1 Session 18 Implementation of TOC at Tosoh, SMD Laura Blum Production and Inventory Control Manager.

Slides:



Advertisements
Similar presentations
Group 1 Ray Quintero, Lei Tian, Jiayin Liu, Morvarid Amirfathi, Rabeeh Sahranavard, Max Tubbs Production Control & Queuing.
Advertisements

Lean Manufacturing.
Profitability and Risk Management 1 Theory of Constraints Let’s go back to the CVP model: What “constrains” your profit? If you can choose X to be arbitrarily.
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management (Short-term Capacity Planning) 7.
Theory of Constraints Scheduling APICS PDM January 14, 2009.
Theory of Constraints Part II: TOC Concepts
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 18 Synchronous Manufacturing and the Theory of Constraints
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management 7 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Throughput World. 2 Ardavan Asef-Vaziri Nov-2010Theory of Constraints: 2- Basics Systems Thinking and TOC  TOC Premise 1: The Goal of a business is to.
© The McGraw-Hill Companies, Inc., Synchronous Manufacturing and Theory of Constraints.
PRODUCTION PLANNING ELİF ERSOY Production Planning2 WHAT IS PRODUCTION PLANNING?  Production planning is a process used by manufacturing.
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 16: Learning Objectives
THEORY OF CONSTRAINTS ACCT 7320 October 8, 2014.
Operations Management
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
JIT and Lean Operations
1 Slides used in class may be different from slides in student pack Chapter 18 Synchronous Manufacturing and the Theory of Constraints  Goldratt’s Rules.
Production Activity Control
Introduction to Theory of Constraints Competitive Manufacturing Management.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Dependent Events and Statistical Fluctuations
Operations and Production Management
JIT and Lean Operations
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
So What? Operations Management EMBA Summer TARGET You are, aspire to be, or need to communicate with an executive that does not have direct responsibility.
 Copyright, Ansari, Bell, Klammer and Lawrence, Management Accounting: A Strategic Focus, Irwin-McGraw-Hill, THE THEORY OF CONSTRAINTS AND THROUGHPUT.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
Course: ETLS Managing for Improved Performance Professor: George G. Gleeson Student: Kou Song.
Drum –Buffer-Rope Based on : R. Holt, Ph.D., PE
Mohamed Iqbal P Production and Inventory Control- Introduction (1) IEM Production and Inventory Control Introduction Mohamed Iqbal P.
Lean Accounting & Theory of Constraints Two related concepts ACCT7320, 2/3/09 1.
Theory of constraints Slovak University of Technology Faculty of Material Science and Technology in Trnava.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Synchronous Manufacturing and Theory of Constraints
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
1 Theory of Constraints Short-term Capacity Optimization.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
Activity Scheduling and Control
Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Drum –Buffer-Rope Based on : R. Holt, Ph.D., PE. Traditional Approach: Divide and Conquer Division of Labor breaks down linkages complex systems into.
The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox.
Purposes of Inventory 1. To maintain independence of operations. 2. To meet variation in product demand. 3. To allow flexibility in production scheduling.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Georgijs Buklovskis Member of the Board Association for Business Efficiency, Latvia Plant manager Brabantia Latvia Ltd. BMDA conference, Rīga, May, 8th,
5 © The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin 5 5 Slide 5-1 Target Costing,Theory of Constraints, and Life-Cycle Cost.
AXUG Partner Showcase – Introducing Preactor
Manufacturing Planning and Control
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
MEL751: Module on Theory of Constraints
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
MODULE 3 Manufacturing Methodologies
Synchronous Manufacturing and Theory of Constraints
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
Chapter 18: Inventory and Production Management
Synchronous Manufacturing
Constraint Management
Chapter 2:Theory of Constraints & ERP
Chap 11 Learning Objectives
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
SE503 Advanced Project Management
Drum –Buffer-Rope Based on : R. Holt, Ph.D., PE.
SYED SIBGHATULLAH HUSSAINI QUADRI
Theory of Constraints Part II: TOC Concepts
Synchronous Manufacturing and Theory of Constraints
Presentation transcript:

1 Session 18 Implementation of TOC at Tosoh, SMD Laura Blum Production and Inventory Control Manager

2 Overview Why we chose Theory of Constraints Overview of Theory of Constraints Implementation Results

3 Before TOC Manual scheduling using calendars & guesses Rough understanding of run times No clear measure of capacity No ability to forecast upcoming capacity constraints MRP system – poorly maintained

4 Why We Chose DBR Deliver product faster and more reliably –Short Product Life Cycles (6-12 months) Maximize throughput of factory Better Utilization of Resources Reduced Finished Goods Inventory –Increased flexibility –Minimize obsolescence

5 Why We Chose DBR (continued) Minimize batch sizes –Reduced cycle time –Improved responsiveness –Reduced WIP

6 Theory of Constraints Any manufacturing system has a very limited number of constraints The constraint limits the output of the entire system By controlling and maximizing the output of the constraint, you can control and maximize the output of the entire system

7 TOC: Drum-Buffer-Rope Drum – Another name for constraint or “bottleneck” –Detailed Schedule –Reduce set-ups –Maximize Machine availability Buffer – WIP to protect against variations in upstream operations –Represents time to resolve problems at upstream operations Rope – “Pull Signal” – total of upstream processing time and buffer time –Ties drum schedule to customer requirement –Ties material release schedule to drum schedule

8 Steps in TOC Identify drums Establish buffers Manage buffers Exploit drums Subordinate to the drums Elevate the drum Start over

9 Implementation The Drum – Scheduling –Identify Constraints –Identify First Day Loads The Buffer – Proactive Management –Determine the Buffer Size –Non-Drums operate in FIFO mode –Buffer Management – Managing the Exceptions –Identify causes of buffer “holes”

10 Drum Schedules

11 Implementation Exploit the drums –Work drums continuously –Reduce set-ups –Off-load work to non-drum work centers Subordinate everything to drum –Staffing –Maintenance –Engineering Support –Run Non- constraints FIFO –Buffer coordinator expedites at non-constraints to meet drum schedules

12 Implementation Elevate Drum – Increase Capacity –Add Capacity –Process Improvements –Offload Start Over – Identify new constraint

13 Paradigm Shift Traditional Measure Efficiencies Keep equipment running Focus on product cost TOC Measure Drum Performance and buffer attainment Maximize Throughput Revenue generated per drum time

14 Implementation Process Change Company Culture –Educate Personnel in DBR/TOC –Eliminate Cost Accounting Based Performance Measures (Productivity, Efficiency, Product Cost, etc.) –It’s O.K. for non-drums to be idle –Company-wide, not just manufacturing

15 Implementation Process (Continued) Began Manual DBR Purchased software to assist Developed Manufacturing Information Ongoing effort to change company culture

16 Implementation Process (Continued) Eliminate obstacles to flowing material –Raw Material Availability –Sense of Urgency in People –Process Reliability –Equipment Reliability –Scrap –Batch Processes

17 Achievements Non-Precious Product Sales Delivery Performance Lead Times Finished Goods Inventory WIP Reserves for obsolete inventory +14% +38% -14% -32% -14% -50%