1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA TENTS.

Slides:



Advertisements
Similar presentations
Sector Development, EU Accession and International Assistance: The case of Serbia Paul Wafer, Head of DFID Serbia October 2008.
Advertisements

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA Evidence-based policy: myth or reality? Dylan Winder.
Danny Graymore, Deputy Head, Africa Regional Department (ARD) and Terri Sarch, Agriculture Adviser, ARD May 2009 DFIDs Regional Integration Work 1 Palace.
Evolution in the ShelterBox Solution Since 2000… Developments in whats in a ShelterBox Developments in individual items in the ShelterBox Improvements.
IN-PLACE PROTECTION. LEARNING OBJECTIVES Explain the objective of In Place Protection Identify the means of warning List the criteria in choosing room.
Tent Pitching.
Slide 1 Value for Money and Civil Society Civil Society Department February 2011.
Architectural Drawing
How to assemble a tent Note there are two parts to the tent – inner and outer.
Measurement for Civil Engineering works
16 th -17 th November 2006 | Geneva | co-hosted by UN-Habitat and CARE followed by Shelter updates: Volunteer, Register, Funding, Base Shelter Centre Shelter.
Double stretcher for two adults Kvik-Cot (Kamp Rite) used only few nights new sale price $159 (plus shipping) now $90 For details, technical and picture.
TENT-PITCHING THEORY. PURPOSE Camping is one of the regular activities in NPCC. Campers have to stay in tents at Adventure Training Camps in Pulau Ubin.
3 steps leading to platform TABLE BENCHBENCH BENCHBENCH Act I Sc 1 Top view Platform 4 x 16’ (5’ are under steps) Widow Corney’s room/ Public house alcove.
ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007.
4 - 5 May 2006 | Geneva | hosted by IFRC Shelter Module update Jérôme Michon MSF-B Tom Corsellis Shelter Centre followed by: Guatemala, Bangladesh and.
Challenges for Official Donors: INTRAC Conference – Whatever Happened to Civil Society Roy Trivedy Civil Society Department DFID December 2008.
Dr David J. Grimshaw Research and Evidence Division, UK Department for International Development, Warwick, 15 January Funding for Research.
Drafting Rear Elevations. Start with outer frame when drafting standard flat. Heights are generally in multiples of 2’-0”. Outer Frame.
Topic C1 Superstructures - walls
Session Objectives By the end of the session you should understand
DFID Central Research Department: Agricultural Research and Southern Africa.
Sonya Sultan Social Development Adviser Policy Division Social Transfers to Tackle Child Poverty 1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
Can Challenge Emily and Amina The Silver Demon. Materials.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
General Instructions for “KidWind Light” wind tunnel.
DFID and CSR: Responsible business for poverty reduction Jillian Popkins Business Alliances Team 24 th April Palace Street, London SW1E 5HE Abercrombie.
Introduction to the Competition Assessment Framework Seminar on Enhancing Development through a Competition Culture 14 August 2008, New Delhi Roger Nellist.
Dennis Pain DFID Social Protection Team Leader 26 March 2009 UNICEF Staff Conference, Montreux 1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham.
What aspects of national plans are critical to DFID for the scale and alignment of aid? Emerging themes from the consultation process for DFID’s new White.
The Elephant in the Room: the MDG Capacity Gap for water and sanitation Peregrine Swann Department for International Development, UK.
Peter D’Souza Growth Team Department for International Development Contribution of Competition to Growth 1 Palace Street, London SW1E 5HE Abercrombie House,
Slide 1 11 November 2011 International Forestry and Climate Research Knowledge Uptake Policy Practice Results.
22 Elevations Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Introduction to Elevations Elevation –An.
Greenhouse Types. Types of Greenhouses Detached – Quonset – Gothic Frame – Even Span – A Frame Attached – Lean to – Even span.
Windows 1.Put up black curtains or put black paper over the windows when an air raid is on. This is called making a blackout. If you do not put up the.
NFI and shade booklet 1 South Asia earthquake Some exemple of MSF response 2 NFI Why NFI in MSF ? Working group New kits 3 Shade net Booklet The process.
CLASS-V SUB: EVS TOPIC: A SHELTER SO HIGH
Cross Stitching Cross stitching is when you make an “ X ” by crossing one stitch over another. Today, we are just going to be doing ½ stitches like this.
Civil Society Challenge Fund 20 th June 2006 Maggie Di Maio Janette Kirk Robert Morrison Robert MacIver 1 Palace Street, London SW1E 5HE Abercrombie House,
The Results Chain Impact Outcomes Outputs Process Inputs
Lisa Curtis – Private Sector Adviser, Sierra Leone UK Department for International Development 6 October 2006 DFID Working with the Diaspora: Investment.
Name: Julia Chandler Job Title: Intranet/Website manager Date: 11 September Knowledge Management at DFID 1 Palace Street, London SW1E 5HE Abercrombie House,
Accessing and using data Donor needs 1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA Siobhan Carey Chief.
Nick York and Miguel Valadez Laric Economist, Evaluation Department 15 th November 2006 Impact Assessment Case Study: Monitoring Corruption in Indonesia.
David Gray, PFM Working Group Chair January 2007 LCG Governance Progress in PFM 1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East.
Ernesto Jeger Governance Adviser DFID June 2007 How Governments and Development Partners Can Work Effectively to Achieve Results Working with SAIs in Brazil.
Set Construction Essential Question:
What do donors want ? Tamsin Vernon and Yvan Biot Climate Change Adaptation Team 12 April Palace Street, London SW1E 5HE Abercrombie House, Eaglesham.
Aid For Trade and EPAs Burgers Park Hotel, Pretoria August 2006 Helena McLeod Regional Trade and Integration Advisor – DFID SA.
 Each one of us wants our living rooms and bedrooms to look attractive. And we all have trouble decorating bedroom.  The trouble is that there are so.
Early warning systems and prediction are important in the management of blizzards. People can avoid being caught out in the open by these snowstorms by.
South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 WARM, HUMID CLIMATE.
UK STRATEGIES TO ACHIEVE THE MDGS 1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA.
Tent Pitching 1. Materials needed to pitch a tent: Equipment : Quantity : Remarks : 1 Inner Sheet 1-With door flaps at both ends and wall flaps on both.
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
Components- fastenings
Instructions For Using The Home Traction Unit
Donor Experiences of Development Aid Statistics – United Kingdom
Good morning, my name is……
Tents Front cover.
How to pitch a D of E Tent..
EAST KILBRIDE ATHLETIC CLUB
...attach the ropes to the pegs.
TYPES OF HOUSES.
HW#3 Product Microwave 구상준 류형기 박영민.
Using an Epsilon trap…. Call that a cow! Who are they kidding?
Value for Money and Civil Society
Tom Kelly Regional Food Security Adviser 17 February 2006
Presentation transcript:

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA TENTS

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA TECHNICAL DRAWINGS

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA TENT KIT COMPONENTS

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA CLEAR GAP BETWEEN INNER AND OUTER FLY

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA IMPROVED QUALITY OF STITCHING

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA IMPROVED QUALITY OF MUDFLAP

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA BETTER CUT CLOTH

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA JOINS OF D RING TO CLOTH MORE DURABLE

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA WINDOW MESH

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA INCREASED HEIGHT OF CENTRE RIDGE AND WALLS

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA REDUCED FRAYING OF ROPE AND CHANGE OF TENSIONER

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA OVERLAP STITCHING

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA GROUNDSHEET TO IFRC SPECIFICATION WITH TOGGLES

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA ROPE OF DOORS CHANGED FOR EASE OF USAGE

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA DFID SHELTERMARK AND PLASTIC POCKET

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA ROPE ATTACHMENT

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA BLACK WEBBING

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA WINDOW HEIGHT

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA VELCRO ON FLUE HOLE AND WINDOWS

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA FLUE HOLE AND COVER

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA VENTILATION WITH VELCRO

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA EYELET TESTING

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA PLASTIC SHEETING KIT

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA WATER CONTAINER TESTING

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA Water Container Testing

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA Water Container Testing

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA Weights, Dims and Cost ItemVolume (cbm)Weight (kg)Cost ($) Plastic Sheeting (5 sheets of 4x6m) Shelter Bale (Consists of 2 kits) Poles and Pegs for Shelter Kit Previous Tent Design Current Tent Design

1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA Thank You Any Questions?