zuleger Seconded.
TITRE Public Workshop on REMIT Ljubljana, 19 July 2012 Public consultation document on ACER recommendations on REMIT records of transactions and implementing.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Florence Forum Third package December, The possibility given by the EC to all stakeholders to comment the ” Discussion paper on the Third Energy.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
REMIT in practice: data collection, market monitoring and stakeholder responsibilities Erik Rakhou Seconded National expert, Market Monitoring Department.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
GRI NW Stakeholder Group Meeting – 25 November 2011 GRI NW Stakeholder Group Meeting 25 November 2011 Kristóf Kovács The 2014 target and the role of the.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
The Regulation on wholesale Energy Market Integrity and Transparency (REMIT)
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
TITRE ACER Board of Regulators 6th Public Debriefing ACER Director and BoR Chair 25 February 2015, Brussels.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Click to edit Master title style 1 5 th GRI Coordination meeting Brussels, 25 th October 2011.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Energy Agency of the Republic of Serbia
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
TITRE REMIT Seminar Copenhagen, 27 April 2012 ACER and the REMIT implementation in the EU Volker Zuleger Agency for the Cooperation of Energy Regulators.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Introduction FUI SG Conference – Dublin 16 June 2010 Martin Crouch Partner – European Strategy.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Nigel Sisman,
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
European Developments Transmission Workgroup 1 st December 2011.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
European Developments Transmission Workgroup 3 rd May 2012.
REMIT IT implementation Outline. REMIT IT implementation: Overview Development of data collection and data sharing solution Implementation and customisation.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
TITRE ACER: Mission, Structure and Activities Alberto Pototschnig Director E-Control Energy Dialogue Vienna, 7 December 2011.
Gas Regional Initiative South South-East
Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
ACER’s view on the future role of the Gas Regional Initiative
WG Belgian Grid Implementation Network Codes.
Update on European Network Codes
ACER Board of Regulators 6th Public Debriefing ACER Director and BoR Chair 25 February 2015, Brussels TITRE.
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Steven Gordon ACER Gas Department
Gas Regional Initiative South South-East
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
ACER’s view on the future role of the Gas Regional Initiative
Gas Regional Initiative South South-East
Presentation transcript:

TITRE Workshop on the Agency’s Work Programme for 2014 Ljubljana, 6 June 2013 Alberto Pototschnig - Director Christophe Gence-Creux - Head of Electricity dpt. Dennis Hesseling - Head of Gas dpt. Volker Zuleger - Head of Market Monitoring dpt. Andrej Beloglavec – Director’s office

ACER – An Expanding Role Third Energy Package REMIT TEN-E Regulation ORIGINAL MANDATE TWO NEW MAJOR PIECES OF LEGISLATION confirm ACER’s growing responsibilities These are reflected in the Four Themes of the 2014 Work Programme 2

. The Agency being assigned the human and financial resources on which the Work Programme is based Implementation of WP depends on ACER WORK PROGRAMME 2014

Network Codes Early Implementation Internal Market Monitoring Themes of ACER WP 2014 Completing REMIT Implementation Wholesale Market Monitoring TEN-E Regulation Implementation TYNDPs Enhancement of the Electricity and Gas Target Models Theme 1: 2014 Market Integration Target Theme 3: The Infrastructure Challenge Theme 2: Wholesale Energy Market Integrity and Transparency Theme 4: Future Challenges, including RES Integration Challenge 4

Theme 1 - Market Integration: FG & NC State of Play. 8 Network Code (NC) priority areas identified by the Commission in 2011 to support the IEM integration by ACER has already issued 7 Framework Guidelines (FG) √ The 8 th FG is expected by November 2013 ➦ NCs in 4 areas already recommended for adoption √ Significant further progress expected this year ➦ FGNCRORecomm.Adopted Grid Connections√√√√ Cap. Allocat. and Cong. Manag.√√√√ System Operation√√ ➦➦ Balancing√ ➦ Capacity Allocation Mechanisms√√√√ Balancing√√√√ Interoper. and Data Exchange√ ➦ Harmon. Trans. Tariff Structures ➦ Electricity Gas 5

European Council conclusions: Priority to “speeding up the adoption and implementation of remaining network codes”. Complete work on NCs in all 8 priority areas and recommend them to the European Commission for adoption:. Reasoned Opinions and Recommendations on Network Codes. Support the Comitology Process. Scoping (and drafting FG in) new areas:. Rules for Trading in Gas. Incremental Capacity in Gas Theme 1 - Market Integration: FG & NC 6

Electricity TitleIssuedNC Submitted ACER RO/QR/ Recomm/QR NC Adopted Grid Connections RfG DCC HVDC Q QR R Q2/Q / Capacity Alloc. and Cong. Manag CACM FCA Q3/Q QR Q / System Operations OS OPS LFCR Q ERP OT RO RO< Q / Balancing BA Q4 2013Q / Theme 1 - Market Integration: FG & NC

Theme 1 NC Electricity 8 1.Reasoned opinion and Recommendation on the Network Code on electricity balancing 2.Reasoned opinion and Recommendation on the Network Code on HVDC connections 3.Reasoned opinion and Recommendation on the Network Code on operational procedures in emergency 4.Preparation for and monitoring of the implementation of the adopted Network Codes

Theme 1 NC Electricity 9. Early implementation will continue for Capacity allocation and congestion management and Balancing State of Play. Long-term: auction rules to be defined by March 2014 and implemented by 1 January Day-ahead: delayed, but Nov 2013 “go live” target for NWE and 2014 EU-wide coupling goal still achievable. Intra-day: key to accommodate RES. PXs failed to agree on the IT Platform. ACER to issue an informal opinion, which PXs have committed to follow

TitleIssuedNC Submitted ACER RO/ Recomm/QR NC Adopted Capacity Allocation Mechanisms RO QR Approval Gas Com Q Balancing RO Rec / Interoperability + Data Exch RO Rec. Q4/13 - Q1/14 / Harmonised Transmission Tariffs Rules Q RO Q Rec. Q / Theme 1 - Market Integration: FG & NC Gas

Theme 1 NC Gas 11 1.Reasoned opinion and Recommendation on the Network Code on rules regarding harmonised transmission tariff structures 2.Preparation for and monitoring of the implementation of the adopted Network Codes 3.Drafting amendments for the relevant network codes related to incremental capacity 4.Scoping of rules for trading related to technical and operational provisions of network access services and system balancing

. Early implementation will continue for Capacity allocation mechanisms State of Play. Coordinated auction-based allocation of a common set of bundled capacity products at all Interconnection Points at regional level Theme 1 NC Gas 12

Internal Energy Market – Cross-sectoral (Electricity and Gas. In 2014 the Agency will publish a market monitoring report covering: - Retail prices in electricity and natural gas - Wholesale market integration - Access to networks (including electricity produced or gas sourced from renewable energy sources) - Compliance with consumer rights Theme 1 - Market Integration 13

Regional Initiatives – Cross-sectoral (Electricity and Gas). The Agency coordinates the Regional Initiatives (ERI and GRI) and monitors the implementation of regional and cross-regional projects developed in this frame. In 2014 towards the Agency will publish: - The Regional Initiatives Annual Status Review Report - On-line quarterly reports on the activities of the Electricity Regional Initiative and the Gas Regional Initiative ( besides coordinating and monitoring activities for the early implementation of Network Codes) Theme 1 - Market Integration 14

Theme 2 - REMIT Actively preparing for Market Monitoring REMIT entered into force on 28 December 2011 Prohibitions of Market Abuse: -Market Manipulation -Attempted Market Manipulation -Insider Trading Obligations: -to Publish Inside Information -to notify ACER of delays in the publication of Inside Information -to establish effective arrangements and procedures to identify breaches of Market Abuse prohibitions -to notify NRAs of suspected breaches of Market Abuse prohibitions These Prohibitions and Obligations already apply 15

REMIT entered into force on 28 December 2011 Registration Platform ready in Q Market Monitoring Solution Development launched in Q and ongoing Pilot Project on Data collection, data sharing and market monitoring (full cycle) ACER’s REMIT Information System Development Theme 2 - REMIT Actively preparing for Market Monitoring 16

. Completion of the Monitoring Platform. Tier 1: Data Sourcing. Tier 2: Data Cleaning. Tier 3: Surveillance System. Tier 4: Data Exchange. Activation of Systematic Wholesale Market Monitoring. Timing dependent on Adoption of Implementing Acts. Approach dependent on available resources Theme 2: REMIT Preparing to Go-live in

Wholesale Market Monitoring Approach Data Acquisition Trade Data Fundamental Data Preliminary analysis of “Anomalous Events” Notification of “Suspicious Events” to NRA(s) Coordination of NRAs (if needed) Automatic Screening to identify “Anomalous Events” Monitoring Methodology: “Anomalous Events” definition 18

Guidance on the application of REMIT Definitions (2 Editions issued so far) Recommendations to the Commission on the Records of Transactions required for effective monitoring, to be defined in Implementing Acts Definition of Reporting requirements and standards REMIT application, Definition of Reporting Requirements, Standards and Procedures Actively preparing for Market Monitoring Theme 2 - REMIT REMIT entered into force on 28 December 2011 Monitoring Platform Development 19

Policy Documents Document Legal basis Public Consult. Issued Guidance on the application of REMIT definitions – 1 st Edition 16(1)n/a20 Dec 2011 Format for the Registration of Market Participants (CEREMP) 9(3)Apr-May Jun 2012 Guidance on the application of REMIT - 2 nd Edition 16(1)n/a28 Sep 2012 Recommendations to the EC on the Records of Transactions 7(3)Jun-Aug Oct 2012 Recommendations to the EC on the Records of Transactions (balancing and capacity markets) 7(3)Jun-Aug Mar 2013 Guidance on the REMIT application - Update of 2 nd Edition 16(1)n/a24 April 2013 RRM and RIS registration guidelines12(1)Mar-May 2013Exp.Q Guidance on the application of REMIT - 3 rd Edition 16(1)n/aExp.Q Registration and Transaction Reporting User Manuals 12(1)n/aExp. Q Guidance on the application of REMIT – 4 th Edition 16(1)n/aExp. Q2 2014

IT Implementation Timeline Q1 Q2 Q3Q4 Q1 Q2 Development of the Registration System Design Study for MM SW Development of the Mkt Monitoring System Development of data collection/sharing solutions GO LIVE ACER Pilot Project REMIT

Theme 3 – The Infrastructure Challenge. Opinions on (electricity and gas) methodologies for cost-benefit analysis (CBA) of infrastructure projects. Guidance and Recommendation on Incentives and Risk Assessment. Guidance on Cross-border cost allocation methodology. Annual consolidated report on progress of projects of common interest and recommendations to facilitate the implementation and overcoming delays/difficulties in PCI implementation (if necessary) 22

Theme 4 – Future Challenges and RES European Council conclusions: “the deployment of renewable energy sources will continue, while ensuring their cost reflectiveness [and] further market integration”. Review of the Electricity and Gas Target Models State of Play. Detailed Target Model for the Internal Electricity Market. Broader Target Model for the Internal Gas Market. These Target Models represent robust starting points for any evolution to handle the increasing penetration of renewable-based electricity generation:. Greater flexibility in electricity and gas markets required. Resource adequacy concerns in electricity generation 23

Next steps The 2014 Work Programme Outline is available on the ACER Website: Deadline for Stakeholders to submit comments on the 2014 Work Programme Outline 14 Jun 30 Jun The 2014 Work Programme is submitted by the Director to the BoR, the EP and the EC 1 Sep The Board of Regulators approves the 2014 Work Programme 30 Sep The Administrative Board, after consulting the EC, adopts the 2014 Work Programme approved by the BoR, and transmits it to the EP, the Council and the EC 24

Thank you for your attention Thank you for your attention!