5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka

Slides:



Advertisements
Similar presentations
Jiri Kvasnicka, EUDET meeting at DESY 1 Optical fibre calibration system Jiri Kvasnicka Outline Results from recent tests – LAB Test.
Advertisements

HH Dec 13Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
LED calibration systems for CALICE hadron calorimeter June 11, 2011TIPP 2011, Chicago1.
Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
AHCAL Saturation Study CALICE week – Casablanca, Morocco 2010/09/22 Jaroslav Zalesak Institute of Physics, Prague / DESY Study of single SiPM response.
LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Ivo Polák SiPM needs short optical pulses
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak Institute of Physics (FZU), Prague June 11, 2011TIPP 2011, Kvasnicka1 The.
ECFA, JUN10, 2008Ivo Polak, IPASCR, Prague1 Electronics part of AHCAL calibration system ECFA meeting at Warszawa.
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
DESY, DEC-2013Ivo Polák, FZU, Prague1 Activity on Adaptive power & Calibration at Prague Ivo Polák, on behalf of Prague’s group QMB1A update.
Tests of the fiber-based calibration system CALICE collaboration meeting Cambridge, UK 2012/9/18 Jaroslav Zalesak Institute of Physics, Prague  QMB1 LED.
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
LED calibration systems for CALICE hadron calorimeter
Tests with JT0623 & JT0947 at Indiana University Nagoya PMT database test results for JT0623 at 3220V: This tube has somewhat higher than usual gain. 5×10.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
Uni Bergen:G. Eigen, J. Zalieckas, E. van der Kraaij FZU Prague: J. Cvach, J. Kvasnicka, I. Polák CALICE meeting, Argonne, 19/03/2014.
2013 MAR 21Ivo Polák FZU Prague1 Tasks for AIDA SiPM Adaptive HV PSU AIDA subgroup Prague 2013 meeting Characterization of temperature influence to SiPM.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
CALICE ANL, MAR18, 2008 Ivo Polak, IPASCR, Prague1 A fast LED driver prototype for HCAL calibration CALICE meeting at ANL, USA.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
Uni Bergen:G. Eigen, E. van der Kraaij, J. Zalieckas FZU Prague: J. Cvach, J. Kvasnička, I. Polák Linear Collider Workshop, Tokyo 13/11/2013.
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK)
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
Development of Multi-Pixel Photon Counters(MPPC) Makoto Taguchi Kyoto University.
Trip-t testing progress report
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
oct - 6Ivo Polák, FZU, Prague1 Calibration system for SiPM and LED notched fibre distributing system Ivo Polák, on behalf prague’s group
1 SiPM studies: Highlighting current equipment and immediate plans Lee BLM Quasar working group.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak, Institute of Physics, Prague June 11, 2011TIPP 2011, Kvasnicka1 The CALICE.
Gain stability and the LYSO beam radiation monitor measurements
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
Performance of new MPPC Nov. 21 Korea-Japan joint meeting Takashi Maeda Hideki Yamazaki Yuji Sudo (University of Tsukuba) --- Contents ---
ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 with HBU2 test Ivo Polák, on behalf of Prague’s group
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
2011 Sept 14-16Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
LED notched fibre distributing system Calibration system for SiPM
SiPM linearization status update
CEPC ScECAL Optimization for the 3th CEPC Physics Software Meeting
LED notched fibre system short HBU0 party with QMB6
A fast LED driver prototype for HCAL calibration
LED notched fibre system at AHCAL Calibration system for SiPM
A fast LED driver prototype for HCAL calibration
Scintillator HCal Prototype
Presentation transcript:

5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka 1.QMB6 performance with HBU0, saturation of SiPM 2.Toroidal inductor at PCB 3.Notched fibre light distribution systems 3x24 4.Conclusions

5 July 2010Jiří Kvasnička, FZÚ, Prague QMB6 performance on HBU0 Outline SinglePE in HG Amplitude scans at LG HG vs LG ratio measurement 1 st correction of ASIC gain Optical power measured in Prague 2 nd correction of output optical power

5 July 2010Jiří Kvasnička, FZÚ, Prague Single PE spectrum HG mode, 100fF feedback capacitance Statistics of 50K events Big spread of single_photon_peak distance [ADC count / pixel] among the channels SiPM voltage settings? ASIC1 ASIC0 Fibre end

5 July 2010Jiří Kvasnička, FZÚ, Prague Amplitude scan Scan at LG, 400fF ASIC should not be saturated (range up to 4095 bins)

5 July 2010Jiří Kvasnička, FZÚ, Prague HG vs LG radio measurements 1 st measurements were measured only in one fixed amplitude. These data were presented in April. Analysis showed, that some channels were saturated in HG mode. Therefore: we scanned the ratio in several (optical) amplitudes Data were taken at amplitudes, where –Signal is not saturated in HG mode –Signal is still reasonably high in LG mode Can the radio be measured by charge injection? How does it correspond? Pedestal shifts during measurements? Old data 29/4/2010

5 July 2010Jiří Kvasnička, FZÚ, Prague Amplitude scan corrected (1) From the distance between single photon peaks and from the HG vs. LG ratio, we are able to estimate the number of fired pixels New recalculation: –delivered optical power from the fibre is much more consistent –Curves are less crossing each other Next step: convert V1 value to optical power (energy) Presented 29/4/2010 Recalculated gain

5 July 2010Jiří Kvasnička, FZÚ, Prague Optical performance at Prague lab Equipment: Thorlabs PM100D & S130VC Slope is not linear, especially at very low amplitudes Reason: energy is stored in the inductor and the peak voltage has to rise above the V2 and the voltage drop of the UV LED 5mm LED3mm LED

5 July 2010Jiří Kvasnička, FZÚ, Prague Amplitude scan corrected (2) Linear extrapolation of the initial slope indicate the dynamic range of ~200 MIPs Final comments: The estimated number of fired pixels is larger than the real number of SiPM pixels Different shapes of saturation curve might indicate improper HG vs LG ratio Saturation curves does not match simple f(x)=1-exp(-x) function (unsuccessful fits) Not yet analyzed: shifts among ASIC memory cells (pedestal and data), crosstalk among memory cells, crosstalk among channels

5 July 2010Ivo Polák, FZU, Prague Test PCBs with toroidal inductor Collaboration Meeting 60 x 30 mm^2 30 x 60 mm^2 4 layers  11 turns  9 turns 3 PCB thicknesses: 0.8, 1.2, 1.8, 3.2mm 1.Test mechanical dimension, thickness of PCB on inductance 2.test GND-plane influence

5 July 2010Ivo Polák, FZU, Prague Top layer, Top layer, pads at right are for smd capacitors L C C 1. First to measure resonant frequency of parasitic capacitors, only. 2. To get value of L, we add larger parallel C, all 200pF with tolerance 1%, And measure the resonance frequency by GDO meter. GDO = Grid Dip Meter, handy instrument to measure resonant frequency of LC circuit After recalculating, we can see a spread of L and parasitic C (effect of GND layer)

5 July 2010Ivo Polák, FZU, Prague Table of inductance values in MHz Test setup is proven, but precise frequency meter (counter) is needed. Internal counter of scope TDS 2024 is the weak point. We will repeat the measurement to satisfy the precision. Thickness0.8mm1.2mm1.8mm3.2mm Capacitor [pF] PCB nr.1234 position A B C D E F G H I J

5 July 2010Ivo Polák, FZU, Prague Intermediate solution for LED light distribution Full length plane = 72 tiles in row Production of 1 fibre with 72 notches is tedious and expensive Agreement reached: 3 parallel fibres, each 24 notches (2 HBUs) For final calo we still plan to use full length fibre with 72 notches – automation needed HBU6HBU5HBU4HBU3HBU2HBU1 2 HBUs = 1 fibre with 24 notches 3 fibres receive light from 1 LED

5 July 2010Ivo Polák, FZU, Prague Conclusion We generate optical pulse 250mip equivalent, from single tap PCB toroidal inductors partly tested, redo with precise counter –An analyze is ongoing Preparing intermediate solution of layout: 3 fibres by 24 notches

5 July 2010Ivo Polák, FZU, Prague BACK-UP

5 July 2010Jiří Kvasnička, FZÚ, Prague Backup: Multi-peaks of non-tuned LEDs “steps” in DNL graph corespond to secondary peaks. These peaks are unwanted, because they make optical pulse longer. Reason: incorectly damped resonance of QRLED driver