Design status 2 mrad IR Current plan for finalization in 2008 Philip Bambade LAL-Orsay On behalf of: D.Angal-Kalinin, R.Appleby, F.Jackson, D.Toprek (Cockcroft)

Slides:



Advertisements
Similar presentations
Ideas and Speculations for the Headon Extraction Line L. Keller Oct. 19, Give up the 3.5 m Separation between the Charged Dump and the Incoming.
Advertisements

Zero Degree Extraction using an Electrostatic Separator Take another look at using an electrostatic separator and a weak dipole to allow a zero degree.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
January 2004 GLC/NLC – X-Band Linear Collider Peter Tenenbaum Beam Dynamics of the IR: The Solenoid, the Crossing Angle, The Crab Cavity, and All That.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
NLC - The Next Linear Collider Project NLC IP Layout What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
1 4 Oct 05 Optimization of anti-DID for SiD, GLD and LDC A.Seryi October 4, 2005.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
ILC Machine-Detector Interface Challenges Philip Bambade LAL-Orsay Workshop on the Future Linear Collider Gandia, Spain, December 1, 2005.
SUSY small angle electron tagging requirements Philip Bambade LAL-Orsay MDI workshop - SLAC 6-8 January 2005 With M. Berggren, F. Richard, Z. Zhang + DESY.
LCWS ’05 Machine Detector Interface Design Updates Tom Markiewicz SLAC 22 March 2005.
1 August 12, 2005 Running 2mrad IR in e-e- mode: BDS constraints A.Seryi August 12, 2005.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
1 27 Sep 05 Discussion of anti-DID ( “DIDNT” ? ) A.Seryi September 27, 2005.
IP crossing-angle and LC technology recommendation Philip Bambade LAL, Orsay 5 th ITRP meeting, Caltech, USA Session on detector & physics issues June.
1 ATF2 Tuning and its application to ILC and CLIC FFS/IR region ASTeC and MAN : working together on tuning methods for the ATF2 and ILC IR/extraction design.
ILC Beam Delivery System Layout and Lattice Design Deepa Angal-Kalinin ASTeC, Cockcroft Institute Cockcroft Institute SAC th November 2006.
Overview of Extraction Line Designs and Issues
August 2005Snowmass Workshop IP Instrumentation Wolfgang Lohmann, DESY Measurement of: Luminosity (precise and fast) Energy Polarisation.
EUROTeV Scientific Workshop, 26-29th August'081 Small crossing angle designs for the ILC Deepa Angal-Kalinin Daresbury Laboratory, UK.
CLIC main detector solenoid and anti-solenoid impact B. Dalena, A. Bartalesi, R. Appleby, H. Gerwig, D. Swoboda, M. Modena, D. Schulte, R. Tomás.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
Backgrounds in the NLC BDS ISG9 December 10 – Takashi Maruyama SLAC.
LDC Meeting Vienna 17. November 2005 Karsten Büßer LDC Machine Detector Interface Update.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
Philip Bambade - LALLCWS04 - MDI 20/4/20041 Crossing-angle-or-not physics implications report from phone-meeting cold half-angle = 10, 4, 1, 0.3,……
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
ILC-GDE Meeting Beijing Feb Effect of MDI Design on BDS Collimation Depth Frank Jackson ASTeC Daresbury Laboratory Cockcroft Institute.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
LET in the ILC DRs with Minimal Tuning Knobs and other assorted information James Jones Deepa Angal-Kalinin and Frank Jackson.
Ken Moffeit SLAC LCWA09 1 Polarization Considerations for CLIC Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October.
16 February 2009CLIC Physics & Detectors Konrad Elsener 1... some issues regarding the forward region... (“picking up” from Lucie Linssen, 29 Sept 2008)
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
September 2007SLAC IR WS Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY Talks by M. Morse, W. Wierba, myself.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Octobre 2007LAL Orsay Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
1 April 1 st, 2003 O. Napoly, ECFA-DESY Amsterdam Design of a new Final Focus System with l* = 4,5 m J. Payet, O. Napoly CEA/Saclay.
Re-design of extraction line for single stage BC
M. Sullivan for the SLAC SuperB Workshop Jan , 2009
Layout of Detectors for CLIC
The Interaction Region
Beam Delivery update Andrei Seryi December 12, 2005
The small crossing angle layout - where are we and what do we do now?
AD & I : BDS Lattice Design Changes
The PEP-II Interaction e+e- Factories Workshop
Updates on IR and FF for super-B factory
The 2mrad horizontal crossing angle IR layout for the ILC
Design status 2 mrad IR Current plan for finalization in 2008
The 2mrad crossing angle alternative
EIC Accelerator Collaboration Meeting
JLEIC Electron Ring Nonlinear Dynamics Work Plan
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

Design status 2 mrad IR Current plan for finalization in 2008 Philip Bambade LAL-Orsay On behalf of: D.Angal-Kalinin, R.Appleby, F.Jackson, D.Toprek (Cockcroft) P.B., S.Cavalier, O.Dadoun, M.Lacroix (LAL-Orsay) ILC EDR BDS-KOM, SLAC, October 11-13, 2007

Outline Motivations Status of “minimal” redesign Current plans and aims Concluding remarks ….………. Alternative IP luminometry & polarimetry idea ?

Motivations for 2 mrad  Large crossing-angle : 1. Eases post-IP beam extraction & transport  diagnostics 2. But adds pre-IP constraints : crab-cavity control & tuning, non-axial solenoid + DID / anti-DID  pre / post-IP trajectory bumps  Physics & detector advantaged by small crossing-angle IR : simpler forward geometries, better hermeticity, no DID / anti-DID  Head-on IR a priori nicest  needs large electrostatic separators  2 mrad scheme : no crab-cavity (initially…), no electrostatic separators and order-of-magnitude smaller pre / post-IP trajectory bumps  Snowmass 2 mrad design unsatisfactory  redesign with simpler concept aiming to be as short & economical as possible  Assumption : other ways than the present spent-beam spectrometry & polarimetry possible if planned pre-IP measurements need complementing  Minimise costs and mitigate technical risks

Length ~ 300 m dump(s): 0.5 m 3 m New “minimal” extraction line concept QF, SF warm quad & sext QD, SD NbTi (Nb3Sn) SC FDFD 3 warm bends 2 “Panofsky” quads collimators |  Explicit goals : short & economical, as few and feasible magnets as possible, more tolerant and flexible Beam rastering kickers can be placed to prevent water boiling and window damage kickers BB1,2 BHEX1 Extraction line has been integrated with the FFS flexible

Optimised compact final doublets Re-designed with acceptable losses and stay-clear for in / out charged & beamstrahlung beams  EUROTeV-Memo & JINST 1 P10005 (2006) Works for all proposed ILC beam parameter sets, including (new) “High Luminosity” at 1 TeV ( GP++ large statistics at Compact SC QD,SD : NbTi LHC-like QD at 500 GeV, Nb3Sn SLHC-like QD at 1 TeV, NbTi 60 mm radius SD Standard warm QF & SF, with 20 and 30 mm radius Outgoing beam subject to non-linear pocket fields of QF1 and SF1 Losses in SC magnets [W]

First thoughts  needs to be worked out in detail

First look at beam pipe in FD region Separating the incoming beam and designing the shared region up to QEX1,2 (40 m) and BHEX1 (80 m) for the outgoing and beamstrahlung beams Separation of beamstrahlung after BHEX1 Analyze direct lines of sights to VD through BeamCal mask hole (r = 1.2 cm) Next :

Magnets and collimators in rest of line Designed proof-of-principle optics with reasonable QEX1,2, BHEX1 and BB1,2 apertures & strengths and acceptable losses on dedicated collimators at both 500 GeV and 1 TeV  EUROTeV-Memo Can be adjusted depending on best choice of dump arrangement Flexibility : magnet + beam pipe designs  final parameters worst case maximum : high luminosity parameters with vertical offset

(nominal beam parameters)

BHEX1 C-type bend Beamstrahlung  1 mrad cone Incoming beam outgoing beam envelope B y = T X [cm] B y (x) homogeneity < 4 % (with shims) within outgoing beam envelope  checked to be sufficient Residual B y on incoming beam ~ 1%  20  rad (7.5  x’ )  use corrector Residual B x (y) dependence on incoming beam  only even powers sextupole absorbed refitting SD / SF, decapole  negligible effects 3A / mm mm 2 Accommodates the beamstrahlung, outgoing beam POISSON and proximity of incoming beam

Comparison done with ILC final focus optics integrating FD of 2 mrad scheme

Further engineering for final design and costing QF, SF & BB1,2 “standard” magnets LAL & Cockcroft “Panofsky” – style large aperture quads  LAL & Cockcroft NbTi SC QD & large bore SF for 500 GeV CM R&D  Nb3Sn SC QD for 1 TeV upgrade : LBL & FNAL ? Investigate detector integration and push-pull scenarios Not considered in detail so far : dump and collimators improve d pocket fields  experienced warm magnet group Experienced warm magnet group Vol. 30, No. 10, , 1959 L. Hand & W. Panofsky, Review of Scientific Instruments beam pipe optics iteration  LAL & Cockcroft SC magnet group  should connect to baseline work on these LAL & Cockcroft together with existing team on baseline

Additional slides

Luminosity loss without crab-crossing ( perfect conditions ) L/L 0 2  [mrad] 20 mrad  L/L 0 ~ 0.2 ~ 0.85

QD 2.0mrad 1.0mrad incoming beam axis outgoing beam axis detector axis Symmetry consideration and BeamCal mask BeamCal with r  15mm in LDC, centred on detector axis  OK clearances Effective BeamCal aperture of 7mm radius GLD LDC QF1 QD0 VXD BeamCal Best case GLD, worst case LDC, but the collimation depths are acceptable

Optics for 500 GeV and 1 TeV EUROTeV-Memo

LAL/RT & EUROTeV-Report

Beamstrahlung photon cones Integrated power beyond half- opening angle

Combined Compton Luminometer & Polarimeter at IP ?!? luminosity P. Schüler C. Rimbault - Laser focused 10 m from IP, to 50  m -  crossing-angle = mrad - E  = 2.33 eV -  z,  = 10 ps - with = 25 – 50 W  Comptons / BX Comptons / BX VERY PRELIMINARY Collection efficiency ~ 5-10%

Combined Compton Luminometer & Polarimeter at IP ?!? luminosity P. Schüler C. Rimbault - Laser focused 10 m from IP, to 50  m -  crossing-angle = mrad - E  = 2.33 eV -  z,  = 10 ps - with = 25 – 50 W  Comptons / BX Comptons / BX VERY PRELIMINARY Collection efficiency ~ 5-10%

Connected beam dynamics and MDI investigations Not 2 mrad specific  combine with head-on & 14 mrad work Spent beam diagnostics to monitor IP beam sizes & offsets Impact of non-axial detector solenoid and pre / post-IP trajectory bumps on beam setup and optical tuning Detector background from beam and SR losses Post-IP relative energy & energy spread measurements IP Compton luminometry and polarimetry with high power laser and instrumented mask near the FD Optical tuning strategy and feedback algorithms