HIGHWAY INSPECTION CRITERIA All roads are inspected at least twice a year. The intervention criteria identifies all trips on the footway over 25mm to be.

Slides:



Advertisements
Similar presentations
Lean Six Sigma Reducing Pothole Response Time Bob Kennedy, Street Department.
Advertisements

Total Productive Maintenance
A framework for organising and financing infrastructure provision Jan-Eric Nilsson, VTI.
CITY CENTRE Neighbourhood Environmental Projects Overview Environment Forum 17 th December 2013.
1 Date: Northamptonshire County Council and Kier Getting it ‘right first time’ County Councils Network Annual Conference Annual Conference 19 th November,
HIGHWAYS MAINTENANCE IN BLACKPOOL An overview of the current situation.
Using Data to Improve Customer Service Resolution using RAMM GIS Presented by Simon Gough (Roading Asset Manager) Acknowledgements to my co-writer: Hilton.
Slide 1 Newlon Housing Trust: Customer Satisfaction Surveys 2014/15 Q1-3.
Corporate Director Head of Planning and Transport Development Control Building Control Strategic Planning Transport Policy and Programmes Traffic and Parking.
TXDOT Asset Maintenance
DAYTIME DIMMING PHOTOCELL © Radix Traffic Limited 2012Patent Applied For THE RADIX TRAFFIC INTELLIGENT DAYTIME DIMMING UNIT (IDU600)
1 Financial Policy Panel - Performance Management Reporting: Quarter 4 Guide to reporting Key Service Priorities carried over from 2005/06 Key Service.
1 Portobello & Craigmillar Environment Forum February 2013 East Neighbourhood Roads Services.
City Transportation Funding Overview House Transportation Committee January 13, 2004 Ashley Probart AWC Transportation Coordinator.
1 Faculty of Public Health Continuing Professional Development Scheme.
OFSTED School Inspection 2009_KDR 22 May OFSTED School Inspection 2009.
Key Findings and Implications for the Future from the Stock Condition Survey undertaken by Savills Presented by Winston Williams January 2008.
Ealing Conference 15th November 2003 Martin Thomas ODPM’s Community Housing Task Force.
Report to Council Staff Opinion Survey HR Director 6 March 2009.
Update on effects of move to Shared Services Centre PPUAC 21 October 2009.
Green Light-Go Program Pennsylvania’s Municipal Signal Partnership Program April 7, 2015 Daniel Farley Chief, Traffic Signal and Arterial Management Section.
Members Seminar 15 September 2014 Flood Risk Christina Harrhy – Chief Officer, Neighbourhood Services Stephen Jarrett, Andrew Villars, Mark Strickland.
Support for the Long Term Unemployed Help to Work Support Supervised Jobsearch Pilots TSEF 28 November 2013.
CSS Compliance Testing Project Presented by Chris Walker CSS 18 May 2005.
Highways and Engineering Savings and Efficiencies Review November 2010.
Ealing Council and Ealing Homes – Relationship, roles and responsibilities for Repairs and Maintenance Presentation to Repairs Scrutiny Panel 18/9/07.
M aintenance Efficiency & Cost Effectiveness Initiative Robert M. Peda, P.E. Director, Bureau of Maintenance & Operations, PennDOT MQA Peer Exchange October.
Kern Motorist Aid Authority Services And Operations.
1 Strategy and Resources Committee - Performance Management Reporting: Quarter 4 Guide to reporting Key Service Priorities 2006/07 Key Service Priorities.
Buckinghamshire County Council 1 Winter Service Presentation to Members November 4 th
Audit Advisory Committee Public health transition update 22 January 2013.
Hertfordshire Highways Overview & Scrutiny Committee Briefing 24 November 2011 Danny Kyan St Albans District Manager.
It’s Not How Big it is – It’s How You Use it! Peter Andrews Business Support Manager Royal Borough of Windsor & Maidenhead.
Highways and Engineering Consultation Presentation.
Transfer of Private Sewers and Lateral Drains CHC Task and Finish Group October 2011 Nigel Godfrey Private Sewer Transfer Programme Team.
MICE Collaboration meeting (CM20) At RAL 10 – 13 Feb 2008 AFC Magnet – Status and Progress W. Lau, Oxford University.
Province of the EASTERN CAPE ROADS & PUBLIC WORKS DEPARTMENT OF ROADS AND PUBLIC WORKS PROVINCE OF THE EASTERN CAPE MONITORING SYSTEMS ON POTHOLE REPARATION.
1 ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2014 Reforms, Challenges and Safety Treacys West County Hotel, Ennis, May 2014.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
ROAD 2001 THE ROAD AHEAD. ROAD 2001 and Beyond The Way Forward Vision Policy Objectives Partnerships Best Practice Asset Management Resource Allocation.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
Demonstrating value for Money in a DLO Rob McNaughton.
Highway Reactive Maintenance Darren Coffin-Smith May 2014.
Communities M40 J12-J14 – Data Analysis, Modelling and Scheme Development.
Highways Investment Strategy May Background 1,100 km of roads One of the lowest spends in the country Consecutive years of severe weather Significant.
Nottingham City Council Local Transport Progress and Achievements Pete Wells UKPMS Officer/ Asset Management Rasita Chudasama Local Transport Plan Coordinator.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
CONSTRUCTING WEST MIDLANDS Question & Answer Session 22 nd March 2011 LOT 7 – CAPITAL WORKS.
Mobile Working For Housing Repairs and Maintenance Mick Roberts Repair Operations Manager Ongo Homes.
Rent Review 2013/14. Agenda The Council’s Budgets The Housing Revenue Account Housing Subsidy – A Reminder The New System Your Priorities Highlights from.
- 1 - Noticing the Work Julie Payne – SSE Street works Manager.
Flood Response and Recovery Tony Hanson Environmental Protection Manager Jarrow and Boldon Community Area Forum Thursday 25 th October 2012.
1 Ownership.Trust and respect. Inclusion and support. Sustainability. Innovation. Inspiration and passion. Paul Tysoe Asset Management Engineer Northamptonshire.
1 Briefing for Schools and Education Department Lisa Bibby Director Schools and Education 16/ 19 November 2012.
Consultation Process within the Street Lighting PFI SSE Contracting Working in partnership with Nottingham City Council.
Driver Rating Program.  Why Evaluate Driver Performance?  Easily identify problem areas to develop management strategy.  Identify specific driver deficiencies.
South Tyneside Street Lighting and Highway Signs PFI Project Community Area Forum Presentations 2008 Hebburn.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
Budget 2005/2006 Focusing on Our Priorities BUDGET CONSULTATION Social Care and Health Scrutiny Committee 25 th January 2005.
Saints Peter and Paul Sixth Form
Town Road Improvement Project Communication Plan
European Asphalt Pavement Warranties Scan
How the MAC is driving improvements and efficiency
Hounslow Highways Hounslow Highways Cleansing First 5 Years
OFSTED School Inspection 2009
Historical problems Tasks being done; just not coordinated and effective. No clear line of sight to client (Highways England) objectives. No defined asset.
Gareth Barwell – Head of Place Management, Edinburgh City Council
CSS Update for CoMC 19th September 2018
How are we doing? Performance Summary April 19 – June 19
World-Changing Glasgow Transformation Programme Board Summary
Presentation transcript:

HIGHWAY INSPECTION CRITERIA All roads are inspected at least twice a year. The intervention criteria identifies all trips on the footway over 25mm to be actionable and all potholes over 50mm in the carriageway. Normal response times are “within 28 days” however where is an immediate danger to life and limb these are reduced to 2 hr and 24 hr. 100% of all 2 hour and 24 hour responses are now completed within timescale. Within a year of Urban Vision’s creation an inspection regime was set up to inspect every minor works job carried out. Deficiencies are also picked up by the Safety Inspector at the next routine inspection (1 month / 3 months / 6 months).

FAULT REPORTING Emergency and urgent works (2 hour / 24 hour) are handled via the call centre. Remaining works are organised into area batches. All customer reports are logged via the Customer Services module within Confirm. Customer feedback for all enquires is recognised as being an an important issue. Although public satisfaction surveys are now carried out as part of the capital programme this has not yet been extended into revenue works.

WORKS ORDER SUMMARY

HIGHWAYS & HOUSING - SUMMARY OF CLAIMS COSTS

PERSONAL INJURY ALL SURFACES

TOTAL NUMBER OF CLAIMS RECEIVED

CLAIMS BY SURFACE

INVESTMENT CASE - PAYOUT AGAINST TRIPPING CLAIMS

STREET LIGHTING The response time for street lighting faults is “within 5 days” Inspection service provided by an external contractor since October Inspection regime is a twenty-day cycle from April to the end of September and a ten-day cycle from October to the end of March. Outages are sent electronically to Highway Services by 10-00am on the following morning. Faults are then batched and allocated to repair teams. When Urban Vision was formed the average response time was 10.2 days consequent improvements have reduced this to below 5 days. Confirm system is now being cleansed which should yield further benefits.

ILLUMINATED TRAFFIC SIGNS Historically the maintenance of illuminated traffic signs has been under funded. Existing “burn to extinction” policy relies heavily on fault reporting by members of the public. Urban Vision believe that this does not provide best value. The preparation of a full data set including the type and location of signs is currently underway. Much of this work has now been completed and Urban Vision will shortly switch the maintenance regime to a cyclic schedule. Cycle time will be determined by the existing budget.

CURRENT PROJECTS Street lighting Investment Case. Improved Maintenance Regime (lower intervention criteria).