Consumer’s Main Switchroom & Main L.V. Switchboard

Slides:



Advertisements
Similar presentations
Introduction to Switchgear
Advertisements

MEP201 Mechanical Engineering Drawing 1st semester
Basic electrical circuitry & applications
Chapter 12 Transformers. Chapter 12 Transformers.
10 The Service Entrance. 10 The Service Entrance.
EE4503 Electrical Systems Design
Landon Roberts Lighting/Electrical Option 11/01/07 Medical Education Building Johns Hopkins University School of Medicine Electrical Systems Existing Conditions.
CIRCUIT ARRANGEMENT (Note: All the mentioned tables in this course refer to, unless otherwise specified, Low Voltage Electrical Installation Handbook,
Chapter 2 ELECTRICAL POWER SUPPLY AND DISTRIBUTION IN BUILDINGS
EET Survey of Electronics Chapter 7 - Simple Series, and Parallel circuits.
EET Survey of Electronics
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
Electrical Power Systems
EE4503 Electrical Systems Design
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
Chapter 1 Aircraft Electrical System. Chapter 1 Aircraft Electrical system Electrical component Storage Battery DC & AC Generator Control and Protection.
Electric Circuits And Voltage
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
Components, Symbols, and Circuitry of Air-Conditioning Wiring Diagrams
PowerPoint ® Presentation Chapter 12 Utility Interconnection Distributed Generation Generators Inverters Interconnection Codes and Standards Interconnection.
1 Introduction to Power Systems Expensive! Influential!Intrusive! Source: Riadh W. Y. Habash, Electromagnetic Fields and Radiation, Marcel Dekker, New.
Copyright 2005 Ted "Smitty" Smith Two Minute Drill Number Three Improving your skill in code Look Up Increasing Speed Drill.
Protection against Electric Shock (Note: All the mentioned tables in this course refer to, unless otherwise specified, Low Voltage Electrical Installation.
HVACR116 – Trade Skills Mechanical Drawings.
Objectives Review electric circuits and electricity pricing - Introduce HW5 Select conductor and conduit List electrical devices.
MINIMUM ACCEPTABLE LEVELS OF SAFETY & RELIABILITY
Electrical Installation 2
Electrical Contractor
T H E U N I N T E R R U P T I B L E P O W E R P R O V I D E R SineWave - Installation rules.
COMMERCIAL ELECTRICAL (Chapter 11)
Physics Chapter 20: Circuits and Circuit Elements.
CHAPTER 2 FINAL CIRCUIT AND LOAD ESTIMATION
Topic 7 - Electricity in the Home Transmission of Electricity Power Grid Transformers are used to change the amount of voltage with hardly any energy loss.
All rights reserved MV SWITCHGEAR.
Auxiliary Power Supply System By CGS Gunasekara. Content Why auxiliary supply is needed ? Equipments supplied through auxillary. Modes of operation. Demonstration.
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
NGfL CYMRU GCaD ELECTRICAL WORKS DISCLAIMER Neither WJEC or NGfL accepts any responsibility whatsoever for any injury, however caused,
Electricity and Electric Circuits
Current Electricity and Electric Circuits
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Submitted to: Submitted by:
Introduction to switchgears
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
SERVICE ENTRANCE EQUIPMENT
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
ELECTRICAL INSTALLATION IN BUILDING
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
Switches and Over Current Protective Devices Class Instructor ALPHER E. DE VERA, uap.
+ Electric Circuits Parallel Circuits and Diagrams.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Sub Station.
SUB-STATIONS.
Special-Purpose Outlets— Electric Heating, Air Conditioning
Chapter # 25 Sub-Stations risemark.pbworks.com.
Current Electricity and Electric Circuits
Engineering Project Cable Management.
Unit 2.4 Electric Circuits
EET 323 – Electrical System Design Lecture 9: Grounding
EET 323 – Electrical System Design Lecture 11: Panel-boards and Switch-boards Instructor: Radian Belu, PhD.
Smitty’s Two Minute Drill Grounding and Bonding
Electrical components and systems
Electrical components and systems
Electrical components and systems
Electric Circuits.
Presentation transcript:

Consumer’s Main Switchroom & Main L.V. Switchboard Learning outcome from this topic, the student is able to state the functions and requirements of a main switchroom state the functions and requirements of a main switchboard sketch a single-line LV supply diagram from a main switchboard to different parts of a building describe different tests for a switchboard (the type tests and routine tests)

Consumer’s Main Switchroom General requirements for main switchroom Sufficient space for work and to house the main switchboard and other distribution equipment (600mm for switchgear ≤ 100A, 900mm for those >100A) Next to transformer room Supply taking from a LV network, the room should be at the building entrance Clear access Good ventilation Minimum illumination: Floor – 150 lx, wall: 120 lx No water or drainage pipes inside

Consumer’s Main Switchroom Function of a main switchroom power is taken from a transformer room power distribution to different parts of a building and for different usages separate the consumer side from the power company

Layout of cubicle-type main switchboard Components in a main switchboard Body built with 2 mm-thick steel and coated with suitable paint A busbar compartment with hard drawn copper and high conductivity to BS1432 or BS1433 Compartment for the incoming and outgoing cables Neat internal wiring and with sufficient clearance A compartment housing ACB, MCCB, fuseswitch, motor starter, capacitor bank, auto-changeover switch A meter compartment to show the energy consumption or maximum demand

Layout of cubicle-type main switchboard Components in a main switchboard Measuring CTs and protection CTs Meters showing current, voltage, power factor (and max. demand), etc. Now A digital multi-purpose is used for all IDMT relays for overcurrent and earth-fault protection (Now a digital relay) Charger and battery for closing/tripping of ACBs Phase indication lamps Anti-condensation heaters Spare compartments

Layout of cubicle-type main switchboard The main switch in a switchboard For three-phase 4-wire supply, a triple-pole & neutral (TP&N) main switch (or circuit breaker) is used The TP&N switch should interrupt all the phase conductors (R/Y/B) A link (fixed by bolts or screws) should be inserted in the neutral conductor For single-phase installations, a double-pole (DP) main switch should be used

Layout of cubicle-type main switchboard If the supply is taken directly from a transformer room, the main incoming ACB should be of draw-out type should have a breaking capacity at least 40 kA should be equipped with overcurrent & earth-fault protective relays For an overall installation serving more than one building, the installation in each building should be treated as a separate installation. Each building should have a main switch.

Load Distribution in a Building Refer to slide 10 for illustration Tenant Supply Board Connection to a transformer Main incoming circuit breaker (ACB/MCCB) for overload and fault protections to the whole installation Busducts leading to different load centres in the building Bus section switch interconnects adjacent busbar section Non-essential Public Supply Board Bus section for the power supply to public facilities Plumbing and drainage pumps, passenger lifts, non-essential lighting, A/C plant and spares, etc Cable risers to different loads in the building Protective devices for cable overload protection

Load Distribution in a Building Emergency Supply Board Connection with an emergency generator / UPS ACB, MCCB, fuseswitch for overload and / or fault protections to essential loads Automatic changeover switch Two mutually exclusive switches Normal open (N/O) Normal close (N/C) Switch ON/OFF Sprinkler pumps, hydrant / hose reel pumps, firemen’s lifts, emergency lighting and spares, etc A single-line low voltage schematic for the power distribution to different loads in a building is shown on slide 11

A single-line LV schematics

L.V. Switchboard

Air Circuit Breaker (ACB)