Mejoras en los sistemas de Agua Potable y Saneamiento en San Benito, Texas Water and Wastewater Facility Improvements in San Benito, Texas.

Slides:



Advertisements
Similar presentations
Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
Advertisements

This is a manual presentation. Click NEXT for the next slide, BACK for the previous slide.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
What is NPDES? “National Pollutant Discharge Elimination System”
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
 Why  Project Status  Future Course Lime Sludge Biosolids Water/Wastewater System Life Cycle Raw Water Wells (12) Water Treatment Plant Storage Tanks.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
Rapid Assessment Process Project Strategic Plan City of Alamo Municipal Water and Wastewater Project Hidalgo County, Texas Presented to: Project Sponsor.
Federal, state and local government entities working together to meet the health, welfare and public safety needs of Wyoming’s citizens. January 11, 2011.
Scope of Work  Review financial performance  Recommend rate adjustments  Prepare grant or loan applications.
Effectively Managing Your Water System Project Rural Community Assistance Partnership Practical solutions for improving rural communities © 2012 All rights.
State Financing Programs for Brownfield Redevelopment.
National Pollutant Discharge Elimination System(NPDES) Permit.
Niland Sanitary District Rapid Assessment Process Project Strategic Plan Niland Sanitary District Wastewater Systems Improvements Niland, California Presented.
Rapid Assessment Process Project Strategic Plan Doña Ana MDWCA Water and Wastewater System Improvements Doña Ana County, NM Presented to: Stakeholders.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
City of Lordsburg Rapid Assessment Process Project Strategic Plan City of Lordsburg Water and Wastewater System Improvements Lordsburg, New Mexico Presented.
Water & Waste Disposal Loans and Grants The funding purpose is to construct, enlarge, extend or improve water, wastewater and solid waste systems in rural.
Rapid Assessment Process Preliminary Project Plan City of Alpine, Texas Public Water and Wastewater System Improvements Presented to: Texas Agencies February.
Clean Energy and Air Quality Improvement Project Rio Grande Valley Sugar Growers Association, Inc. (RGVSG) Santa Rosa, Texas Jan. 28, 2003.
Project History Town of Newport Population: 550 Vermillion County Seat.
Rapid Assessment Process Project Strategic Plan City of Marfa Water and Wastewater System Improvements Marfa, Texas Presented to: Stakeholders and Project.
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
BECC Certification Criteria. Our Role in the US/Mexico Border  The Border Environment Cooperation Commission and the North American Development Bank.
City of San Luis, Arizona Rapid Assessment Process Project Strategic Plan City of San Luis Water & Wastewater Improvements Yuma County, Arizona Presented.
Proposed SAHA Fiscal Year Consolidated Budget.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
VI. Developing a VSMP Program General Stormwater Training Workshop.
City of Calipatria Rapid Assessment Process Project Strategic Plan City of Calipatria Wastewater Systems Improvements Calipatria, California Presented.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
Rapid Assessment Process Project Strategic Plan Village of Columbus Water Supply and System Improvements Luna County, New Mexico Presented to: Stakeholders.
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
The SMART Goal, Program Concepts and Outcomes A NESC and RCAP partnered, EPA funded program using Social Marketing techniques to invigorate small community.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
INVESTMENT IN MENTAL HEALTH WELLNESS GRANT PROGRAM INVESTMENT IN MENTAL HEALTH WELLNESS GRANT PROGRAM CALIFORNIA HEALTH FACILITIES FINANCING AUTHORITY.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
Time is money. Use yours wisely. Bryan McCabe, PE | Pender County Utilities J. Ray Cox, PE | Highfill Infrastructure Engineering.
Hexavalent Chromium MCL Regulation Guidance Eric Zuniga, PE San Bernardino District SWRCB – DDW.
CarolloTemplateWaterWave.pptx City of Bainbridge Island Water System Plan Policy Discussion April 21, 2015.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
Administration Code Changes to Incorporate Graywater Policy Principles Jayne Joy, P.E. Director, Environmental & Regulatory Compliance January 2016 EASTERN.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
Showcase cost-saving practices, scale- appropriate technologies, and economic development opportunities and case studies from Idaho communities. Provide.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Water Quality Facts John Shirey City Manager William Busath, P.E. Director of Utilities Pravani Vandeyar Water Quality Superintendent.
1 City of Cocoa Michael Burton - President Andrew Burnham - Sr. Vice President Eric Grau - Project Consultant Presented by: Water, Sewer & Reclaimed Water.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
Environmental Health Service Learning and Water Quality in Gales Point, Belize International Health and Human Service Learning Program Belize 2009 College.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
CP-TXT Amendment to the Capital Improvements Element (Annual Update) September 25, 2007.
Kings Bluff Raw Water System Parallel Raw Water Main Project
National Environmental Policy Act of 1969
CP-TXT Amendment to the Capital Improvements Element & Public School Facilities Element (Annual Update) October 2008.
PLANNING DOCUMENTS 2018 New Mexico infrastructure finance conference
October 29, 2018 Terry Lauritsen, P.E.
City Council Business Meeting
Presentation transcript:

Mejoras en los sistemas de Agua Potable y Saneamiento en San Benito, Texas Water and Wastewater Facility Improvements in San Benito, Texas

Project Location Ubicación del Proyecto Population year 2000: 27,686 Population year 2025: 40,240 Population growth rate: 17% between % between Average Water Consumption: 126 gpcd Infrastructure coverage: Potable Water 100% Sewer Collection 100% Wastewater treatment 100%

BECC General Criteria Criterio General de COCEF 1.Water and Wastewater Treatment 2. Project located within 62 miles of the U.S./Mexico border 3. The WTP and WWTP will provide a secure water supply and a safe wastewater treatment to the citizens of San Benito, Texas

Background Antecedentes Water Treatment Plant

Background Antecedentes Water Treatment Plant

Project Components Componentes del Proyecto Construction of a 10 MGD WTP (6 MGD first phase) Construction of two 16-inch transmission lines 1 MG elevated storage tank Construction of a 5 MGD WWTP ( 2.5 MGD first phase)

WTP planta potabilizadora Water Treatment Plant

Project Components Componentes del proyecto Elevated Storage Tank Jefferson St.

Project Components Componentes del proyecto Wastewater Treatment Plant (lagoon)

Human Health & Environment Criteria Criterio de Salud Humana y Medio Ambiente 1. Human Health and Environmental need The WTP exceeded maximum permitted treatment capacity, with a resulting TNRCC issuance of an Enforcement Order. An EPA Administrative Order for violation of permitted treatment parameters for BOD and TSS has been issued for the WWTP. Existing elevated storage facilities, doesn’t meet TNRCC’s minimum standards.

Human Health & Environment Criteria Criterio de Salud Humana y Medio Ambiente Reported Waterborne Disease Cases (Cameron County) Disease Cases Year Amebiasis Campylobacteriosis Salmonelosis Shigelosis Hepatitis A Hepatitis B Hepatitis C 4130

Human Health & Environment Criteria Criterio de Salud Humana y Medio Ambiente 2. Environmental Assesment An EID was prepared in accordance with State and Federal requirements. The USEPA reviewed the EID. The FONSI was issued on August 8, Compliance with Applicable Environmental and Cultural Resource Laws and Regulations Coordination with relevant State and Federal Agencies was made. Project approval responses were obtained from all agencies contacted. The project is in compliance with all applicable environmental and cultural resource laws and regulations.

Human Health & Environment Criteria Criterio de Salud Humana y Medio Ambiente Wastewater Treatment Plant discharge

Human Health & Environment Criteria Criterio de Salud Humana y Medio Ambiente Elevated Storage Tank Jefferson St.

1. Appropriate Technology Both WTP and WWTP will utilize standard treatment process. WTP will include coagulation, sedimentation, clarification, filtration, and chlorination. WWTP will be an extended aeration system adjacent to the existing lagoon. 2. O & M Plan The consultant will be responsible for the development of the O&M manuals. These manuals will be completed prior to completion of construction. Operation personel will receive training prior to the start up of the WTP and WWTP. 3. Compliance with applicable design norms and regulations The TNRCC and TWDB will review the design of the entire project, which must meet State design criteria. Permits will be required for both WTP and WWTP. Technical Feasibility Factibilidad Técnica

Technical Feasibility Factibilidad Técnica Existing WTP Existing elevated storage tank New elevated storage tank New WTP

Financial Feasibility Factibilidad Financiera Concept Amount US$ Water Treatment Plant Elevated Storage Tank 18,069,852 3,861,447 Wastewater Treatment Plant 10,512,936 Total$32,444,235

Financial Feasibility Factibilidad Financiera SourceAmount (US$) % Texas Water Development Board (loan) BEIF construction (grant) 17,533, ,910,88446 Total$32,444,235100% BEIF Transition Assistance funds $2,999,341

Financial Feasibility Factibilidad Financiera Single Family Rates YEAR WATER SEWER TOTAL 2003 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Average water bill 33 US$ for 8,000 gal/month

1. Comprehensive Public Participation Plan Steering Committee formed on January, Public Participation Plan submitted and approved by BECC in January Public Information Facility Plan and Step II Document available for public review at City Hall and local library 30 days prior to the first public meeting. Committee carried out 28 presentations to local organizations. Fact sheets available at meetings, handed to customers, and delivered via mail. Newspaper and television coverage of project. Public meetings held in February, June and July Community Participation Participación Comunitaria

Community Participation Participación Comunitaria Public meeting

Community Participation Participación Comunitaria Steering Committee

The project complies with BECC’s definition of Sustainable Development. Sustainable Development Desarrollo Sustentable 2. Institutional and Human Building The project will build institutional capacity by the creation of fund reserves for any potential emergencies, and training to the plant operators. 3. Conformance with Applicable Local/Regional Conservation and Development Plans The project is in conformance with the Water and Wastewater Master Plan developed by the city in The city has a Water Conservacion and Drought Contingency Plan. 1. Definition and Principles 4. Natural Resources Conservation The project will improve the water quality in the discharge to the Arroyo Colorado. 5. Community Development The project will provide sufficient capacity to serve exisiting customers and the city will be able to manage growth within its available resources.

Staff Recommendation Recomendación del Personal Considering the previous information based on the project developed, BECC Staff recommends: the “Water and Wastewater Facility Improvements in San Benito, Texas” for certification

Sustainable Development Desarrollo Sustentable Front view of the Water Treatment Plant