Preparing GEO600 for Gravitational Wave astronomy (A status report) Martin Hewitson, AEI Hannover for GEO600.

Slides:



Advertisements
Similar presentations
Gravitational Wave Astronomy Dr. Giles Hammond Institute for Gravitational Research SUPA, University of Glasgow Universität Jena, August 2010.
Advertisements

19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Dual Recycling for GEO 600 Andreas Freise, Hartmut Grote Institut für Atom- und Molekülphysik Universität Hannover Max-Planck-Institut für Gravitationsphysik.
For the Collaboration GWDAW 2005 Status of inspiral search in C6 and C7 Virgo data Frédérique MARION.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Laser Interferometer Gravitational-wave Detectors: Advancing toward a Global Network Stan Whitcomb LIGO/Caltech ICGC, Goa, 18 December 2011 LIGO-G v1.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
GWDAW9 – Annecy December 15-18, 2004 A. Di Credico Syracuse University LIGO-G Z 1 Gravitational wave burst vetoes in the LIGO S2 and S3 data analyses.
Calibration of the gravitational wave signal in the LIGO detectors Gabriela Gonzalez (LSU), Mike Landry (LIGO-LHO), Patrick Sutton (PSU) with the calibration.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
GWDAW-8 (December 17-20, 2003, Milwaukee, Wisconsin, USA) Search for burst gravitational waves with TAMA data Masaki Ando Department of Physics, University.
LIGO-G D LIGO calibration during the S3 science run Michael Landry LIGO Hanford Observatory Justin Garofoli, Luca Matone, Hugh Radkins (LHO),
Calibration of TAMA300 in Time Domain Souichi TELADA, Daisuke TATSUMI, Tomomi AKUTSU, Masaki ANDO, Nobuyuki KANDA and the TAMA collaboration.
Towards dual recycling with the aid of time and frequency domain simulations M. Malec for the GEO 600 team Max-Planck-Institut für Gravitationsphysik Albert-Einstein-Institut.
Stefan Hild 1Ilias WG1 meeting, Sep 2005, Perugia Title GEO 600 Commissioning progress Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut)
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
LIGO-G Z Detector characterization for LIGO burst searches Shourov K. Chatterji for the LIGO Scientific Collaboration 10 th Gravitational Wave.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Stefan Hild October 2007 LSC-Virgo meeting Hannover Interferometers with detuned arm cavaties.
GEO‘s experience with Signal Recycling Harald Lück Perugia,
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
Status of LIGO Data Analysis Gabriela González Department of Physics and Astronomy Louisiana State University for the LIGO Scientific Collaboration Dec.
LIGO-G I S5 calibration status Michael Landry LIGO Hanford Observatory for the LSC Calibration Committee LSC/Virgo Meeting May 22, 2007 Cascina,
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
GEO600 Detector Status Harald Lück Max-Planck Institut für Gravitationsphysik Institut für Atom- und Molekülphysik, Uni Hannover.
Squeezed light and GEO600 Simon Chelkowski LSC Meeting, Hannover.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
Martin Hewitson Overview of DC work. GEO DC workshop June DC work Noise characterisation Noise projections, noise sources, noise couplings Calibration.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Noise Projections for GEO 600 Joshua Smith GEO Meeting
Stefan Hild 1GWDAW 10, Brownsville, December 2005 Status of GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
Harald Lückfor the GEO600 Comissioning team 1ILIAS Meeting, Palma, Oct Title GEO 600 Commissioning Status Based on a talk of Stefan Hild for the.
Status of GEO600 Benno Willke for the GEO600 team Aspen Meeting Aspen CO, January 2005 LIGO-G Z.
GEO600 Status Update Harald Lück Hannover, April 2005.
Status of coalescing binaries search activities in Virgo GWDAW 11 Status of coalescing binaries search activities in Virgo GWDAW Dec 2006 Leone.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
ILIAS WG1 meeting Han/Ruthe Harald Lück ILIAS WG1 meeting, Sep. 2004, Hannover/Ruthe GEO Status (Update)
Dual Recycling in GEO 600 H. Grote, A. Freise, M. Malec for the GEO600 team Institut für Atom- und Molekülphysik University of Hannover Max-Planck-Institut.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Stefan Hild 111th WG1 meeting, Hannover, January 2007 DC-Readout for GEO Stefan Hild for the GEO-team.
Martin Hewitson and the GEO team Measuring gravitational waves with GEO600.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
S.Klimenko, LSC, August 2004, G Z BurstMon S.Klimenko, A.Sazonov University of Florida l motivation & documentation l description & results l.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
ALLEGRO GWDAW-9, Annecy 16 December, Generating time domain strain data (h(t)) for the ALLEGRO resonant detector or calibration of ALLEGRO data.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Joshua Smith July 2004 Identifying limiting noise sources of GEO600 ILIAS WG1 Meeting Joshua Smith for the GEO team.
Joshua Smith August Identifying and eliminating limiting noise sources of GEO600 LSC Meeting, Hanford WA, August `04 Joshua Smith for the GEO team.
Status of GEO600 Benno Willke for the GEO600 team ESF Exploratory Workshop Perugia, September 2005.
LIGO-G Z Report on E3/E4 Lock Losses K. Riles - University of Michigan 1 Report on E3/E4 Lock Losses David Chin, Dick Gustafson Keith.
GEO Status and Prospects Harald Lück ILIAS / ETmeeting Cascina November 2008.
Stefan Hild 1GWADW, Elba, May 2006 Experience with Signal- Recycling in GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
Martin Hewitson and the GEO team Measuring gravitational waves with GEO600.
H1 Squeezing Experiment: the path to an Advanced Squeezer
Progress toward squeeze injection in Enhanced LIGO
Homodyne readout of an interferometer with Signal Recycling
Commissioning progress Stefan Hild Ilias WG1 meeting, Sep 2005
Measuring Gravitational Waves with GEO600
Report on the S2 Run Keith Riles (University of Michigan)
GEO HF Limits/Goals/Options…
Optimal on-line time-domain calibration of the
Preparing GEO600 for Gravitational Wave astronomy (A status report)
Status at the Prague meeting
Talk prepared by Stefan Hild AEI Hannover for the GEO-team
Presentation transcript:

Preparing GEO600 for Gravitational Wave astronomy (A status report) Martin Hewitson, AEI Hannover for GEO600

GWDAW 9, Annecy 2004 Talk overview Sensitivity of GEO600 Calibration update Data quality indicators and information

GWDAW 9, Annecy 2004 GEO600 optical layout 12W laser mode cleaner interferometer with dual recycling detector Attenuated to 2W 1% Transmission 1W 600m

GWDAW 9, Annecy 2004 Sensitivity progress (highlights) Typical S3 HPD lock + New MI+SR servo SR bench scattering

GWDAW 9, Annecy 2004 Target sensitivity

GWDAW 9, Annecy 2004 Noise projections - HP Current HP ESD Feedback SR Feedback PDO Amp noise Shot+detection Uncorr sum

GWDAW 9, Annecy 2004 Calibration of GEO600 Time-domain calibration method Optimisation routine is used to quasi- continuously estimate parameters of optical response Update rate is 1Hz Output is LSC-standard h(t) frame files

GWDAW 9, Annecy 2004 Calibration procedure Correct for MI loop and Optical transfer function(s) x =

GWDAW 9, Annecy 2004 On-line optical TF measurements actuator optical CAL P and Q

GWDAW 9, Annecy 2004 Calibration progress On-line calibration of both output quadratures HP and HQ Work on optimal combination is underway Estimation of optical parameters in real- time in control room On-line calibration leads to overnight runs

GWDAW 9, Annecy 2004 HQ sensitivity progress

GWDAW 9, Annecy 2004 Combining HP(t) and HQ(t) HP’ = (HP+HQ)/2 HQ’ = (HP-HQ)/2 Idea is that So we can form Do this in the time-domain to fit in with the current calibration method HP(t) = s(t) + np(t) HQ(t) = s(t) + nq(t)

GWDAW 9, Annecy 2004 Combining HP and HQ - result HQ’ contains almost no signal compared to HP’ Where noise behaves like cal lines, we have apparent displacement Useful diagnostic for noise hunting (?)

GWDAW 9, Annecy 2004 Introducing GEO Summary Pages A collection of automatically generated web page reports about GEO data quality To disseminate info about the growing amount of science data To aid in commissioning by having standard measurements to compare day by day. To learn about results of various analysis tools

GWDAW 9, Annecy 2004 Report list Click for details

GWDAW 9, Annecy 2004 Details page Lock list Sensitivity overview Spectra, BLRMS, Inspiral range Data quality Quality channel, calibration parameters Line catalogues Lines, harmonics, sidebands Glitch rate Time-frequency plots, histograms

GWDAW 9, Annecy 2004 What’s coming up Injected power increase (x2 or more) Main high-power diode in vacuum New office buildings and toilets S4 Continue overnight and weekend runs Increase power-recycling factor Noise hunting and working towards design sensitivity

GWDAW 9, Annecy 2004 The End

GWDAW 9, Annecy 2004 Noise projections - HQ Current HP ESD Feedback SR Feedback PDO Amp noise Shot+detection Uncorr sum